HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #4461  
Old Posted Jan 15, 2018, 4:32 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Reecemartin View Post
Look at the distances between several Skytrain station pairs, some are HUGE.

ION as an example already seems to be set up to be quite successful and it has several on street streetcar style segments.

I think you are painting things too much in Black and White, if Surrey needs to wait for Skytrain to lay rails it might be 20 years before the second biggest city (probably the largest ) has any significant rail infrastructure (which indeed is capable of higher build out capacity full stop).


As an aside it kind of comes off as condescending, when you talk the way some of these come off. No need to get so serious...

On a totally different note, how are the options in terms of Hydro ROW's? Might be an interesting way to expand some higher capacity commuter rail.
Are you saying that Surrey should waste money today instead of waiting till tomorrow?
     
     
  #4462  
Old Posted Jan 15, 2018, 4:40 AM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
Quote:
Originally Posted by swimmer_spe View Post
Are you saying that Surrey should waste money today instead of waiting till tomorrow?
Well that implies that LRT is a waste, which is more of the Black and White thinking I am referring to. It's clearly not as good as Skytrain but, its definetly higher capacity than BRT in a lower cost in the long run (3+ car trains, cheaper maintenance). If we are always just waiting until tomorrow to do things bigger and better we are denying ourselves solutions that can certainly operate better than the status quo. And this is coming from someone who rides the 321 and 96 a lot.
     
     
  #4463  
Old Posted Jan 15, 2018, 5:28 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Reecemartin View Post
Well that implies that LRT is a waste, which is more of the Black and White thinking I am referring to. It's clearly not as good as Skytrain but, its definetly higher capacity than BRT in a lower cost in the long run (3+ car trains, cheaper maintenance). If we are always just waiting until tomorrow to do things bigger and better we are denying ourselves solutions that can certainly operate better than the status quo. And this is coming from someone who rides the 321 and 96 a lot.
If the current B Line was at the ridership the 99 is, I would say that it is worth it to go to LRT now.

I would say to hold off and build Skytrain.
     
     
  #4464  
Old Posted Jan 15, 2018, 6:08 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,163
Quote:
Originally Posted by Reecemartin View Post
Look at the distances between several Skytrain station pairs, some are HUGE.
And some are tiny (Olympic->Broadway, Joyce->Patterson->Metrotown, etc). It averages out as roughly the same spacing as some of the higher-capacity LRTs.

Sorry, I assumed you meant the spacing along Newton-Guildford, which is indeed equal for BRT, LRT and RRT; again, in a race between all three, SkyTrain wins handily but LRT comes in second by one minute.

Quote:
Originally Posted by Reecemartin View Post
ION as an example already seems to be set up to be quite successful and it has several on street streetcar style segments.

I think you are painting things too much in Black and White, if Surrey needs to wait for Skytrain to lay rails it might be 20 years before the second biggest city (probably the largest ) has any significant rail infrastructure (which indeed is capable of higher build out capacity full stop).
Waterloo also has less than half as much congestion as Metro Van. But don’t take my word for it.

As for 20 years, that seems a tad exaggerated. Again, we get a new SkyTrain project about every 7 years (Millennium in 2002, Canada in 2009, Evengreen in 2016, etc); assuming the Broadway and Langley extensions open in 2023, then Newton-Guildford is first in line for the next round of projects to be finished by 2030, meaning a 12-16 year wait at the very latest. In that context, being stuck with at-grade, non-buried LRT for 30-40 years does indeed seem like a waste.

Quote:
Originally Posted by Reecemartin View Post
As an aside it kind of comes off as condescending, when you talk the way some of these come off.... I'm just trying to keep things relaxed
Heh, then you better avoid Stingray, Vin, Vancouverofthefuture or Colin (who I believe called you a “poster boy of blind support for LRT” and accused you of “stereotypical Toronto arrogance”). I myself try to avoid such harsh language.

Genuine question: which parts are condescending? I’ve been posting like this on SSP for over three years now; I apologize again if I offended, and I can try to be more tactful, but also consider the idea that you might be taking this a bit too personally.

Quote:
Originally Posted by Reecemartin View Post
On a totally different note, how are the options in terms of Hydro ROW's? Might be an interesting way to expand some higher capacity commuter rail.
Now that would be a good route for LRT to spur development along. Head up the interurban route from Newton, switch to the Hydro route, connect to the Langley extension and either stop there or head north along 152nd to Guildford.
     
     
  #4465  
Old Posted Jan 15, 2018, 7:42 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
Quote:
Originally Posted by logicbomb View Post
Construction of the 105A Ave collector has begun. Hawthrone Park looks rather bare now...was not expecting that many trees to be removed.

Asked a few questions to an engineer inside:

105A Ave will have 30km/hr speed zones from 139 ST to 144 ST and 146 ST to 150 ST.

104th Ave will be down to one lane each way. No right turn or left turn lanes because they will widen sidewalks.

The City of Surrey wants TL to run parallel transit service down 105A over 104th Ave due to the reduction in road capacity.
Lol 30km/hr. I'm sure lots of crosswalks and ped lights. Jeez if you're gonna bulldoze a park might as well build a good road through it.
     
     
  #4466  
Old Posted Jan 16, 2018, 2:11 AM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
Quote:
Originally Posted by Migrant_Coconut View Post
Waterloo also has less than half as much congestion as Metro Van. But don’t take my word for it.

As for 20 years, that seems a tad exaggerated. Again, we get a new SkyTrain project about every 7 years (Millennium in 2002, Canada in 2009, Evengreen in 2016, etc); assuming the Broadway and Langley extensions open in 2023, then Newton-Guildford is first in line for the next round of projects to be finished by 2030, meaning a 12-16 year wait at the very latest. In that context, being stuck with at-grade, non-buried LRT for 30-40 years does indeed seem like a waste.

Heh, then you better avoid Stingray, Vin, Vancouverofthefuture or Colin (who I believe called you a “poster boy of blind support for LRT” and accused you of “stereotypical Toronto arrogance”). I myself try to avoid such harsh language.

Now that would be a good route for LRT to spur development along. Head up the interurban route from Newton, switch to the Hydro route, connect to the Langley extension and either stop there or head north along 152nd to Guildford.
With regard to Waterloo from personal experience it's very similar to Surrey. I'm sure high congestion in areas like the NS and Van drive up the overall numbers.

While of course we have seen them typically about every 7 years I don't think anyone would diagree that is very speculative. That's also probably not factoring major expansions/rebuilds on the Canada Line and Expo Line that may need to occur.

I truly appreciate that it doesn't go to insults, not only is that unintelligible but it's also childish. (And I don't even live in Toronto all the time lol)

Using the hydro corridors would be wise, especially in Langley where they could be used to access several communities.
     
     
  #4467  
Old Posted Jan 16, 2018, 2:13 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Reecemartin View Post
With regard to Waterloo from personal experience it's very similar to Surrey. I'm sure high congestion in areas like the NS and Van drive up the overall numbers.

While of course we have seen them typically about every 7 years I don't think anyone would diagree that is very speculative. That's also probably not factoring major expansions/rebuilds on the Canada Line and Expo Line that may need to occur.

I truly appreciate that it doesn't go to insults, not only is that unintelligible but it's also childish. (And I don't even live in Toronto all the time lol)

Using the hydro corridors would be wise, especially in Langley where they could be used to access several communities.
The difference is that K/W is a island of urban in a farmland. Surrey is not so.
     
     
  #4468  
Old Posted Jan 17, 2018, 6:08 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,163
Quote:
Originally Posted by Reecemartin View Post
With regard to Waterloo from personal experience it's very similar to Surrey. I'm sure high congestion in areas like the NS and Van drive up the overall numbers.

While of course we have seen them typically about every 7 years I don't think anyone would diagree that is very speculative. That's also probably not factoring major expansions/rebuilds on the Canada Line and Expo Line that may need to occur.

I truly appreciate that it doesn't go to insults, not only is that unintelligible but it's also childish. (And I don't even live in Toronto all the time lol)
Well, that's the point. If Surrey was its own city and not part of a metro, traffic would be lower and LRT would be fine.

There's major rebuilds on the Expo right now (part of the ten-year plan), so I doubt that it's an either/or dilemma between new SkyTrain lines and upgrading existing ones.
Also note that actual construction takes around 4 years; the rest is surveys, construction delays and financial/political crap. If anything - especially given the increased revenue from the Broadway and Langley extensions - 7 years seems pessimistic.

Agreed - this isn't YouTube or 4chan.
     
     
  #4469  
Old Posted Jan 17, 2018, 6:21 AM
logicbomb logicbomb is offline
Joshua B.
 
Join Date: Sep 2010
Posts: 1,210
Quote:
Originally Posted by flipper316 View Post
Lol 30km/hr. I'm sure lots of crosswalks and ped lights. Jeez if you're gonna bulldoze a park might as well build a good road through it.
There's going to be so many new lights over existing corridors and Central City. KGB has seen a major increase in traffic lights. 108th Ave, 104th Ave, 100th Ave will see more lights added.

I argue roundabouts would have been a better solution for some of these intersections.
     
     
  #4470  
Old Posted Jan 17, 2018, 5:14 PM
stump's Avatar
stump stump is offline
Registered User
 
Join Date: Sep 2009
Posts: 126
Quote:
Originally Posted by logicbomb View Post
There's going to be so many new lights over existing corridors and Central City. KGB has seen a major increase in traffic lights. 108th Ave, 104th Ave, 100th Ave will see more lights added.

I argue roundabouts would have been a better solution for some of these intersections.
Are these corridors not considered arterial roads?

Definition from wiki : The primary function of an arterial road is to deliver traffic from collector roads to freeways or expressways, and between urban centres at the highest level of service possible.

In traffic engineering hierarchy, an arterial road delivers traffic between collector roads and freeways. For new arterial roads, intersections are often reduced to increase traffic flow.
     
     
  #4471  
Old Posted Jan 17, 2018, 5:18 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,722
Quote:
Originally Posted by stump View Post
Are these corridors not considered arterial roads?

Definition from wiki : The primary function of an arterial road is to deliver traffic from collector roads to freeways or expressways, and between urban centres at the highest level of service possible.

In traffic engineering hierarchy, an arterial road delivers traffic between collector roads and freeways. For new arterial roads, intersections are often reduced to increase traffic flow.
Yes, Surrey does consider them to be arterial roads. You can check out their map on where they consider arterial roads to be.
     
     
  #4472  
Old Posted Jan 17, 2018, 5:32 PM
go_leafs_go02 go_leafs_go02 is offline
Registered User
 
Join Date: Dec 2007
Location: London, ON
Posts: 2,406
Quote:
Originally Posted by CanSpice View Post
Yes, Surrey does consider them to be arterial roads. You can check out their map on where they consider arterial roads to be.
Here's an even cleaner and more updated map if interested:

http://www.surrey.ca/files/RoadClassificationMap.pdf
     
     
  #4473  
Old Posted Jan 18, 2018, 2:13 AM
logicbomb logicbomb is offline
Joshua B.
 
Join Date: Sep 2010
Posts: 1,210
Quote:
Originally Posted by stump View Post
Are these corridors not considered arterial roads?

Definition from wiki : The primary function of an arterial road is to deliver traffic from collector roads to freeways or expressways, and between urban centres at the highest level of service possible.

In traffic engineering hierarchy, an arterial road delivers traffic between collector roads and freeways. For new arterial roads, intersections are often reduced to increase traffic flow.
My bad. Should have clarified that the City should have opted to use roundabouts within the region on smaller roads like the 105A Ave connector. I saw a rendering that had lights at 144 ST, 142 ST, 140 ST and 139 ST, 138 ST.

That road is going to be a total joke.

Of course we need less lights on the arterials.
     
     
  #4474  
Old Posted Jan 18, 2018, 6:35 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
Quote:
Originally Posted by logicbomb View Post
My bad. Should have clarified that the City should have opted to use roundabouts within the region on smaller roads like the 105A Ave connector. I saw a rendering that had lights at 144 ST, 142 ST, 140 ST and 139 ST, 138 ST.

That road is going to be a total joke.

Of course we need less lights on the arterials.
Don't forget 3 extra lights at 100th and 108th. 2 roads that are more than capable of handling the extra traffic once 104th gets fucked. Of course that's according to Hepner.
     
     
  #4475  
Old Posted Jan 18, 2018, 8:09 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
Quote:
Originally Posted by flipper316 View Post
Don't forget 3 extra lights at 100th and 108th. 2 roads that are more than capable of handling the extra traffic once 104th gets fucked. Of course that's according to Hepner.
At the end of the day there really shouldn't be an issue. We should be discouraging any local people from driving and instead push them to transit. Transit on 104 in particular will have quite a bit of extra capacity.
     
     
  #4476  
Old Posted Jan 18, 2018, 8:21 PM
KPELLY KPELLY is offline
Registered User
 
Join Date: Sep 2008
Location: North Vancouver
Posts: 159
Quote:
Originally Posted by Reecemartin View Post
At the end of the day there really shouldn't be an issue. We should be discouraging any local people from driving and instead push them to transit. Transit on 104 in particular will have quite a bit of extra capacity.
Exactly, and nobody will choose 20 km/h LRT over driving, 45km/h skytrain they might.
     
     
  #4477  
Old Posted Jan 18, 2018, 10:19 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Quote:
Originally Posted by KPELLY View Post
Exactly, and nobody will choose 20 km/h LRT over driving, 45km/h skytrain they might.
LRT is a predictable route. It's not as quick, but I suspect it will still be popular. 104th will be considerably slower after it's narrowed, giving the LRT an edge. The LRT will allow people to go down to 1 car. Let's be honest... it's REALLY hard to rely on transit in Surrey unless you're by a rail station. Lots of bus lines don't even run past dinner time.

Sure, the LRT may just be a fancy fixed B-Line, but it's a preserved rail corridor and a focus point for density. They can separate the ROW later and keep Fraser Hwy for a future SkyTrain line extension
     
     
  #4478  
Old Posted Jan 18, 2018, 10:33 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Quote:
Originally Posted by Reecemartin View Post
Well that implies that LRT is a waste, which is more of the Black and White thinking I am referring to. It's clearly not as good as Skytrain but, its definetly higher capacity than BRT in a lower cost in the long run (3+ car trains, cheaper maintenance). If we are always just waiting until tomorrow to do things bigger and better we are denying ourselves solutions that can certainly operate better than the status quo. And this is coming from someone who rides the 321 and 96 a lot.
Agreed... and it's not JUST about capacity and speed... but it's about predictability and reliability. When it's a fixed train, it's a LINE on a transit map. It's a KNOWN constant and the barrier to entry is lowered. How many times have any of us ridden a bus in NYC? NOT often, I'm guessing... and it's not because their buses are bad. Plenty of locals take the bus there... but a WHOLE lot more take the subway... I bet there are FASTER trips by bus, that even local just take the subway for... because it's consistent, it's a line on a map, it's predictable with reliable times.

Trains/LRTs are all about the guideways.

I almost never took the bus when I visited Seattle, now I take the LINK every time I'm there.

I almost NEVER took the bus from YVR, now I take the train. Trains have gravitas, weight, status. Buses... do not.
     
     
  #4479  
Old Posted Jan 18, 2018, 10:34 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,163
Quote:
Originally Posted by twoNeurons View Post
LRT is a predictable route. It's not as quick, but I suspect it will still be popular. 104th will be considerably slower after it's narrowed, giving the LRT an edge. The LRT will allow people to go down to 1 car. Let's be honest... it's REALLY hard to rely on transit in Surrey unless you're by a rail station. Lots of bus lines don't even run past dinner time.

Sure, the LRT may just be a fancy fixed B-Line, but it's a preserved rail corridor and a focus point for density. They can separate the ROW later and keep Fraser Hwy for a future SkyTrain line extension
But that assumes that nobody wants/needs to go anywhere beyond the LRT line; if I'm trying to get to West Newton, Fraser Heights, Cloverdale, White Rock or anywhere beside Guildford-Whalley-Newton, I'm still screwed without a vehicle.

The only way for surface LRT to directly compete with driving would be to build several lines, all at once, all over Surrey, not just one dogleg. Otherwise, the money seems better spent on a more frequent bus network, B-Lines, and through-road arterials to support them, with SkyTrain replacing highly-used lines as necessary.
     
     
  #4480  
Old Posted Jan 18, 2018, 10:42 PM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Quote:
Originally Posted by Reecemartin View Post
At the end of the day there really shouldn't be an issue. We should be discouraging any local people from driving and instead push them to transit. Transit on 104 in particular will have quite a bit of extra capacity.
104th ave will turn into a parking lot with 2 lanes spewing exhaust. So much for the LRT helping to reduce the carbon footprint. Going east/west in north Surrey will be a bitch.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:40 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.