Quote:
Originally Posted by Reecemartin
Look at the distances between several Skytrain station pairs, some are HUGE.
|
And some are tiny (Olympic->Broadway, Joyce->Patterson->Metrotown, etc). It averages out as roughly the same spacing as some of the higher-capacity LRTs.
Sorry, I assumed you meant the spacing along Newton-Guildford, which is indeed equal for BRT, LRT and RRT; again, in a race between all three, SkyTrain wins handily but LRT comes in second by one minute.
Quote:
Originally Posted by Reecemartin
ION as an example already seems to be set up to be quite successful and it has several on street streetcar style segments.
I think you are painting things too much in Black and White, if Surrey needs to wait for Skytrain to lay rails it might be 20 years before the second biggest city (probably the largest ) has any significant rail infrastructure (which indeed is capable of higher build out capacity full stop).
|
Waterloo also has less than half as much congestion as Metro Van.
But don’t take my word for it.
As for 20 years, that seems a tad exaggerated. Again, we get a new SkyTrain project about every 7 years (Millennium in 2002, Canada in 2009, Evengreen in 2016, etc); assuming the Broadway and Langley extensions open in 2023, then Newton-Guildford is first in line for the next round of projects to be finished by 2030, meaning a 12-16 year wait at the very latest. In that context, being stuck with at-grade, non-buried LRT for 30-40 years does indeed seem like a waste.
Quote:
Originally Posted by Reecemartin
As an aside it kind of comes off as condescending, when you talk the way some of these come off.... I'm just trying to keep things relaxed
|
Heh, then you better avoid Stingray, Vin, Vancouverofthefuture or Colin (who I believe called you a “poster boy of blind support for LRT” and accused you of “stereotypical Toronto arrogance”). I myself try to avoid such harsh language.
Genuine question: which parts are condescending? I’ve been posting like this on SSP for over three years now; I apologize again if I offended, and I can try to be more tactful, but also consider the idea that you might be taking this a bit too personally.
Quote:
Originally Posted by Reecemartin
On a totally different note, how are the options in terms of Hydro ROW's? Might be an interesting way to expand some higher capacity commuter rail.
|
Now
that would be a good route for LRT to spur development along. Head up the interurban route from Newton, switch to the Hydro route, connect to the Langley extension and either stop there or head north along 152nd to Guildford.