Quote:
Originally Posted by acottawa
I would still prefer they introduced some sort of pilot project with whatever part of the line is operational. The University alone is a large driver of ridership and it would drastically improve access to the train station.
|
Good Day....
yep ! Get it up and running between Blair and uOttawa.
The west side would require interruptions to work, and the Lyon and Parl stations would interfere with ongoing access for work.
So... leave the buses running, and get the east side up, and pilot a lot of the bugs out early !
OMG... too much sense ! cain't be dun !