Look inside Biodesign-C building:

https://asunow.asu.edu/20171214-sneak-peek-inside-asus-new-biodesign-c-building-under-construction

The building looks really good--I love the copper exterior. Would love it if someone did something like it on a larger scale in Phoenix like the American Copper buildings in New York (http://skyscraperpage.com/forum/showthread.php?t=204053).
Reply With Quote
     
     
  #7362  
Old Posted Dec 15, 2017, 6:49 PM
muertecaza muertecaza is offline
Registered User
 
Join Date: Oct 2015
Posts: 2,464
The proposal for Farmer Arts Parcel 1 passed the DRC. Doesn't appear to be anything like the coordinated opposition for this iteration. The only member of the public that spoke was the guy from the Riverside Neighborhood Association who typically opposes developments proposed in the area. The DRC did narrowly deny a proposal for a 16-unit development on vacant land at roughly Apache/Rural. The real coordinated opposition was against a Quick Quack Car Wash at McClintock/Baseline. They had matching buttons and everything.
Reply With Quote
     
     
  #7363  
Old Posted Dec 19, 2017, 11:46 PM
muertecaza muertecaza is offline
Registered User
 
Join Date: Oct 2015
Posts: 2,464
They were finally moving dirt at the Pier site when I rode by this afternoon. Hopefully that means we'll see some movement going forward.
Reply With Quote
     
     
  #7364  
Old Posted Dec 20, 2017, 12:28 AM
ASUSunDevil ASUSunDevil is offline
Registered User
 
Join Date: Jul 2012
Posts: 950
Quote:
Originally Posted by muertecaza View Post
They were finally moving dirt at the Pier site when I rode by this afternoon. Hopefully that means we'll see some movement going forward.
Nice! I was a bit freaked out that it was stalled.

I think this is going to be a really great looking project.
Reply With Quote
     
     
  #7365  
Old Posted Dec 20, 2017, 4:12 PM
ASU Diablo ASU Diablo is online now
Registered User
 
Join Date: Jan 2013
Posts: 2,501
Tempe’s Hayden Flour Mill project gets new backer

https://www.bizjournals.com/phoenix/news...-flour-mill-project-gets-new-backer.html
Quote:
The Tempe City Council approved a zoning change on Dec. 14 that would allow the development at the Hayden Flour Mill to go forward. Baum said the final plans will be presented to the Tempe City Council early next year, and a ground breaking will be held in March. He said construction should last about 15 months and should be completed by the summer of 2019.
Reply With Quote
     
     
  #7366  
Old Posted Dec 20, 2017, 4:25 PM
muertecaza muertecaza is offline
Registered User
 
Join Date: Oct 2015
Posts: 2,464
Awesome news. And having the Portillo's founder on board as a financial backer is kind of cool. And Aparium looks like they do really good work. http://aparium.com/
Reply With Quote
     
     
  #7367  
Old Posted Dec 21, 2017, 8:03 PM
muertecaza muertecaza is offline
Registered User
 
Join Date: Oct 2015
Posts: 2,464
The Local 12/21/2017

Reply With Quote
     
     
  #7368  
Old Posted Dec 27, 2017, 6:11 PM
muertecaza muertecaza is offline
Registered User
 
Join Date: Oct 2015
Posts: 2,464
Looks like Mirabella (senior tower at Mill/University) is about to start construction.

http://www.mailtribune.com/news/20171226/medford-based-prs-to-build-arizona-high-rise-project

Quote:
TEMPE, Arizona — Pacific Retirement Services is ready to build the retirement industry’s most ambitious post-Great Recession housing project.

The Medford-based senior community development and management firm Friday announced a $251 million bond closing for its $270 million, 20-story Mirabella at ASU on the campus of Arizona State University.

After 70 percent of the 300 units were presold in a four-month period, PRS is ready to begin construction in January, with August 2020 the anticipated occupation date...

“It takes about 24 months from the awarding of a project to get it off the ground, so we’ve done this about as fast as we can. We opened our sales center in mid-September, and we’ve sold over 50 units per month. The state requires 50 percent presale, and the bondholders require 70 percent because they want to see if there is demand. This is the fastest we’ve ever got to 70 percent.”

...Mirabella at ASU offers urban access and resort-style venues. Penthouse and apartment units range from 751 square feet to 2,665 square feet. The tower has four dining venues, three of which are located on the penthouse level, an indoor pool and wellness center, an event center, a library and underground parking. Under a proposed collaboration agreement with ASU, residents of the community will be able to attend and participate in ASU classes, activities and programs.

...Portland-based Ankrom Moissan Architects designed the 613,000-square-foot tower, which will be built by McCarthy Construction Co.

...The Industrial Development Authority of the city of Tempe issued the bonds.
Reply With Quote
     
     
  #7369  
Old Posted Dec 27, 2017, 8:59 PM
ASUSunDevil ASUSunDevil is offline
Registered User
 
Join Date: Jul 2012
Posts: 950
Quote:
Originally Posted by muertecaza View Post
Looks like Mirabella (senior tower at Mill/University) is about to start construction.

http://www.mailtribune.com/news/20171226/medford-based-prs-to-build-arizona-high-rise-project
W6 looked out of place 5 years ago. Once Mirabella, Westin and hopefully 5th & Ash are built, the area will be worthy of W6's height.

These 5th & Ash renderings look fantastic IMO:

http://www.gglo.com/places/crescent-5th-and-ash/

Last edited by ASUSunDevil; Dec 27, 2017 at 9:10 PM.
Reply With Quote
     
     
  #7370  
Old Posted Dec 27, 2017, 9:10 PM
Classical in Phoenix's Avatar
Classical in Phoenix Classical in Phoenix is offline
Registered User
 
Join Date: Mar 2008
Location: A place with bigger haboobs than yours
Posts: 625
Interesting that the state requires 50% presales before construction. I wonder if that is part of the reason high rise residential is mostly rental.
Reply With Quote
     
     
  #7371  
Old Posted Dec 27, 2017, 10:04 PM
muertecaza muertecaza is offline
Registered User
 
Join Date: Oct 2015
Posts: 2,464
Quote:
Originally Posted by Classical in Phoenix View Post
Interesting that the state requires 50% presales before construction. I wonder if that is part of the reason high rise residential is mostly rental.
I think that 50% requirement is only when municipal bonds are used to fund the project. So it's a somewhat unique aspect of this project, not necessarily applicable to condo projects generally.
Reply With Quote
     
     
  #7372  
Old Posted Dec 27, 2017, 10:38 PM
Classical in Phoenix's Avatar
Classical in Phoenix Classical in Phoenix is offline
Registered User
 
Join Date: Mar 2008
Location: A place with bigger haboobs than yours
Posts: 625
Thanks. I was wondering how that could work. I had never heard of anything like that.
Reply With Quote
     
     
  #7373  
Old Posted Dec 28, 2017, 2:47 AM
MegaBass MegaBass is offline
Registered User
 
Join Date: Mar 2011
Posts: 645
Mad Hatter Brew Pub at 502 S College Ave will rebrand as an ASU themed College Bar & Grill.
Reply With Quote
     
     
  #7374  
Old Posted Dec 28, 2017, 3:24 AM
exit2lef exit2lef is offline
reasonably smart guy
 
Join Date: Dec 2007
Location: Phoenix
Posts: 3,349
Quote:
Originally Posted by MegaBass View Post
Mad Hatter Brew Pub at 502 S College Ave will rebrand as an ASU themed College Bar & Grill.
From one unoriginal name to another. This space cries out for a good tenant.
Reply With Quote
     
     
  #7375  
Old Posted Dec 28, 2017, 3:44 AM
ASU Diablo ASU Diablo is online now
Registered User
 
Join Date: Jan 2013
Posts: 2,501
Quote:
Originally Posted by exit2lef View Post
From one unoriginal name to another. This space cries out for a good tenant.
Give it time. It’s now co-owned by Jim Healey, son of Tim Healey. Anyways, I expect great things from this bar. Big ASU guy
Reply With Quote
     
     
  #7376  
Old Posted Dec 28, 2017, 12:41 PM
exit2lef exit2lef is offline
reasonably smart guy
 
Join Date: Dec 2007
Location: Phoenix
Posts: 3,349
Quote:
Originally Posted by airomero83 View Post
Give it time. It’s now co-owned by Jim Healey, son of Tim Healey. Anyways, I expect great things from this bar. Big ASU guy
Thanks from the info. I’m not a sports person, so I had to look up Tim Healey. While I was doing that, I also looked at the bar’s social media accounts. They’re showing more promise than Mad Hatter, so I’ll hope for the best, even if the generic name makes me skeptical.
Reply With Quote
     
     
  #7377  
Old Posted Dec 28, 2017, 3:32 PM
PHXFlyer11 PHXFlyer11 is offline
Registered User
 
Join Date: Aug 2013
Posts: 1,441
Quote:
Originally Posted by ASUSunDevil View Post
W6 looked out of place 5 years ago. Once Mirabella, Westin and hopefully 5th & Ash are built, the area will be worthy of W6's height.

These 5th & Ash renderings look fantastic IMO:

http://www.gglo.com/places/crescent-5th-and-ash/
Any indication that this is actually moving along? I figured it was another pipe dream with USA Place and 100 Mill.

Any movement on The Pier? So weird hos it seems like they are waiting on a tower crane but don't have their ducks in a row. Must be another amateur developer who doesn't know what they're doing.
Reply With Quote
     
     
  #7378  
Old Posted Dec 28, 2017, 10:36 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Great State of NJ
Posts: 49,386
Reply With Quote
     
     
  #7379  
Old Posted Dec 29, 2017, 3:09 AM
Classical in Phoenix's Avatar
Classical in Phoenix Classical in Phoenix is offline
Registered User
 
Join Date: Mar 2008
Location: A place with bigger haboobs than yours
Posts: 625
After seeing that they were close to breaking ground, my girlfriend and I went to their sales office today. We found out that we are still too young to live there...yay. It is interesting how you take possession. You pay a deposit into an escrow account, starting at $300k + for a smaller unit. Then you pay a monthly amount starting at $5,300. This monthly amount includes some meals and other amenities and the price goes up the more you use. When you leave the facility you get 90% of the deposit back. The owner is a nonprofit. The tenant never takes ownership.
Reply With Quote
     
     
  #7380  
Old Posted Dec 31, 2017, 8:38 PM
PHXFlyer11 PHXFlyer11 is offline
Registered User
 
Join Date: Aug 2013
Posts: 1,441
Can't recall that this was posted before... tower crane is up for Aura. Tempe is crane city!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southwest
Forum Jump



Forum Jump


All times are GMT. The time now is 11:04 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.