HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


Closed Thread

 
Thread Tools Display Modes
     
     
  #10241  
Old Posted Dec 16, 2017, 3:43 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
That's to distinguish the three subway stations. It's supposed to be gold at Lyon, I think red at Parliament and blue at Rideau.
     
     
  #10242  
Old Posted Dec 17, 2017, 2:44 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,686
Quote:
Originally Posted by J.OT13 View Post
That's to distinguish the three subway stations. It's supposed to be gold at Lyon, I think red at Parliament and blue at Rideau.
Is that like NDP to the left, Liberals in the centre and Conservatives on the right?
     
     
  #10243  
Old Posted Dec 17, 2017, 12:41 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
The new subway extension opens today. Free rides across the entire TTC network.
     
     
  #10244  
Old Posted Dec 17, 2017, 3:40 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,865
The Spadina Subway extension in Toronto opened this morning at 8am EST. At 8.6km / 5.3 miles, it is the longest extension to Toronto's network since 1978 and the first extension since 2002.

The line has 6 new stations, and for the first time, extends the subway past the municipal boundary of Toronto into the City of Vaughan. The stations are quite grand, and have several mass transit connections. One connects to the Barrie GO commuter rail line, one will soon have a connection to the Finch West LRT, which is currently in early prep construction, and the terminus station has a connection to an in median BRT system in Vaughan.

This the second of 3 major transit openings in Toronto in the tail end of 2017. Earlier in November, the Mississauga Transitway grade separated BRT opened it's final station, Renforth, and on December 30th, the Barrie GO commuter rail line will officially launch all day hourly frequency train services, making it the 5th GO line to offer off peak all day GO services.
     
     
  #10245  
Old Posted Dec 17, 2017, 4:12 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Wow! I didn't even know about the Mississauga BRT. I will have to check that out.

Ive got plans for the end of the year, might not be able to see all the transit projects this year. Maybe spring.
     
     
  #10246  
Old Posted Dec 17, 2017, 4:45 PM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,976
I heard about the BRT for Mississauga and seen it, it doesn't look very interesting but if it works for some people, then it's fine. Faster service across a stretch of Mississauga that's fairly lacklustre.....might get better in twenty years.
__________________
"Living life on the edge"
     
     
  #10247  
Old Posted Dec 17, 2017, 6:18 PM
Doady's Avatar
Doady Doady is offline
Registered User
 
Join Date: Apr 2004
Posts: 5,166
I was skeptical of Mississauga Transitway as well but the express routes 107 and 109 became very popular, even before the transitway opened.

I think the full potential of Mississauga Transitway though is as part of regional BRT system. There will be the 407 Transitway as well, and GO's 407 routes are already its busiest. All day train service to Union should be the priority but they have to think about crosstown service as well.

Of course, if Toronto built Eglinton LRT to connect to the Mississauga Transitway and the airport, also entirely grade-separated, using the Richview corridor, it would have helped the transitway as well, and it would probably have made a lot more sense than building yet another east-west line to Kennedy station and into Scarborough But Toronto is run by idiots, don't expect much from them.
     
     
  #10248  
Old Posted Dec 17, 2017, 11:17 PM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,976
Quote:
Originally Posted by Doady View Post

Of course, if Toronto built Eglinton LRT to connect to the Mississauga Transitway and the airport, also entirely grade-separated, using the Richview corridor, it would have helped the transitway as well, and it would probably have made a lot more sense than building yet another east-west line to Kennedy station and into Scarborough But Toronto is run by idiots, don't expect much from them.
The Eglinton West LRT project would solve that issue, going right to Renforth, where Mississauga's BRT ends....but if that ever happens it would likely be done in 15 years after the Eglinton Crosstown, the Finch West LRT, and the DRL.

The airport link should hopefully be resolved by whatever airport transit hub the city of Mississauga/GTAA/Toronto is taking about with GTAA and the airport itself. For now we have the same airport rocket we've had for years, running from Keele Station.
__________________
"Living life on the edge"
     
     
  #10249  
Old Posted Dec 18, 2017, 6:00 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
Anything especially notable here? Thought all these had been announced and deadlines for PTIF were Dec 2018...not that it looks to be an issue with these.

https://www.canada.ca/en/office-infrastr...ebecsupportbetterpublictransitservi.html
     
     
  #10250  
Old Posted Dec 18, 2017, 1:55 PM
PhilippeMtl's Avatar
PhilippeMtl PhilippeMtl is offline
Registered User
 
Join Date: Sep 2005
Location: Rosemont-la-petite-patrie, Montreal
Posts: 2,170
Quote:
Originally Posted by ClaytonA View Post
Anything especially notable here? Thought all these had been announced and deadlines for PTIF were Dec 2018...not that it looks to be an issue with these.

https://www.canada.ca/en/office-infrastr...ebecsupportbetterpublictransitservi.html
1.5$M for 2 bike stations?
     
     
  #10251  
Old Posted Dec 18, 2017, 2:07 PM
begratto's Avatar
begratto begratto is offline
Explorateur urbain
 
Join Date: Jun 2005
Location: Verdun > Montréal > Québec > Canada
Posts: 1,072
Quote:
Originally Posted by PhilippeMtl View Post
1.5$M for 2 bike stations?
Expensive, but these aren't simple bike racks. They're big bike shelters, similar to the one in Sainte-Julie.
__________________
Venit ad oppidum!
     
     
  #10252  
Old Posted Dec 18, 2017, 7:36 PM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,959
I think the Miss Transitway is an excellent piece of infrastructure and will prove to be well patronized and adds a great deal of connectivity across the region including cross regional GO bus service. It is fast, reliable, safe, comfortable, and offers far superior flexibility than any LRT system would have offered.
     
     
  #10253  
Old Posted Dec 18, 2017, 10:44 PM
Kevin_foster's Avatar
Kevin_foster Kevin_foster is offline
Kevin Folds Five
 
Join Date: Jan 2005
Location: Edmonton, Canada
Posts: 6,072
Is this considered transit? Edmonton's Funicular is up and running.

Quote:
Originally Posted by Sonog View Post
I had a chance to check the funicular today. It was reasonably busy.









__________________
I used to be indecisive, but now I'm not sure...
     
     
  #10254  
Old Posted Dec 18, 2017, 11:26 PM
Doady's Avatar
Doady Doady is offline
Registered User
 
Join Date: Apr 2004
Posts: 5,166
Quote:
Originally Posted by ssiguy View Post
I think the Miss Transitway is an excellent piece of infrastructure and will prove to be well patronized and adds a great deal of connectivity across the region including cross regional GO bus service. It is fast, reliable, safe, comfortable, and offers far superior flexibility than any LRT system would have offered.
LRT was never considered, and upgrading BRT to LRT is possible (see Ottawa). Also, Mississauga is also planning LRT along Hurontario. I don't see why bring BRT vs. LRT into this.
     
     
  #10255  
Old Posted Dec 18, 2017, 11:47 PM
hipster duck's Avatar
hipster duck hipster duck is offline
Registered User
 
Join Date: Oct 2014
Location: Toronto
Posts: 4,912
That funicular looks pretty cool, and I like its unabashedly modern design. Usually incline railways/funiculars are old timey things.

I'm surprised that the TTC subway extension didn't get more play here. It's probably the most significant transit expansion to open in Canada since the Canada line.
     
     
  #10256  
Old Posted Dec 18, 2017, 11:56 PM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,976
Quote:
Originally Posted by hipster duck View Post
I'm surprised that the TTC subway extension didn't get more play here. It's probably the most significant transit expansion to open in Canada since the Canada line.

I'm pretty interested to see the map now of the TTC subways....I can't imagine going to Vaughan anytime soon....though I might just go up there sometime this spring, give a few updates for here. From what UT is showing, the YMCA/library/office tower across the street from the VMC subway station is going up pretty fast, already a third of it's height now (9 floors)
__________________
"Living life on the edge"
     
     
  #10257  
Old Posted Dec 19, 2017, 4:06 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
2 days and I will get a chance to ride the new subway. Not gonna bother with updates, enough have been posted, but will finally be able to see what all the fuss is about on these new stations.

More important, they need to approve and fund the DRL, which after the RER rail electrification project is the most important rail project for the future growth of the city. It boggles my mind we are gonna spend 4 billion dollars for subway to Scarborough that will ultimately just clog up Yonge-Bloor some more. (Suburbs rule us)
     
     
  #10258  
Old Posted Dec 19, 2017, 4:14 PM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by caltrane74 View Post
2 days and I will get a chance to ride the new subway. Not gonna bother with updates, enough have been posted, but will finally be able to see what all the fuss is about on these new stations.

More important, they need to approve and fund the DRL, which after the RER rail electrification project is the most important rail project for the future growth of the city. It boggles my mind we are gonna spend 4 billion dollars for subway to Scarborough that will ultimately just clog up Yonge-Bloor some more. (Suburbs rule us)
I don't get why Metrolinx just won't plainly state that it's a bad tnvestment.
     
     
  #10259  
Old Posted Dec 19, 2017, 4:19 PM
niwell's Avatar
niwell niwell is online now
sick transit, gloria
 
Join Date: Nov 2004
Location: Roncesvalles, Toronto
Posts: 11,630
I'll probably check out the line 1 extension over Christmas at some point since I'm just sticking around town. Plan to get off at VCC to see the windswept emptiness, and also York University since I've refused to ride the 196 express bus since graduating from my Master's in 2009. It's a fairly significant extension although the utility after Pioneer Station is questionable (including that one as the bus situation at York lanes was a shitshow).
     
     
  #10260  
Old Posted Dec 19, 2017, 4:21 PM
niwell's Avatar
niwell niwell is online now
sick transit, gloria
 
Join Date: Nov 2004
Location: Roncesvalles, Toronto
Posts: 11,630
Quote:
Originally Posted by d_jeffrey View Post
I don't get why Metrolinx just won't plainly state that it's a bad tnvestment.

It's a political landmine, and the province's official line that municipalities "are a mature and responsible order of government". It's the gift from Rob Ford (and to a lesser extent Transit City marketing under Miller) that just keeps on giving!
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 9:42 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.