Quote:
Originally Posted by freerover
That's true. I just don't know where else you get that space from. How many lots are left that can be high-rises? There is the last lot from the old water plant across from the library. Isn't there already a deal for the courthouse plot for a mixed use building? I wouldn't be disappointed if that was there plan but it sure better come with billions to help pay for a rail system and it looks like rail in this town needs to be elevated. People don't want to put rail down corridors with extra lanes and ROW like Airport and they don't want to lose car lanes down guad/lamar.
|
I'm not the first to bring this idea up here. There's a fair amount of underdeveloped lots/buildings around there that one could throw money at. More than people realize. Purchasing/assembling them is where the real challenge lies.
A quick, off the top of my head list: The northern half block west of the Seven apartments, SE corner of 6th and Nueces, those damn drive through banks to the west of 5th and Nueces intersection, Compass Bank drive through at SE corner of 6th and Guadalupe, SW corner of 5th and Lavaca has been empty forever, the county courthouse site, and more. All of those sites are pretty close together and waiting to be redeveloped. Most of them have no CVC encumbrances.
Quote:
Originally Posted by freerover
It would be nice for the Red Line to keep going but I'm not sure what kind of concerns there are since it's a diesel meant for hard rail and not electric. I'm not sure if electric trains are better for street use where you have a lot of mixed traffic. Also, the red line has such a wonky route anyway that comes from the west that I don't know how many people would be transferring. I think it has more value if they ever build the Green Line and if they use the same rail corridor to get to the airport instead of a light rail train down riverside.
|
I don't know anything about the limitations of the diesel trains. But ultimately, you have to limit transfers as much as possible in order for public transportation to be palatable to the masses. I would think that any diesel specific issues could be engineered around. They are already going to block all of 4th St when they build the new downtown station at the convention center. They might as well make 4th a pedestrian/bike/transit plaza all the way to Republic Square and tie it into those primary bus stops.
Quote:
Originally Posted by freerover
How do you think it could get up to 3 million sq feet?
|
As I was saying...just guessing. I have no real info to back it up with. With the post office site being an entire block not in a CVC, it would be possible to put a giant building there.