Quote:
Originally Posted by Feathered Friend
My Photos - June 1st, 2017
UDP Rejected Submission

|
My photos - Jan 10th, 2018
To kill some time before the False Creek South Workshop, I stopped in at the first UDP meeting of the year. The panel was understaffed and barely made quorum, with only 3/6 architect seats filled. There was difficulty in selecting a chair as well, with several nominees expressing the time commitment would interfere with their high work loads.
While this social housing project failed it's original UDP meeting, city staff allowed it to proceed to a public hearing with the understanding it could address the issues raised in the development application. That seemed to be the correct call, as the UDP felt this version of the project was greatly improved. I should note that, while it is social housing, the operator has acknowledged the building should be targeted towards the city's missing middle. The project has responded to the recommendation with a separate lobby opening on to the park, which also contains a residents only washroom, something I'm sure families will appreciate. It is designed to connect to the NEU, and has a greater window to wall ratio.
Though it was a small board, there was a diversity of comments. Comments that didn't make it too the consensus included a desire for more trees on the roof; that the land elevation was ignored and concerns regarding the barrier wall along the park.
The consensus called for the rooftop to be simplified, integrated, and made more coherent. There was a desire to strengthen the brick, particularly where it meets the planters. Another suggest was to revisit the narrow bands of dark brick in order to strengthen the framing. It was felt that the canopies were relentless, and should reflect the change in grade. While the changes to the southeast corner were greatly appreciated, it was felt that more could be done, and that it felt crowded. More importantly, this prominent corner should incorporate fritting on the glass balconies to better hide storage of items on the patios. Lastly, it was expressed that it was fine that the two separate entrances didn't connect, but that both should be strengthened and opened up. The result was a solid pass, with the above recommendations.