Old Posted Dec 14, 2016, 5:07 PM
LeadingEdgeBoomer LeadingEdgeBoomer is offline
Registered User
 
Join Date: Mar 2010
Posts: 1,394
Quote:
Originally Posted by FutureWickedCity View Post
Fantastic! I particularly like the brick-screen panels on the ground level and the way the path slopes down at an angle at the corner of the building. Now if they will just do something about that awful Colonel By building...
UOttawa plans to expand Colonel By. No idea if and how it would change its appearance.

Here is what they hope for as posted on the uOttawa web site:

Quote:
Expansion of Colonel By Hall: Expanding Instruction and Experimentation Spaces

With student experience being a central focus of the Faculty, and with an increasing number of engineering and computer science students choosing the University of Ottawa, the need for space is more acute than ever. This need is being addressed through plans for the addition of two floors to the existing Block E of Colonel By Hall.

The first new floor would be used to provide much needed workstations for our graduate students as well as common areas to encourage meetings and discussions, and a specific room for their thesis defences — additions that would all contribute to their student experience.

The second new floor would be dedicated to the Brunsfield Engineering Student Projects and Entrepreneurship Centre. Moving the Centre to the main Faculty of Engineering building would greatly benefit students, easing access to it. The floor dedicated to student projects would provide a much larger room enabling the accommodation of more students at once. The hiring of full-time staff to manage the Centre and mentor students would also then be possible.
Reply With Quote
     
     
  #42  
Old Posted Feb 27, 2017, 3:31 AM
Admiral Nelson Admiral Nelson is offline
Registered User
 
Join Date: Jun 2009
Posts: 519
STEM Complex - uOttawa | 7 fl | U/C

Discovery district will boost STEM space

The University of Ottawa will build Eastern Ontario’s largest “discovery district” to convert cutting-edge research into promising new technologies, significantly increasing the University’s space for research, innovation, experiential learning and entrepreneurship.

A state-of-the-art Science, Technology, Engineering and Mathematics (STEM) complex will house open-concept “super labs,” 3D-printing Makerspaces, our Entrepreneurship Hub and multidisciplinary spaces. The STEM complex will help instill innovation as a core uOttawa value by creating an environment and culture for open innovation and the collision of ideas, key ingredients in the quest for excellence, the advancement of knowledge and a resilient economy.

“Thanks to its interdisciplinary focus, the STEM complex will be a unique place for students from all faculties to meet and collaborate,” said uOttawa President Jacques Frémont. “It will provide fertile ground for the cross-pollination of ideas and for the nourishment of research breakthroughs. I would like to acknowledge all those who made this dream a reality and, in particular, my predecessor, Allan Rock, who played an important role in bringing this about.”

The $115 million STEM complex, which will become the core of our own discovery district on the main campus, has been made possible thanks to a $51.5 million federal government grant from the Post-Secondary Institutions Strategic Investment Fund and $6.4 million from the Province of Ontario.

Mona Nemer, vice-president, research, said the STEM complex will complement uOttawa’s existing Advanced Research Complex, dedicated to photonics and geoscience, and propel the University toward its goal of becoming one of Canada’s top five research-intensive universities.

“This fantastic, once-in-a-generation opportunity is something we’ve been hoping to do for years,” Nemer said. “The STEM complex will defy the conventional by taking a multi-sector approach to research, breaking down silos and delivering new synergies. It will inspire innovative startups and drive the transfer of new technologies, promoting the translation of uOttawa research into socio-economic benefits.”

Spaces at the STEM complex will include:

Discovery labs that expand on the latest digital infrastructure and state of the art equipment at uOttawa’s Richard L’Abbé Makerspace, encouraging students from all fields of study, including health sciences, arts and humanities, to join the “invent-build-play” movement
Our open-concept Entrepreneurship Hub, which will exude vibrancy, creativity and risk-taking and will be ideally suited for those who wish to “Defy the Conventional.” It will help multi-disciplinary startups launch new products by providing expertise on regulatory issues, patenting and advice on accessing venture capital

The STEM complex will consolidate several departments from the faculties of Science and Engineering under the same roof. It will also house the Brunsfield Centre, a dedicated space that allows students to build and test complex prototypes.

“This project is contributing to the creation of a campus that is inviting, memorable and sustainable, goals of the Campus Master Plan,” said Marc Joyal, vice-president, resources. “This state of the art building is a strategic investment that replaces MacDonald Hall, built in the mid-1960s and the CUBE, built in 1950 as a temporary structure. It will benefit the entire University community, enhance our academic mission, attract the brightest minds and enhance their experience on campus.”




This is uOttawa's exterior concept as shown on their major projects website:


Last edited by Admiral Nelson; Feb 27, 2017 at 3:44 AM.
Reply With Quote
     
     
  #43  
Old Posted Feb 27, 2017, 3:34 AM
Admiral Nelson Admiral Nelson is offline
Registered User
 
Join Date: Jun 2009
Posts: 519
OBJ article from last October.

University of Ottawa files plans for new six-storey academic complex

The University of Ottawa has filed development plans for its next large-scale construction project, a new science, technology, engineering and math building planned for the southwest corner of campus where demolition work has already started.

The new building proposed for 150-160 Louis Pasteur Priv., directly east of the Transitway and Nicholas Street, will feature a three-floor podium and two separate towers that each rise an additional three storeys, according to a planning report prepared by Fotenn Consultants and filed with the City of Ottawa.

Other development documents prepared by various consultants say the structure will have two or three basement levels and propose underground tunnel connections to Marion Hall and Colonel By Hall.

The reports say the site is currently developed with a parking lot, MacDonald Hall and the School of Information Technology and Engineering computer lab, more commonly known as the CUBE Building.

Some residents posted photos of the CUBE building being demolished last month. Planning documents say MacDonald Hall will also be demolished.

The University of Ottawa declined to answer questions about the demolition or the development application.

However, plans for a new science, technology, engineering and math, or STEM, building are contained in the university’s campus master plan, which said the school’s existing spaces are inadequate.

“A new facility is envisioned to revolutionize undergraduate education with teaching spaces that are radically different from existing facilities, and that respond to the newest trends in education,” the report said, adding that the development site could lead to a building of up to 25,000 square metres (269,100 square feet).

The new STEM building will include classrooms, laboratories, offices, workshops, teaching spaces, study rooms and a lecture theatre, according to the development plans.

A hydraulics lab reservoir and a structures lab workspace are proposed for the lowest basement level.

According to an environmental assessment by Geofirms Engineering Ltd., the site was part of the Ottawa University Athletic Oval prior to 1958 when construction of several university buildings began.

The CUBE building was built in 1954, while MacDonald Hall was constructed in 1965, the report said.

Like many universities around Ontario, the University of Ottawa has undergone a building boom over the last decade as it constructed new academic structures, athletic facilities and labs.

These include the social sciences tower overlooking the Transitway corridor, a sports stadium near the Rideau River and an $83 million learning centre that’s scheduled to be completed next year.

Other companies involved in the STEM building’s construction include:

- Perkins + Will

- Golder Associates (geotechnical report)

- Lashley + Associates (landscape architect)

- Novatech (site servicing report)

- Farley, Smith & Denis Surveying Ltd.
Reply With Quote
     
     
  #44  
Old Posted Feb 27, 2017, 3:36 AM
Admiral Nelson Admiral Nelson is offline
Registered User
 
Join Date: Jun 2009
Posts: 519
The site today:





Crane for this project on right, Learning Centre on left, Campus Station in foreground.

Reply With Quote
     
     
  #45  
Old Posted Feb 27, 2017, 5:04 PM
LeadingEdgeBoomer LeadingEdgeBoomer is offline
Registered User
 
Join Date: Mar 2010
Posts: 1,394
Thanks for the great photos Admiral.

Those three major projects---LRT, learning Center and Stem-- have sure made a mess of the central campus,

I am sure all will be relieved when next year comes and all three are to be completed.

However, the Master Campus Plans calls for a lot more changes to be done to the main campus in the coming years.

But, I hope they give the core of the campus a rest for a while and shift new projects toward the Lees campus in the next few years. Pity the poor Health Sciences staff and students. They are spread all over the place and have long been promised a new building at Lees to consolidate the various departments of Heath Sciences.

Such a building was once a priority but keeps getting bumped back by circumstances. A Federal grant was given for the STEM building with the stipulation that the money be spent right away, so Health Sciences was bumped again. I hope the next big project will be at Lees for Health Sciences.

Last edited by LeadingEdgeBoomer; Feb 27, 2017 at 5:56 PM.
Reply With Quote
     
     
  #46  
Old Posted Feb 27, 2017, 5:50 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,660
Good pics. Maybe they can be merged into the thread that we already have going for this project over here:

http://forum.skyscraperpage.com/showthread.php?t=224659
Reply With Quote
     
     
  #47  
Old Posted Feb 28, 2017, 1:17 AM
Admiral Nelson Admiral Nelson is offline
Registered User
 
Join Date: Jun 2009
Posts: 519
Quote:
Originally Posted by rocketphish View Post
Good pics. Maybe they can be merged into the thread that we already have going for this project over here:

http://forum.skyscraperpage.com/showthread.php?t=224659
Ah, apologies. I should have searched more thoroughly. Please do merge into that thread.
Reply With Quote
     
     
  #48  
Old Posted Mar 7, 2017, 11:52 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
reposting this shot from the Confederation Line thread
http://forum.skyscraperpage.com/showthread.php?p=7732869#post7732869

Quote:
Originally Posted by TMA-1 View Post
If that's not actually a train station down there then the joke's on me.





ufo station D822440
by Chuck Clark, on Flickr
Reply With Quote
     
     
  #49  
Old Posted Mar 10, 2017, 4:35 PM
trhgr's Avatar
trhgr trhgr is offline
Registered User
 
Join Date: May 2012
Location: Downtown Ottawa
Posts: 145
Video update from the construction site: https://youtu.be/IxzyvcvVW40
Reply With Quote
     
     
  #50  
Old Posted May 22, 2017, 5:32 AM
Admiral Nelson Admiral Nelson is offline
Registered User
 
Join Date: Jun 2009
Posts: 519
Site this weekend.

Reply With Quote
     
     
  #51  
Old Posted Sep 4, 2017, 6:53 PM
Admiral Nelson Admiral Nelson is offline
Registered User
 
Join Date: Jun 2009
Posts: 519


Progress as of today.
Reply With Quote
     
     
  #52  
Old Posted Sep 4, 2017, 8:35 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,639
Looks great! I still can't get over how much that end of campus has changed since I was studying and researching there. Demolition of Vachon, CUBE, MacDonald. Addition of CAREG, biosciences building, STEM, and the nearby social sciences building. Also the complete gut and remodel of Gendron. Gonna be a busy place once the LRT starts running.
Reply With Quote
     
     
  #53  
Old Posted Sep 4, 2017, 10:14 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,660
Another great photo by Chuck Clark:



Sept 2, 2017
by southfacing (Chuck Clark) on Flickr
Reply With Quote
     
     
  #54  
Old Posted Sep 7, 2017, 12:43 AM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,363
Jeebus...the U of O certainly has a lot of infill that has gone up in the last 4-5 years!
Reply With Quote
     
     
  #55  
Old Posted Sep 7, 2017, 12:28 PM
LeadingEdgeBoomer LeadingEdgeBoomer is offline
Registered User
 
Join Date: Mar 2010
Posts: 1,394
Quote:
Originally Posted by Davis137 View Post
Jeebus...the U of O certainly has a lot of infill that has gone up in the last 4-5 years!
The campus will change a lot over the next couple of decades. Two buildings, Macdonald and the Cube were demolished to make way for STEM.

Several more are likely to be demolished to make way for redevelopment of the campus. Might want to take a look at uOttawa's Campus Master Plan to see what they have in mind.

https://www.uottawa.ca/facilities/master-plan
Reply With Quote
     
     
  #56  
Old Posted Sep 7, 2017, 1:19 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Quote:
Originally Posted by LeadingEdgeBoomer View Post
The campus will change a lot over the next couple of decades. Two buildings, Macdonald and the Cube were demolished to make way for STEM.

Several more are likely to be demolished to make way for redevelopment of the campus. Might want to take a look at uOttawa's Campus Master Plan to see what they have in mind.

https://www.uottawa.ca/facilities/master-plan
I'm looking forward to them fixing up King Edward. I like what they've envisioned. Looks like a main street.

Reply With Quote
     
     
  #57  
Old Posted Sep 22, 2017, 5:26 AM
mykl mykl is offline
Registered User
 
Join Date: Jan 2015
Location: Ottawa
Posts: 475
Went for a walk tonight and took these pictures of STEM going up. What a quick build!




Reply With Quote
     
     
  #58  
Old Posted Dec 5, 2017, 1:00 AM
Admiral Nelson Admiral Nelson is offline
Registered User
 
Join Date: Jun 2009
Posts: 519
2017/12/03

Reply With Quote
     
     
  #59  
Old Posted Dec 8, 2017, 12:01 AM
mykl mykl is offline
Registered User
 
Join Date: Jan 2015
Location: Ottawa
Posts: 475
I've gotta say, I'm really excited that a building in Ottawa is doing something unique with its windows.
Reply With Quote
     
     
  #60  
Old Posted Dec 8, 2017, 2:18 PM
LeadingEdgeBoomer LeadingEdgeBoomer is offline
Registered User
 
Join Date: Mar 2010
Posts: 1,394
Quote:
Originally Posted by mykl View Post
I've gotta say, I'm really excited that a building in Ottawa is doing something unique with its windows.
Including the eyes, that will have LED backlighting. creating a display overlooking the canal at night,
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa