325 Fremont

On the lot, there is a tombstone with a April 19, 2016 groundbreaking date engraved into it.

Anyone know when actual construction will start?

     
     
  #8802  
Old Posted Oct 29, 2017, 5:24 AM
pseudolus pseudolus is offline
Registered User
 
Join Date: Jul 2006
Location: Mission Terrace, SF
Posts: 708
Quote:
Originally Posted by edwards View Post
325 Fremont

On the lot, there is a tombstone with a April 19, 2016 groundbreaking date engraved into it.

Anyone know when actual construction will start?
As I said before, the building permit process is two steps. First is the so-called "site permit", which is pretty general, then there are the "addenda", which get into the detail. The site permit was filed 5/4/16 and approved 3/14/17. As of now, all the addenda are on hold.
     
     
  #8803  
Old Posted Nov 5, 2017, 7:47 PM
181Fremont 181Fremont is offline
Registered User
 
Join Date: Oct 2016
Location: San Francisco
Posts: 19
Construction cam for the Jewish Home of San Francisco at Silver and Mission, the tower crane is expected to go up this month
-
https://app.oxblue.com/open/cannon/jewishhomesanfrancisco
     
     
  #8804  
Old Posted Nov 13, 2017, 10:46 PM
Jerry of San Fran's Avatar
Jerry of San Fran Jerry of San Fran is offline
Registered User
 
Join Date: Jun 2007
Location: San Francisco
Posts: 1,567
150 Van Ness at Hayes St. - Crane Dismantled

This weekend the crane (the last of two) was removed. The block between Polk & Van Ness Avenue on Hayes Street was closed for two days to accommodate the portable crane. This view is from the 24th floor of the (Essex) Fox Plaza

Crane Being Dismantled by Apollo's Light, on Flickr
__________________
(Essex) Fox Plaza resident 54th year in 2025 - (the building everyone loves to hate :------>))
     
     
  #8805  
Old Posted Nov 14, 2017, 7:26 PM
pseudolus pseudolus is offline
Registered User
 
Join Date: Jul 2006
Location: Mission Terrace, SF
Posts: 708
On the Block 5 cam, I see a tower crane off in the distance (somewhere around SFMOMA) that appears not to have been there a few days ago. Anyone can confirm or not? Moscone expansion?
     
     
  #8806  
Old Posted Nov 15, 2017, 12:13 AM
fimiak's Avatar
fimiak fimiak is offline
Build Baby Build
 
Join Date: Sep 2010
Location: San Francisco
Posts: 969
Looks like Moscone Expansion to me.
__________________
San Francisco Projects List ∞ The city that knows how ∞ 2017 ∞ 884,363 ∞ ~2030 ∞ 1,000,000
San Francisco Projects ThreadOakland Projects ThreadOceanwide Center - 275M/901'
     
     
  #8807  
Old Posted Nov 15, 2017, 3:30 PM
gholgado's Avatar
gholgado gholgado is offline
Registered User
 
Join Date: Apr 2014
Location: San Francisco, CA
Posts: 44
Quote:
Originally Posted by pseudolus View Post
On the Block 5 cam, I see a tower crane off in the distance (somewhere around SFMOMA) that appears not to have been there a few days ago. Anyone can confirm or not? Moscone expansion?
http://webcampub.multivista.com/index.cf...UID=AB482E7E-E85B-40C6-A683-E07A446AF54D
     
     
  #8808  
Old Posted Nov 15, 2017, 5:25 PM
pseudolus pseudolus is offline
Registered User
 
Join Date: Jul 2006
Location: Mission Terrace, SF
Posts: 708
     
     
  #8809  
Old Posted Nov 16, 2017, 6:30 AM
Pedestrian's Avatar
Pedestrian Pedestrian is offline
Elite Member
 
Join Date: Dec 2016
Location: San Francisco
Posts: 24,128
Quote:
Exclusive: Will San Francisco's Armory trade bondage for posh Soho House social club?
By Katie Burke – Food/Hospitality/Retail Reporter, San Francisco Business Times
Nov 13, 2017, 12:11pm PST Updated a day ago

Sources familiar with the deal have confirmed that Soho House will take over the 200,000-square-foot building at 1800 Mission St. . . . .

The Moorish castle-inspired building is zoned for urban mixed-use, which is a perfect fit for Soho House's typical potpourri of restaurants, workspaces, spas and bedrooms. If approved, San Francisco would be Soho's eighth North American outpost.
https://www.bizjournals.com/sanfrancisco...co-armory-prerogatives-kink.html?ana=twt
     
     
  #8810  
Old Posted Nov 17, 2017, 4:07 AM
pseudolus pseudolus is offline
Registered User
 
Join Date: Jul 2006
Location: Mission Terrace, SF
Posts: 708
Betteridge's law.
     
     
  #8811  
Old Posted Nov 21, 2017, 12:08 AM
botoxic botoxic is offline
Registered User
 
Join Date: Dec 2006
Location: The Mission
Posts: 690
SF's got a new look this holiday season!

Across The Bay by mikeSF_, on Flickr
     
     
  #8812  
Old Posted Nov 21, 2017, 2:14 AM
colemonkee's Avatar
colemonkee colemonkee is offline
Ridin' into the sunset
 
Join Date: Nov 2004
Location: Los Angeles
Posts: 9,287
^ Amazing!
__________________
"Then each time Fleetwood would be not so much overcome by remorse as bedazzled at having been shown the secret backlands of wealth, and how sooner or later it depended on some act of murder, seldom limited to once."

Against the Day, Thomas Pynchon
     
     
  #8813  
Old Posted Nov 22, 2017, 12:18 AM
gillynova's Avatar
gillynova gillynova is offline
Registered User
 
Join Date: Mar 2017
Location: Austin / Bay Area
Posts: 2,805
Big difference in skyline for SF 2016 vs. 2017. Can't wait for Oceanwide Center to be done too!
     
     
  #8814  
Old Posted Nov 24, 2017, 6:20 PM
pseudolus pseudolus is offline
Registered User
 
Join Date: Jul 2006
Location: Mission Terrace, SF
Posts: 708
Here's a tidbit that got overlooked.

75 Howard, which had its site permit approved on Sept 28, 2016, finally coughed up the money to have that permit issued on Oct 25 of this year.

Of course, they still need to file for a bunch of other permits before construction can start.

http://dbiweb.sfgov.org/dbipts/default.aspx?page=Permit&PermitNumber=201604013681&Stepin=1
     
     
  #8815  
Old Posted Nov 26, 2017, 6:32 PM
fimiak's Avatar
fimiak fimiak is offline
Build Baby Build
 
Join Date: Sep 2010
Location: San Francisco
Posts: 969
The Powell & California condo project has begun. 44 units at 875 California. The parking lot is currently being torn up. This is a California St. postcard altering project.

http://hoodline.com/2016/04/planning-com...tory&utm_medium=web&utm_campaign=stories



__________________
San Francisco Projects List ∞ The city that knows how ∞ 2017 ∞ 884,363 ∞ ~2030 ∞ 1,000,000
San Francisco Projects ThreadOakland Projects ThreadOceanwide Center - 275M/901'
     
     
  #8816  
Old Posted Nov 27, 2017, 5:14 AM
1977's Avatar
1977 1977 is offline
Registered User
 
Join Date: Nov 2009
Location: Bay Area
Posts: 996
Good news, fimiak. Thanks for the info!

Also, this...


The Calm Before the Storm
by Louis Raphael, on Flickr
     
     
  #8817  
Old Posted Nov 27, 2017, 5:22 AM
CastleScott CastleScott is offline
Registered User
 
Join Date: Jan 2010
Location: Sacramento Ca/formerly CastleRock Co
Posts: 1,055
^ Great pics guys-thanks!!

Oh btw anyone been by Oceanwide lately? I bet the hole is getting hella deep by now.
     
     
  #8818  
Old Posted Nov 27, 2017, 5:36 AM
1977's Avatar
1977 1977 is offline
Registered User
 
Join Date: Nov 2009
Location: Bay Area
Posts: 996
Quote:
Originally Posted by CastleScott View Post
^ Great pics guys-thanks!!

Oh btw anyone been by Oceanwide lately? I bet the hole is getting hella deep by now.
It's not, but they're still working around the clock:
Quote:
The temporary overhead pedestrian safety protection will remain in place on the south side of Stevenson for the next week.

Oceanwide’s contractors will continue installation of the perimeter shoring wall on the First Street site immediately east of 1 Ecker. This work requires large steel beams to be delivered to the site for the next several weeks. The San Francisco Municipal Transit Agency (SFMTA) requires that all oversized deliveries occur between midnight and 5:00 am so the beams will be delivered during these hours. Every effort will be made to minimize the impacts to all neighbors during this time.

During the installation of the shoring wall, drilled pile work will continue to be performed 24 hours a day as we complete the installation of the deep foundations on the Mission Street site and transition over to the First Street site in the coming month.
http://www.swinertonwebcor.com/updates/

Webcam
     
     
  #8819  
Old Posted Nov 27, 2017, 6:57 AM
Pedestrian's Avatar
Pedestrian Pedestrian is offline
Elite Member
 
Join Date: Dec 2016
Location: San Francisco
Posts: 24,128
Quote:
Originally Posted by CastleScott View Post
Oh btw anyone been by Oceanwide lately? I bet the hole is getting hella deep by now.
You can keep tabs on the site yourself via the construction cam: https://app.oxblue.com/open/malcolmdrilling/oceanwide

They are not yet actually digging the foundation. They are pouring the caisons (pilings) which process will likely take at least a year. This requires drilling out a hole to bedrock, putting in place a rebar cage and filing the hole with concrete--and they are probably doing several hundreds of these.

I'm guessing they start digging the hole in the Spring.
     
     
  #8820  
Old Posted Nov 28, 2017, 2:15 AM
CastleScott CastleScott is offline
Registered User
 
Join Date: Jan 2010
Location: Sacramento Ca/formerly CastleRock Co
Posts: 1,055
^ Thanks for the info and link bro!!
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 7:29 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.