Quote:
Originally Posted by lrt's friend
The reason for rail is that it is already a rail corridor going through sensitive wet land. If we build it as a Transitway, the corridor has to be wider and there will be more negative impacts because of run off of salt and other materials.
|
As the map below shows, the wetlands only touch a very short stretch (at most 350m, more likely less than 100m) of the rail corridor just south of Del Zotto Av. It would be easy enough to mitigate issues with that.
Quote:
|
I also question the cost differential when rail is running through greenfield areas.
|
If they were to use at grade rail crossings, you are probably right, but the paranoia of having at grade rail crossings in this city means that the LRT will have to be grade separated, even for roads that have low traffic volumes. The city would be much more comfortable having buses cross at grade.
Quote:
|
Ultimately, if we build a Bank Street subway, we will want the route to be rail from day one. No more of this massive disruption with conversion.
|
And when is that going to happen? No one is even talking about it so it will be 30 years at least. If/when they do they will likely have to shut down the line to double track it anyway.
Quote:
|
Then there is the consideration of operating costs. Trains can move more passengers at lower cost.
|
To save money, you need to run significantly fewer trains than you would buses. From day 1, we will have as many (if not more) trains running a day as buses currently run, so operational costs will go up.
Quote:
|
As ridership grows, rail becomes cheaper and cheaper to operate. Findlay Creek and Riverside South are only going to grow so there will be demand for more and more buses.
|
They will grow, but even if the current growth rate of 3% is maintained (which I doubt), it will take 24 years for the population to double.
Quote:
|
And don't kid yourself, once a train station opens south of the airport with a direct road from Barrhaven, many from Barrhaven will be driving to that train station instead of busing it to Baseline.
|
Maybe, but far more would use a train from Fallowfiled or Marketplace stations, so that should be a higher priority. Extending the Trillium line south will only delay this extension as ridership on the Trillium line would take a hit once the extension opens.
Quote:
Originally Posted by lrt's friend
I will add that we still need to accommodate rail to past Lester Road anyways to meet current freight requirements.
|
Freight requirements? I assume you mean occasionally sending rail vehicles to the NRC Automotive and Surface Transportation facility for testing? AFAIK, they are the only ones who use that line.