HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #5761  
Old Posted Nov 2, 2017, 12:49 PM
jsvh jsvh is offline
Registered User
 
Join Date: Dec 2014
Posts: 246
Just like parking garages, I don't have a problem with storage facilities as long as they comply with good urban design / zoning laws such as active uses at the street level in active Beltline areas. Of course like "parking minimums" I don't think we should have "storage minimums" built into our zoning laws either.

Honestly, we probably need to legalize storage facilities in more areas as the old industrial areas along the Beltline are one of the few areas it is legal causing more to be concentrated there.
Reply With Quote
     
     
  #5762  
Old Posted Nov 2, 2017, 2:03 PM
bmwfan9898 bmwfan9898 is offline
Registered User
 
Join Date: Jun 2017
Posts: 4
Quick update, I live in the Georgia state Commons next to the Shell station Downtown and noticed they have been closed the past couple of days. I’m guessing they are getting ready to start the 120 piedmont student housing project there!
Reply With Quote
     
     
  #5763  
Old Posted Nov 2, 2017, 3:18 PM
GeorgiaPeanuts GeorgiaPeanuts is offline
Registered User
 
Join Date: Sep 2014
Posts: 1,637
Is there any way to contact the owners of the building on 10th and Juniper with the boring concrete walls going the full length of the building to be painted with murals?
Reply With Quote
     
     
  #5764  
Old Posted Nov 2, 2017, 4:41 PM
jwbab jwbab is offline
Registered User
 
Join Date: Feb 2016
Location: Atlanta, Georgia
Posts: 420
Write-up from Midtown Alliance about the changes in the zoning code we discussed here recently.

Quote:
Full streetscaping (sidewalks, lighting, trees and other enhancements) is required within 18 months of demolition.

Developers can receive bonus incentives for affordable housing, public art, public park space and adaptive building re-use.

The use and amount of parking is minimized by bonus incentives for buried parking, greatly reduced parking and public parking; along with further regulation on the maximum number of parking spaces and location and size of any surface parking.

The visibility of parking structures is minimized in that they must be designed to be wrapped with active uses at street-level (such as having retail or residential units) and blended into buildings with architecturally compatible materials above street level.

Maximum setbacks (build-to) lines are specified to have minimize dead spaces along the sidewalk.

Local utility lines along prioritized streets are required to be buried or relocated away from view.

Storefront windows must offer minimum visibility depths to let people see inside, versus being covered and obscured from view.

Prioritized streets to have specific active pedestrian friendly uses while limiting the sizes of residential lobbies and clubhouses.

Rooftop equipment is to have screening requirements
https://www.midtownatl.com/about/news-ce...-midtowns-future-street-level-experience
Reply With Quote
     
     
  #5765  
Old Posted Nov 2, 2017, 6:51 PM
Atlanta3000 Atlanta3000 is offline
BANNED
 
Join Date: Nov 2013
Location: Buckhead
Posts: 2,763
Reply With Quote
     
     
  #5766  
Old Posted Nov 2, 2017, 6:55 PM
Ant131531 Ant131531 is offline
Registered User
 
Join Date: Jan 2013
Location: Atlanta
Posts: 1,984
We heard that two years ago...when are we going to actually get something concrete...?
Reply With Quote
     
     
  #5767  
Old Posted Nov 3, 2017, 2:28 PM
Martinman Martinman is offline
Registered User
 
Join Date: Jul 2015
Posts: 1,641
Quote:
Originally Posted by jwbab View Post
Write-up from Midtown Alliance about the changes in the zoning code we discussed here recently.



https://www.midtownatl.com/about/news-ce...-midtowns-future-street-level-experience
Awesome!
Reply With Quote
     
     
  #5768  
Old Posted Nov 3, 2017, 5:42 PM
Triptychtwo Triptychtwo is offline
Registered User
 
Join Date: Nov 2013
Posts: 261
No real news in this article, but it mentions the impact fees assessment that was filed earlier this week.

Quote:
Details of the Gulch development in the permit hew quite closely to Amazon's wish list when it comes to HQ2. The online retail giant, in its request for proposals, said it was seeking locations with on-site mass transit access, very close to major population centers and within 45 minutes from a major international airport, all of which could be had at the Gulch. The 9M SF office proposal is more than enough for the 8M SF of office Amazon said it would need over 20 years.

Read more at: https://www.bisnow.com/atlanta/news/econ...?utm_source=CopyShare&utm_medium=Browser
Reply With Quote
     
     
  #5769  
Old Posted Nov 3, 2017, 7:23 PM
jwbab jwbab is offline
Registered User
 
Join Date: Feb 2016
Location: Atlanta, Georgia
Posts: 420
Quote:
Originally Posted by Triptychtwo View Post
No real news in this article, but it mentions the impact fees assessment that was filed earlier this week.
Atlanta Business Chronicle also just posted a story:

https://www.bizjournals.com/atlanta/news...-at-gulch-plans-for-amazons.html?ana=twt
Reply With Quote
     
     
  #5770  
Old Posted Nov 7, 2017, 12:23 AM
jwbab jwbab is offline
Registered User
 
Join Date: Feb 2016
Location: Atlanta, Georgia
Posts: 420
Courtesy of Tomorrow's News Today Atlanta:

Carvana Eyeing Midtown Atlanta for Vending Machine

Quote:
Plans were filed with the City of Atlanta earlier this summer to demolish two existing structures near 16th and Fowler Streets. ToNeTo Atlanta has now confirmed that a self- storage facility and Carvana will open in their place. The property is located near Atlantic Station and within view of I-75/I-85.


Link:http://www.tonetoatl.com/2017/11/Carvana-Bringing-Car-Vending-Machine-to-Midtown-Atlanta.html
Reply With Quote
     
     
  #5771  
Old Posted Nov 7, 2017, 12:40 AM
Pemgin Pemgin is offline
Registered User
 
Join Date: May 2014
Posts: 809
Goddamnit another fucking storage facility? And how does a car vending machine even work?
Reply With Quote
     
     
  #5772  
Old Posted Nov 7, 2017, 1:11 AM
briantech's Avatar
briantech briantech is offline
Registered User
 
Join Date: Oct 2006
Posts: 608
Quote:
Originally Posted by Pemgin View Post
Goddamnit another fucking storage facility? And how does a car vending machine even work?
https://www.youtube.com/watch?v=iquAxqwuRMo
Reply With Quote
     
     
  #5773  
Old Posted Nov 7, 2017, 1:17 PM
jwbab jwbab is offline
Registered User
 
Join Date: Feb 2016
Location: Atlanta, Georgia
Posts: 420
Crane Watch: Dirt to start moving on 53-story Midtown condo tower
https://www.bizjournals.com/atlanta/news...ch-dirt-to-start-moving-on-53-story.html

Quote:
Atlanta civil engineering company Reeves Young has been hired for excavation of the four-acre site. It could begin in about two weeks, said Karen Rodriguez, with Berkshire Hathaway HomeServices Georgia Properties. The work could take at least four months because of the large amount of stone underneath the site.
Reply With Quote
     
     
  #5774  
Old Posted Nov 7, 2017, 1:20 PM
Atlanta3000 Atlanta3000 is offline
BANNED
 
Join Date: Nov 2013
Location: Buckhead
Posts: 2,763
Code Brown...I Repeat, Code Brown

Crane Watch: Dirt to start moving on 53-story Midtown condo tower
https://www.bizjournals.com/atlanta/news...dirt-to-start-moving-on-53-story.html#g1

Video Link
Reply With Quote
     
     
  #5775  
Old Posted Nov 7, 2017, 1:36 PM
Street Advocate Street Advocate is offline
Registered User
 
Join Date: Oct 2015
Posts: 3,717
Bring it on! Nice to hear of more progress coming to Midtown. As nice as it is with the infill going in at the moment, there's plenty of room for more projects to break ground.

I wonder how long we will have to wait to see the other towers proposed at Opus.
Reply With Quote
     
     
  #5776  
Old Posted Nov 7, 2017, 4:45 PM
jwbab jwbab is offline
Registered User
 
Join Date: Feb 2016
Location: Atlanta, Georgia
Posts: 420
SAP filed today for 887 West Marietta St.

https://aca3.accela.com/ATLANTA_GA/Cap/C...gencyCode=ATLANTA_GA&IsToShowInspection=

Quote:
Beltline special administrative permit for an 18-story 224 unit residential building with 8,100 sq ft amenity deck and pool
That's pretty tall for that area.
Reply With Quote
     
     
  #5777  
Old Posted Nov 7, 2017, 4:51 PM
Atlanta3000 Atlanta3000 is offline
BANNED
 
Join Date: Nov 2013
Location: Buckhead
Posts: 2,763
Reply With Quote
     
     
  #5778  
Old Posted Nov 7, 2017, 5:23 PM
Pemgin Pemgin is offline
Registered User
 
Join Date: May 2014
Posts: 809
Quote:
Originally Posted by Street Advocate View Post
Bring it on! Nice to hear of more progress coming to Midtown. As nice as it is with the infill going in at the moment, there's plenty of room for more projects to break ground.

I wonder how long we will have to wait to see the other towers proposed at Opus.
I have a feeling that's going to entirely depend on how well No. 2 sells.

They're going to need to file their construction permit soon.
Reply With Quote
     
     
  #5779  
Old Posted Nov 7, 2017, 5:24 PM
ATLmangum's Avatar
ATLmangum ATLmangum is offline
Registered User
 
Join Date: Nov 2005
Posts: 804
Can someone post more info regarding the Opus groundbreaking?
Reply With Quote
     
     
  #5780  
Old Posted Nov 7, 2017, 5:29 PM
tdawg's Avatar
tdawg tdawg is offline
Registered User
 
Join Date: Jan 2007
Location: Astoria, NY
Posts: 2,985
That Opus Place video is great!
__________________
From my head via my fingers.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 5:45 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.