  #6961  
Old Posted Oct 31, 2017, 4:00 PM
Trich Trich is offline
Registered User
 
Join Date: Jun 2016
Posts: 76
Quote:
Originally Posted by Knight Hospitaller View Post
If you'd been here earlier, East Market would've provided you with hours of "entertainment."
I was here. That problem was so abundant you almost knew it would be fixed. This particular deviation is worrisome because everything else has been finely placed into its home.
Reply With Quote
     
     
  #6962  
Old Posted Oct 31, 2017, 4:06 PM
Knight Hospitaller's Avatar
Knight Hospitaller Knight Hospitaller is offline
Registered User
 
Join Date: Jul 2015
Location: Greater Philadelphia
Posts: 2,949
Quote:
Originally Posted by Trich View Post
I was here. That problem was so abundant you almost knew it would be fixed. This particular deviation is worrisome because everything else has been finely placed into its home.
There's still a boarded up window area low on the east side. It's been driving me nuts. All will be well in good time.
Reply With Quote
     
     
  #6963  
Old Posted Oct 31, 2017, 4:07 PM
iheartphilly's Avatar
iheartphilly iheartphilly is offline
Philly Rising Up!
 
Join Date: Nov 2012
Location: motherEarth
Posts: 3,263
To be expected. Not a finished project and still a construction in-progress zone.
Reply With Quote
     
     
  #6964  
Old Posted Nov 1, 2017, 2:00 AM
PhillyPhlyr PhillyPhlyr is offline
Registered User
 
Join Date: Jun 2015
Posts: 60
Smile

Quote:
Originally Posted by iheartphilly View Post
Here's some more of what I took over the weekend:

Untitled by iheartphilly iheartphilly, on Flickr
I still find it hard to believe they put the loading docks on Cuthbert street. I’m having a hard time seeing 18 wheelers getting in and out of that street.
Reply With Quote
     
     
  #6965  
Old Posted Nov 1, 2017, 11:50 AM
gw04 gw04 is offline
Registered User
 
Join Date: Jun 2015
Posts: 172
Quote:
Originally Posted by PhillyPhlyr View Post
I still find it hard to believe they put the loading docks on Cuthbert street. I’m having a hard time seeing 18 wheelers getting in and out of that street.


It looks like trucks could back in. Most trucks are probably shorter for delivery of food and other goods.
Reply With Quote
     
     
  #6966  
Old Posted Nov 1, 2017, 4:59 PM
The Best Forumer's Avatar
The Best Forumer The Best Forumer is offline
Registered User
 
Join Date: Aug 2013
Posts: 2,784
Quote:
Originally Posted by gw04 View Post


It looks like trucks could back in. Most trucks are probably shorter for delivery of food and other goods.
It's going to be a tight squeeze...
__________________
The suburbs are second-rate. Cookie-cutter houses, treeless yards, mediocre schools, and more crime than you think. Do your family a favor and move closer to the city.
Reply With Quote
     
     
  #6967  
Old Posted Nov 1, 2017, 5:13 PM
Elevator1 Elevator1 is offline
Registered User
 
Join Date: Jan 2015
Location: South Jersey
Posts: 135
Looks like a crane jump happened this morning. Time for the lantern structure!!
Reply With Quote
     
     
  #6968  
Old Posted Nov 1, 2017, 9:03 PM
GtownFriend GtownFriend is offline
Registered User
 
Join Date: Dec 2016
Location: Boulder CO
Posts: 600
Quote:
Originally Posted by Elevator1 View Post
Looks like a crane jump happened this morning. Time for the lantern structure!!
So is this the first 1000ft+ high crane cab in Philly? what an office!
Reply With Quote
     
     
  #6969  
Old Posted Nov 2, 2017, 12:04 AM
gw04 gw04 is offline
Registered User
 
Join Date: Jun 2015
Posts: 172
It looks like they're doing work tonight. I've seen the crane move a couple times on the webcam, and the top on the north side looks lit up.

Reply With Quote
     
     
  #6970  
Old Posted Nov 2, 2017, 12:18 AM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
Hmm that is something... Didn't know they worked grave yard shift!
Reply With Quote
     
     
  #6971  
Old Posted Nov 2, 2017, 12:47 AM
GtownFriend GtownFriend is offline
Registered User
 
Join Date: Dec 2016
Location: Boulder CO
Posts: 600
We must now be at steps 10 & 10a..
Note the reference to a "2nd shift" for 10a..
So lantern steel by day and cooling tower cladding by night

Quote:
Originally Posted by PHL10 View Post




Reply With Quote
     
     
  #6972  
Old Posted Nov 2, 2017, 2:41 AM
El Duderino's Avatar
El Duderino El Duderino is offline
build awesome buildings
 
Join Date: Aug 2016
Location: Philadelphia
Posts: 652
it's crazy to think that 3.5 weeks after the lantern steel starts in earnest, it will be at full height (if things go according to the schedule above). good times.
Reply With Quote
     
     
  #6973  
Old Posted Nov 2, 2017, 2:49 AM
GtownFriend GtownFriend is offline
Registered User
 
Join Date: Dec 2016
Location: Boulder CO
Posts: 600
I'm sure its somewhere in this thread.. but what is the estimated number of people working in CTC once complete? Thanks..
Reply With Quote
     
     
  #6974  
Old Posted Nov 2, 2017, 5:37 AM
Sam Rai Sam Rai is offline
Registered User
 
Join Date: Jun 2015
Posts: 14
are we sure the core extension is complete? To me diagram 10a makes it look like the cooling towers in right now are the lower ones...and the next two will be put on top of them...not under as people on here have suggested. The core extension in 10a and on most of the rendering images looks taller than what we have so far
Reply With Quote
     
     
  #6975  
Old Posted Nov 2, 2017, 11:23 AM
Marcos Marcos is offline
Registered User
 
Join Date: Nov 2016
Location: West Chester, PA
Posts: 277
Quote:
Originally Posted by Sam Rai View Post
are we sure the core extension is complete? To me diagram 10a makes it look like the cooling towers in right now are the lower ones...and the next two will be put on top of them...not under as people on here have suggested. The core extension in 10a and on most of the rendering images looks taller than what we have so far
I think & hope you're right, I've been wondering the same thing as it appears they've only put in 2 of the 4 units. How are they supposed to jam the other 2 in the structure under the ones already placed... I really hope that tower goes up another clip

Edit: and by the way, I observe it every morning from Baltimore Pike (Route 1) at its intersection with 352 in Media PA, quite a distance but on a clear day you can see Comcast & CTC side by side perfectly. Finally, CTC appears to be at an equal height with Comcast. If/when that tower goes up a little higher I think it'll give CTC the edge in visual height even from that great distance as opposed to just being higher due to the lantern.
Reply With Quote
     
     
  #6976  
Old Posted Nov 2, 2017, 12:01 PM
gw04 gw04 is offline
Registered User
 
Join Date: Jun 2015
Posts: 172
Quote:
Originally Posted by Marcos View Post
I think & hope you're right, I've been wondering the same thing as it appears they've only put in 2 of the 4 units. How are they supposed to jam the other 2 in the structure under the ones already placed... I really hope that tower goes up another clip

Edit: and by the way, I observe it every morning from Baltimore Pike (Route 1) at its intersection with 352 in Media PA, quite a distance but on a clear day you can see Comcast & CTC side by side perfectly. Finally, CTC appears to be at an equal height with Comcast. If/when that tower goes up a little higher I think it'll give CTC the edge in visual height even from that great distance as opposed to just being higher due to the lantern.
From page 297, I'm not sure what the special red section is, but it doesn't appear on slide 9. It looks like that tower section is done, so the mystery is what that red section represents.

Reply With Quote
     
     
  #6977  
Old Posted Nov 2, 2017, 12:13 PM
Marcos Marcos is offline
Registered User
 
Join Date: Nov 2016
Location: West Chester, PA
Posts: 277
Quote:
Originally Posted by gw04 View Post
From page 297, I'm not sure what the special red section is, but it doesn't appear on slide 9. It looks like that tower section is done, so the mystery is what that red section represents.

yea I've seen that too, which is why it is confusing. They built what looked like section 1 of the tower & the next step was supposed to be placing the cooling units in followed by erecting section 2 of the tower then placement of units 3 & 4. But what they did was build section 1 and 2 then place units 1 & 2 into section 2??? Section 1 is empty, how are they getting the cooling units in there? Unless I missed something this is what has happened thus far leading me to think the 2 remaining units are going on top of what we already have?
Reply With Quote
     
     
  #6978  
Old Posted Nov 2, 2017, 12:17 PM
Trich Trich is offline
Registered User
 
Join Date: Jun 2016
Posts: 76
Units 1 & 2 were set months ago. Prior to the steel cracking. There is no evidence that they took them out. They sit level with the main roof, not above the red/pink pipes in those renderings. Maybe this is why they are harder to see. I tried to find the posts from the summer time when they hoisted them into place but I could not find them quick enough. I'll look again later when I have more time.
Reply With Quote
     
     
  #6979  
Old Posted Nov 2, 2017, 12:21 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
Quote:
Originally Posted by Trich View Post
Units 1 & 2 were set months ago. Prior to the steel cracking. There is no evidence that they took them out. They sit level with the main roof, not above the red/pink pipes in those renderings. Maybe this is why they are harder to see. I tried to find the posts from the summer time when they hoisted them into place but I could not find them quick enough. I'll look again later when I have more time.
glad you explained that because it certainly is difficult to see anything in there. The pink items may be pumps.
Reply With Quote
     
     
  #6980  
Old Posted Nov 2, 2017, 12:22 PM
Marcos Marcos is offline
Registered User
 
Join Date: Nov 2016
Location: West Chester, PA
Posts: 277
Quote:
Originally Posted by Trich View Post
Units 1 & 2 were set months ago. Prior to the steel cracking. There is no evidence that they took them out. They sit level with the main roof, not above the red/pink pipes in those renderings. Maybe this is why they are harder to see. I tried to find the posts from the summer time when they hoisted them into place but I could not find them quick enough. I'll look again later when I have more time.
did they hoist them directly from the ground because I swear those two units that were sitting on the roof of the office section never moved, maybe that's why I'm thinking the section 1 tower has been empty all this time (assuming those two would be the first two set)
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump



Forum Jump


All times are GMT. The time now is 6:24 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.