Quote:
Originally Posted by dubu
there could be a new small bridge built and then the freeway bridge could be switched to three lanes. that might make it hard for some drivers. they diserve it haha  but that bridge is old and probably should skip reconstruction.
now that i think about it you mean building a new freeway bridge, 2035 is about fifteen years.
hope theres a bike and pedestrian trail on the bridge. maybe a bike trail along i205 in west linn
|
Topics are getting confused...
The new 205 additions will be happening over the next few years.
This thread is about the 2035 comprehensive plan in Portland.