Quote:
Originally Posted by OTSkyline View Post
Not sure if there is a thread for it already but drove past a new construction on Maisonneuve in Hull yesterday right next to the Government offices and such.

Found it online and its called "The Vibe"?

http://levibe.ca/#galerie

The construction site referenced "condos" but I thought I saw something saying "for rent"... So is it condos to buy? Rentals?
http://forum.skyscraperpage.com/showthread.php?t=101824&page=158
Reply With Quote
     
     
  #5162  
Old Posted Oct 4, 2017, 3:13 PM
kevinbottawa kevinbottawa is offline
 
Join Date: May 2010
Posts: 2,260
Quote:
Surface Developments plans 12-storey condo for growing Scott Street corridor in Westboro

An Ottawa builder is proposing a 56-unit condo project for a rapidly developing stretch of Scott Street in Westboro.

Surface Developments, which has built several condos in the National Capital Region, has filed a site plan application for a 12-storey building at 1946 Scott St. The site is 300 metres from the Westboro Transitway station and next door to Colonnade Bridgeport’s planned 24-storey mixed-use highrise at the former location of the Trailhead Paddle Shack.

Current zoning bylaws cap building heights at 18 metres, while Surface’s proposed condo would be nearly 40 metres tall. The building would include a 122-square-metre rooftop lounge with a deck and barbecue enclosure.

The developer says its plan is “sensitively designed” to fit the character of the neighbourhood while increasing density near the Westboro rapid transit station.

“The articulated architecture of the building is intended to create a unique presence on the streetscape, differentiating this segment of Scott Street from the lack of development to the east,” the company says.



While current zoning also requires 22 parking spaces for residents and four spots for visitors, Surface’s proposal includes a total of just 13 spaces. The company argues that number is “appropriate for the context” of the building due to its close proximity to public transit.

“The reduced parking facilities will encourage alternative forms of transportation, which may also encourage residents to patronize Richmond Road businesses and other area shops and services to meet daily needs,” the site plan application says.

The neighbourhood is also home to Colonnade Bridgeport’s Westboro Connection mixed-used office and residential property on McRae Avenue. Tenants of that property include Alterna Savings, IT consultant Pythian and Farm Boy.

Completed in 2015, Westboro Connection was billed as “the first phase of a major transformation along McRae Avenue” by Colonnade Bridgeport, which called the property “one of the largest underdeveloped sites in Westboro.”
http://obj.ca/article/surface-developmen...o-growing-scott-street-corridor-westboro
Reply With Quote
     
     
  #5163  
Old Posted Oct 4, 2017, 5:22 PM
rocketphish's Avatar
rocketphish rocketphish is offline
 
Join Date: Feb 2009
Posts: 14,723
Reply With Quote
     
     
  #5164  
Old Posted Oct 4, 2017, 10:57 PM
rocketphish's Avatar
rocketphish rocketphish is offline
 
Join Date: Feb 2009
Posts: 14,723
Backup BEEP BEEP BEEP from city snow vehicles could be silenced for good

Jon Willing, Ottawa Citizen
Published on: October 4, 2017 | Last Updated: October 4, 2017 4:46 PM EDT


The beeping backup signals could be removed from the city’s fleet of snow-clearing vehicles if a trial on new, and more tolerable, audio technology is a success this winter.

Council’s transportation committee on Wednesday approved spending $120,000 on the new warning devices for 302 vehicles. City staff will try the broadband technology on a handful of units before making a decision on installing the entire snow fleet with the quieter warning devices.

Councillors received a demonstration of the broadband system, which sounds like short bursts of TV static, compared to the loud piercing sound of the backup warning beeps.

The broadband technology is designed so only the people in the area of the sound will hear it, unlike the beeping that bounces off surrounding buildings, creating a major annoyance for residents, especially if it’s in the middle of the night.

Gloucester-Southgate Coun. Diane Deans asked staff to look into the broadband technology last May when councillors were discussing the noise bylaw.

“If this trial is successful, there will be a lot of happy citizens in this city,” Deans said on Wednesday.

The city can’t do much about the warning devices private snow-clearing companies use on their equipment. Convincing them to embrace the broadband technology could be a tough sell since the devices are more expensive. According to the city’s research, the cost of a backup beep alarm is $29, while the broadband alarm ranges from $151-$266, depending on the decibel level.

The committee also approved buying a new van for Ottawa Public Health if the health unit pursues a mobile supervised injection service in 2018.

Ideally, if the health board approves applying for a mobile service, the cost of the $150,000 van would be covered by the province. The health unit would also need a federal exemption to run a mobile injection service.

Council will be asked to approve the fleet plans next Wednesday.

[email protected]
twitter.com/JonathanWilling

http://ottawacitizen.com/news/local-news...snow-vehicles-could-be-silenced-for-good
Reply With Quote
     
     
  #5165  
Old Posted Oct 9, 2017, 9:22 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
 
Join Date: Mar 2012
Posts: 29,167
Can't find any articles, but Ottawa's TD Place is no longer in the running as a potential site of NA's 2016 bid for the FIFA World Cup bid. Stadium is too small. In Canada, only Vancouver, Edmonton, Toronto and Montreal are still part of the bid.
Reply With Quote
     
     
  #5166  
Old Posted Oct 9, 2017, 9:40 PM
citydwlr citydwlr is offline
 
Join Date: Mar 2013
Posts: 734
Quote:
Originally Posted by J.OT13 View Post
Can't find any articles, but Ottawa's TD Place is no longer in the running as a potential site of NA's 2016 bid for the FIFA World Cup bid. Stadium is too small. In Canada, only Vancouver, Edmonton, Toronto and Montreal are still part of the bid.
http://www.cbc.ca/sports/soccer/four-canadian-cities-2026-world-cup-hosts-1.4329825

My understanding though is that since there are 40 teams involved that year, some of those smaller stadiums may act as "home-base" training facilities during the WC. So, if that is true, Ottawa may potentially still have a chance to play a role...

Morocco has also submitted a competing bid as well.

On a side note, usually the host Country is given an automatic berth into the games; so, how does that work in the case of the joint North-American bid where there are 3 Countries involved? Do all three Countries get an automatic berth?

Last edited by citydwlr; Oct 9, 2017 at 9:56 PM.
Reply With Quote
     
     
  #5167  
Old Posted Oct 17, 2017, 10:49 PM
citydwlr citydwlr is offline
 
Join Date: Mar 2013
Posts: 734
Lord Stanley's Monument has been dropped off on Sparks... I guess the unveiling will be soon?

Quote:


The cup has arrived!#lordstanleygift @SparksStreet @Senators
Source: https://twitter.com/Stanleysgift/status/920309232821526528
Reply With Quote
     
     
  #5168  
Old Posted Oct 18, 2017, 5:05 PM
rocketphish's Avatar
rocketphish rocketphish is offline
 
Join Date: Feb 2009
Posts: 14,723
Federal government getting almost $40M to cover damage caused by Louis St. Laurent building fire

David Pugliese, Ottawa Citizen
Published on: October 17, 2017 | Last Updated: October 17, 2017 5:28 PM EDT


The federal government will receive a payout of almost $40 million to cover the damage and disruption caused by a fire at a Department of National Defence building in Gatineau.

Plans to repair the Louis St. Laurent building are still being worked out, but the government has submitted eight different claims to recover everything from removing debris to the installation of a temporary roof, according to documents obtained by the Citizen.

The fire broke out on April 21, 2016, forcing the shutdown of the facility at 555 Boulevard de la Carrière.

The 1,700 DND employees who worked at the site were shifted to various locations around Ottawa and Gatineau.

The documents indicate the government has made claims totalling $39.6 million.

The fire started on the sixth floor of the Louis St. Laurent building and part of the roof caved in as a result of the blaze.

Over the past year, the debris from the collapsed roof has been removed. A wall has been built to seal off the damaged area.

Metal posts have been installed on various floors and in the parking garage to stabilized the structure. Two cranes were also brought in to help with removal of debris. A temporary roof has also been installed.

Work on the fifth and sixth floor of the building alone has cost almost $14 million, according to the documents produced by an independent insurance adjuster and provided to Public Services and Procurement Canada. Another $1.4 million was spent removing debris.

Consultants earned $1 million in fees for a variety of services, including dealing with environmental decontamination. Security for the damaged building cost more than $430,000 and other engineering fees totalled $880,000. The temporary roof cost $443,000. The insurance also covered up shoring up the structure, the payment of municipal taxes and hydro fees and rental equipment.

Nicolas Boucher, a spokesman for Public Services and Procurement Canada, said the department is working closely with the insurance company to complete the repair and restoration of the building following the fire. “Legal documents were filed in court to set up a trust account to assist the insurance company to deposit the funds to cover the repairs and indemnifications,” he added in an email.

DND has now developed an interim strategy to consolidate its employees from the building in three main locations. Those sites include an office building at 975 Boulevard Saint-Joseph, in Gatineau, a building at 400 Cumberland St. in downtown Ottawa, and the National Printing Bureau at 45 Boulevard Sacré-Coeur, Gatineau. Some of the employees who were forced out of the Louis St. Laurent building were already working at those locations, while other public servants were dispersed at other locations throughout Ottawa and Gatineau.

The Louis St. Laurent building was home to the DND’s procurement branch. Defence officials have said that the upheaval from the fire has not affected the management of procurement projects for the military.

Details have not been provided about how long it will take to prepare the building so federal workers can return. The facility was built in 1985 and contains 40,000 square metres of office space, according to the federal government.

No cause of the fire has been released. But the blaze came amid a proposed $5-million renovation of the facility.

[email protected]
Twitter.com/davidpugliese

http://ottawacitizen.com/news/local-news...caused-by-louis-st-laurent-building-fire
Reply With Quote
     
     
  #5169  
Old Posted Oct 18, 2017, 5:38 PM
lrt's friend lrt's friend is offline
 
Join Date: Dec 2006
Posts: 12,817
Quote:
Originally Posted by citydwlr View Post
Lord Stanley's Monument has been dropped off on Sparks... I guess the unveiling will be soon?


Source: https://twitter.com/Stanleysgift/status/920309232821526528
Early December unveiling I believe.
Reply With Quote
     
     
  #5170  
Old Posted Oct 18, 2017, 10:03 PM
mykl mykl is offline
 
Join Date: Jan 2015
Posts: 475
Quote:
Originally Posted by lrt's friend View Post
Early December unveiling I believe.
Its strange. CBC Ottawa posted an article on Facebook today and their comment when posting says "The monument will be officially unveiled on Oct. 28." but the actual article says it will be completed around December.
Reply With Quote
     
     
  #5171  
Old Posted Oct 19, 2017, 1:03 AM
zzptichka zzptichka is offline
 
Join Date: Dec 2015
Posts: 2,401
Quote:
Originally Posted by mykl View Post
Its strange. CBC Ottawa posted an article on Facebook today and their comment when posting says "The monument will be officially unveiled on Oct. 28." but the actual article says it will be completed around December.
Unveiling it for the Winter Classic on Dec 16th makes most sense.
Reply With Quote
     
     
  #5172  
Old Posted Oct 19, 2017, 5:07 PM
rocketphish's Avatar
rocketphish rocketphish is offline
 
Join Date: Feb 2009
Posts: 14,723
Monument to 'Lord Stanley's gift' arrives in Ottawa
New Sparks Street attraction be completed by December, when city hosts outdoor NHL game

CBC News
Posted: Oct 18, 2017 5:00 AM ET Last Updated: Oct 18, 2017 11:23 AM ET




The installation of the Stanley Cup monument at the intersection of Sparks and Elgin Street in Ottawa is officially underway, and is expected to be completed in December.

The monument was designed last year by a Montreal-based team called Covit/Nguyen/NORR. Their tribute to Lord Frederick Stanley beat out the designs of seven other teams.

The structure will sit on a small rink, and will be embedded with stainless steel lines designed to evoke skate marks. There will also be 39 granite discs engraved with the names of the Stanley Cup winners from 1893 to 2017.

This year marks the 125th anniversary of Lord Stanley's donation of the cup that has been named in his honour.

The completion of the monument will be just part of hockey celebrations in Ottawa in December.

The Senators will also host the Montreal Canadiens in an outdoor NHL game at TD Place on December 16.

Canadian Heritage is also partnering with the Ottawa Senators and the Bell Capital Cup to build the first ever NHL-sized skating rink on Parliament Hill as part of the closing events for Canada's 150 celebrations.

The rink is expected to be open from Dec. 7 to 31.

Facebook video

http://www.cbc.ca/news/canada/ottawa/stanley-cup-monument-ottawa-sparks-street-1.4358858
Reply With Quote
     
     
  #5173  
Old Posted Oct 23, 2017, 3:13 AM
zzptichka zzptichka is offline
 
Join Date: Dec 2015
Posts: 2,401
Looks ready

Reply With Quote
     
     
  #5174  
Old Posted Oct 23, 2017, 3:16 AM
zzptichka zzptichka is offline
 
Join Date: Dec 2015
Posts: 2,401
Quote:
Originally Posted by rocketphish View Post
Canadian Heritage is also partnering with the Ottawa Senators and the Bell Capital Cup to build the first ever NHL-sized skating rink on Parliament Hill as part of the closing events for Canada's 150 celebrations.

The rink is expected to be open from Dec. 7 to 31.
Current status:

Reply With Quote
     
     
  #5175  
Old Posted Oct 23, 2017, 3:18 AM
kwoldtimer kwoldtimer is offline
 
Join Date: Jan 2008
Posts: 26,252
Quote:
Originally Posted by zzptichka View Post
Looks ready

Such an improvement over that God-awful bear!
Reply With Quote
     
     
  #5176  
Old Posted Oct 23, 2017, 4:05 AM
zzptichka zzptichka is offline
 
Join Date: Dec 2015
Posts: 2,401
I wonder is that tactile surface is there to stay. The way it's laid right now is horrendous.
I get it you didn't think of it when you designed the monument but at least make now those setbacks symmetrical ffs.
Reply With Quote
     
     
  #5177  
Old Posted Oct 23, 2017, 8:44 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
 
Join Date: Mar 2012
Posts: 29,167
Best designed monument/public art piece in years!
Reply With Quote
     
     
  #5178  
Old Posted Oct 23, 2017, 10:33 PM
mykl mykl is offline
 
Join Date: Jan 2015
Posts: 475
Quote:
Originally Posted by zzptichka View Post
I wonder is that tactile surface is there to stay. The way it's laid right now is horrendous.
I get it you didn't think of it when you designed the monument but at least make now those setbacks symmetrical ffs.
It does look absolutely ridiculous. But I suppose the reason for the right side being set away from the "hockey rink" is that the monument itself isn't centered, but over to the right as well. I guess they went with the minimum clearance on each side and didn't care about the look at all. To be honest, this is fitting with the insane patchwork that is Sparks St.
Reply With Quote
     
     
  #5179  
Old Posted Oct 27, 2017, 11:48 AM
rocketphish's Avatar
rocketphish rocketphish is offline
 
Join Date: Feb 2009
Posts: 14,723
'Stealth' bunkhouse sneaking into Old Ottawa South, says councillor
Expanded six-plex will have 27 bedrooms, instead of the 12 proposed by developer during approval

By Susan Burgess, CBC News
Posted: Oct 27, 2017 5:00 AM ET Last Updated: Oct 27, 2017 5:00 AM ET



What 177 Hopewell looked like before construction began, according to "planning rationale" documents submitted by the consulting firm Fotenn.

A builder in Old Ottawa South got approval to expand a six-unit apartment building by making assurances it would have only 12 bedrooms, but months later, the number of bedrooms suddenly ballooned to 27.

And David Chernushenko, the councillor for the area, says he's powerless to stop what he calls an "over-development by stealth."

Builder Jordan Tannis wanted to enlarge the six-plex at 177 Hopewell Ave. Last October, his application appeared before the city's committee of adjustment, a council-appointed tribunal that makes decisions on minor planning issues. The project qualifies as an expansion, as opposed to a completely new project, under the city's rules despite the fact that a single wall is the only obvious remaining part of the original structure.

During the hearing, Brian Casagrande — a Fotenn planning consultant hired by the builder — repeatedly assured committee members and concerned neighbours that Tannis intended to fill the renovated building with six two-bedroom units. He said the existing building also had six units, but with eight bedrooms between them.

In an official audio recording of the meeting, he can be heard dismissing concerns of neighbours about a potential tripling of people living on the site, saying "I want the committee to understand that that is not in fact true," and that "the intention of the proposal is to have all two-bedroom units."

Later, he refers to floor plans, saying: "The intention is shown on the plans. This plan here is showing you two-bedroom units."

Moreover, Tannis's intention was to create "a higher-end version of rental units," the consultant told the committee.

"He's not going to want one unit with 10 kids slammed and sandwiched into it," said Casagrande, referring to concerns about student housing given the building's proximity to Carleton University.

But the latest version of the plans, which came to light just a few weeks ago, paint a very different picture, according to Chernushenko.

Those plans depict five units with four bedrooms each, and another seven-bedroom unit spanning two floors, for a total of 27 bedrooms, according to staff in the councillor's office.

In other words, while the builder had explicitly proposed a 50-per-cent increase in the number of bedrooms when arguing for approval of the plans, the development is now on track for an increase greater than 300 per cent.

The builder "told a nice story, and then went about doing what they wanted to after all," said Chernushenko.

The plan with the extra bedrooms was submitted to the city last June, weeks before city council approved an interim control by-law to deal with the problem of so-called "bunkhouses," and which put a one-year freeze on new construction or renovations of a building with a large number of bedrooms.

Neighbours, who have kept an eagle eye on the development for more than a year, accuse the builder of pulling a fast one.

Karen Stevens-Guille, who lives next door to 177 Hopewell, attended meetings and stayed abreast of the entire process, yet discovered the plan for additional bedrooms only by chance.

"I noticed a bunch of new windows in the foundation that weren't there on the plans that I understood had been signed off on by the city," she said.

Stevens-Guille quickly contacted Chernushenko and city staff, who investigated. In late September, Chernushenko's office delivered the news that the city's Building Code Services branch had in fact approved plans for 27 bedrooms.

"I feel completely let down by the City of Ottawa. I feel really betrayed," said Stevens-Guille, adding many people in the community participated in public consultation on the project. "We don't think it's right to be able to promise one thing and build another and for that to be OK, to be allowed to proceed."

Even the early proposal had residents concerned about issues such as increased traffic, a shortage of parking and the storage of garbage on the site, and the latest version of the plan has only intensified those concerns.


The proposed expansion of the six-plex on Hopewell Avenue, from planning rationale documents submitted to the city's committee of adjustment by the consulting firm Fotenn.

Neighbours might be angry, but the builder has done nothing illegal, according to Doug James, the city's manager of development review.

That's because in its ruling, the committee of adjustment tied its decision only to the size and location of the construction, James said in an e-mail, not to the number of bedrooms.

"No City By-laws were broken and the construction is moving forward in accordance with the plans approved by the Committee of Adjustment," James said.

Asked whether the committee could have opted to include a condition tying the approval to the number of bedrooms, James said yes, but that the plans filed by the committee of adjustment did not include floor plans.

Stevens-Guille isn't buying that excuse, noting that even if the committee's ruling doesn't mention bedrooms, numerous other documents from the city do.

The notice of hearing to residents states: "the number of units will remain at six and the units will be expanded to two and three bedroom units." The same language appears in the pre-amble of the document that contains the committee of adjustment decision.

That language suggests a maximum of 18 bedrooms was contemplated, more than discussed by Casagrande at the meeting but a third fewer than the 27 currently planned.

Jeff Tobin, who also lives right next to 177 Hopewell, said assurances from the city about the number of bedrooms influenced his decision to buy the house last December.

His realtor reached out to the committee of adjustment, Tobin said, and quickly relayed to him exterior plans for the house next door, along with the information that it would have six units of two to three bedrooms each.

"If we had any knowledge of the bedroom count or even the knowledge that all that had been approved was the building size with no restrictions on bedrooms, we would not have purchased the home," Tobin said in an email.

The builder arrived at 177 Hopewell shortly after CBC began an interview with Stevens-Guille.

Tannis declined to have his comments filmed or recorded, but adamantly denied he had ever presented a plan for the number of bedrooms, and that in any case it's not the place of the committee of adjustment to regulate a building's interior.

"We're not doing anything sneaky or tricky," he said. "We're following the rules the city puts forward."

Tannis also told CBC that "stories like this give credence to complainers and I think it's not fair." It's also unfair to discriminate against students when building housing, he said.

The city does need to change the rules around how developments are approved, Chernushenko said, but he also took a shot at builders on the lookout for loopholes.

"Someone who has an intent to shoehorn as many people (as they can) onto a property and maximize their rental income out of it is going to keep looking for them," Chernushenko said. "The city has always got to be trying to stay ahead of it, and then closing them as quickly as we can."

Stevens-Guille warned if things don't change, other communities are at risk.

"This can happen anywhere in Ottawa," she said. "It's not just us. It has nothing to do with our precise neighbourhood."

http://www.cbc.ca/news/canada/ottawa/stealth-bunkhouse-sneak-old-ottawa-south-1.4373265
Reply With Quote
     
     
  #5180  
Old Posted Oct 27, 2017, 1:08 PM
kwoldtimer kwoldtimer is offline
 
Join Date: Jan 2008
Posts: 26,252
I have no problem whatever with student apartments, but the City really needs to make sure that something like this cannot happen again, istm.

Last edited by kwoldtimer; Oct 27, 2017 at 1:45 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 5:21 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.