  #3881  
Old Posted Sep 24, 2017, 8:44 AM
Whalleyboy's Avatar
Whalleyboy Whalleyboy is offline
Registered User
 
Join Date: Jul 2008
Location: Surrey
Posts: 2,014
Actually that movement failed on getting the 10% of voters in surrey to sign it got 12,000 when it needed over 30,000.

side note I am actually for another road connecting surrey central and guildford

The 106 ave road was actually the original planned route but the city figured its truly cut the park in half and didnt want use that route
     
     
  #3882  
Old Posted Sep 24, 2017, 2:57 PM
memememe76 memememe76 is offline
Registered User
 
Join Date: Aug 2011
Posts: 842
Do we really need another road? Sure, it can get busy but I never get frustrated on 100, 104 or 108 like I do when I am on Kingsway, Willingdon, Main, or Boundary.

And I like the small parks in Surrey.
     
     
  #3883  
Old Posted Sep 24, 2017, 5:47 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,203
I think the thought is that 104 will suck after the LRT goes in.

Why not just run the LRT through the park on the 105 alignment? It would surely be much less disruptive to the park than a road, and would be far easier to construct than on a busy street.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #3884  
Old Posted Sep 24, 2017, 6:29 PM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by Alex Mackinnon View Post
I think the thought is that 104 will suck after the LRT goes in.

Why not just run the LRT through the park on the 105 alignment? It would surely be much less disruptive to the park than a road, and would be far easier to construct than on a busy street.
Transit is severely hampered when it runs off of the main corridors it's intended to serve.
     
     
  #3885  
Old Posted Sep 25, 2017, 2:37 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Migrant_Coconut View Post
Again, self-driving tech still needs a whole lot of work. But don't take my word for it.
I never said it was ready today. I said:

Quote:
Originally Posted by roger1818 View Post
With all the work in self driving cars, it won't be long before automation for at grade LRT systems will be available.
Granted "not long" is rather subjective, but your crystal ball is as good as mine.

Quote:
Originally Posted by Migrant_Coconut View Post
SkyTrain has faregates
I said "over 30 years ago" (i.e. when it first opened). Back then they didn't have faregates but used an honour system. I am not sure when they added faregates, but it ran without them for many years.


Quote:
Originally Posted by Migrant_Coconut View Post
TransLink's already done that;
I have yet to find this EA. The only things I can find are the SURREY RAPID TRANSIT ALTERNATIVES ANALYSIS PHASE 2 EVALUATION in 2012 and the only conclusion it draws is "The results of this evaluation will help to inform the selection of a preferred alternative" and a Findings to Date document in 2013 in which Traslink cherry-picked 4 of the options (1 BRT only, 2 LRT/BRT and 1 SkyTrain/BRT) with no real explanation of why they were selected (certainly no explanation as to why RRT 2 was dropped when it is very competitive with RRT 1a and arguably better than all of the other options).


Quote:
Originally Posted by Migrant_Coconut View Post
TransLink's already done that; SkyTrain + BRT was considered to be one of the best options.
OMG!!! If that is the preference in this thread, why then did everyone freak out when I suggested BRT in my first post in this thread? It seemed like everyone wanted SkyTrain to be extended everywhere.

Quote:
Originally Posted by roger1818 View Post
some type of express service (bus or train) on a dedicated corridor would be much more effective.
Quote:
Originally Posted by Migrant_Coconut View Post
Obviously LRT works if done right. Problem is that Surrey's got the wrong corridors and the near-cheapest implementation.
There is no argument from me, especially on the KGB and 104 Ave routes.
     
     
  #3886  
Old Posted Sep 25, 2017, 4:05 PM
waves's Avatar
waves waves is offline
waves
 
Join Date: Jun 2015
Location: North Vancouver
Posts: 382
Quote:
Originally Posted by roger1818 View Post
I said "over 30 years ago" (i.e. when it first opened). Back then they didn't have faregates but used an honour system. I am not sure when they added faregates, but it ran without them for many years.
2012 was the first fare gate: https://beta.theglobeandmail.com/news/br...867/?ref=http://www.theglobeandmail.com&
     
     
  #3887  
Old Posted Sep 25, 2017, 7:38 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,143
Quote:
Originally Posted by roger1818 View Post
I said "over 30 years ago" (i.e. when it first opened). Back then they didn't have faregates but used an honour system. I am not sure when they added faregates, but it ran without them for many years.
And before that, I said "we still need operators to stop fare evaders." In the past - and even now - we've had Transit Police (the green vests) standing around and writing tickets; like with your driverless bus/tram, automation won't change that.

No need to remind anybody, practically everyone in Vancouver once used that honour system... or didn't, hence the faregates.

Quote:
Originally Posted by roger1818 View Post
I have yet to find this EA. The only things I can find are the SURREY RAPID TRANSIT ALTERNATIVES ANALYSIS PHASE 2 EVALUATION in 2012 and the only conclusion it draws is "The results of this evaluation will help to inform the selection of a preferred alternative" and a Findings to Date document in 2013 in which Traslink cherry-picked 4 of the options (1 BRT only, 2 LRT/BRT and 1 SkyTrain/BRT) with no real explanation of why they were selected (certainly no explanation as to why RRT 2 was dropped when it is very competitive with RRT 1a and arguably better than all of the other options).
If you want to argue with the experts or accuse them of playing favourites, that's on you, not us. Personally, I'd throw out an Expo extension to Newton simply because King George Station and the subsequent track already points to Fraser Highway - if SkyTrain to Langley is considered "too expensive," consider the cost of realigning a station and/or turning the line back towards Newton.

Quote:
Originally Posted by roger1818 View Post
OMG!!! If that is the preference in this thread, why then did everyone freak out when I suggested BRT in my first post in this thread? It seemed like everyone wanted SkyTrain to be extended everywhere.
The alleged freakout (more like a collective "no, that's won't work") came from you suggesting that a permanent BRT or B-Line would do the same job as a SkyTrain line. Rather, the B-Line's a placeholder until said SkyTrain can be built.

Quote:
Originally Posted by roger1818 View Post
There is no argument from me, especially on the KGB and 104 Ave routes.
Alright, good to know that we all agree on something. Let's go back to the original argument:

Quote:
Originally Posted by roger1818 View Post
But is it the right technology for the region? There are many other ways to do that and I am not sure ALRT is the correct one. The ALRT is great, but it locks you into that one technology forever. A more generic technology has more flexibility for the future. A busway could have rails added to it later. A rail system with an overhead centenary (LRT or other) could be extended to provide express service into Vancouver when that becomes necessary.
Understand that SkyTrain is intended as a regional express service to connect the whole Metro and all its various townships, even the far-off suburban ones like White Rock, Maple Ridge and Langley. As with many other cities, LRT would be fine as a local express service where SkyTrain isn't cost-effective or necessary (Arbutus, west Newton, etc)...

But suggesting that LRT could be used as the regional service, no matter how well-designed, is dead on arrival. We've already got one. It works just fine. Introducing another technology - with the exact same function and no compatibility with the existing one it replaces - adds nothing and only makes things more complicated.

And if SkyTrain ever does go over-capacity with no possibility of a relief line or upgrades, that's what commuter rail is for.
     
     
  #3888  
Old Posted Sep 26, 2017, 2:31 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Migrant_Coconut View Post
Introducing another technology - with the exact same function and no compatibility with the existing one it replaces - adds nothing and only makes things more complicated.
Things are already more complicated as the Canada Line uses a different, incompatible technology, but your point is well taken and already mentioned by someone else and we moved on from there.
     
     
  #3889  
Old Posted Sep 26, 2017, 5:22 PM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Hep's plan for her 105th ave road project is hitting a few more snags. Now the Surrey School Board is stepping into the fight. They want a new playground and a new school since a new LRT station will be at the intersection of their school. If they don't get their wishes, they say no road.

https://globalnews.ca/news/3768942/no-fi...oard-uncertain-over-citys-proposed-plan/
     
     
  #3890  
Old Posted Sep 26, 2017, 6:48 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Migrant_Coconut View Post
And before that, I said "we still need operators to stop fare evaders." In the past - and even now - we've had Transit Police (the green vests) standing around and writing tickets; like with your driverless bus/tram, automation won't change that.

No need to remind anybody, practically everyone in Vancouver once used that honour system... or didn't, hence the faregates.



If you want to argue with the experts or accuse them of playing favourites, that's on you, not us. Personally, I'd throw out an Expo extension to Newton simply because King George Station and the subsequent track already points to Fraser Highway - if SkyTrain to Langley is considered "too expensive," consider the cost of realigning a station and/or turning the line back towards Newton.



The alleged freakout (more like a collective "no, that's won't work") came from you suggesting that a permanent BRT or B-Line would do the same job as a SkyTrain line. Rather, the B-Line's a placeholder until said SkyTrain can be built.



Alright, good to know that we all agree on something. Let's go back to the original argument:



Understand that SkyTrain is intended as a regional express service to connect the whole Metro and all its various townships, even the far-off suburban ones like White Rock, Maple Ridge and Langley. As with many other cities, LRT would be fine as a local express service where SkyTrain isn't cost-effective or necessary (Arbutus, west Newton, etc)...

But suggesting that LRT could be used as the regional service, no matter how well-designed, is dead on arrival. We've already got one. It works just fine. Introducing another technology - with the exact same function and no compatibility with the existing one it replaces - adds nothing and only makes things more complicated.

And if SkyTrain ever does go over-capacity with no possibility of a relief line or upgrades, that's what commuter rail is for.
utdc was planning on building stretched and widened cars based on the mkI cars to make trains for an automated commuter system called "go-alrt", but the gov't went with typical commuter trains for GO transit

http://transit.toronto.on.ca/photos/images/go-alrt-s1465-f597-i38.jpg

Last edited by jsbertram; Sep 26, 2017 at 7:00 PM.
     
     
  #3891  
Old Posted Sep 26, 2017, 7:03 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,143
Quote:
Originally Posted by Trainguy View Post
Hep's plan for her 105th ave road project is hitting a few more snags. Now the Surrey School Board is stepping into the fight. They want a new playground and a new school since a new LRT station will be at the intersection of their school. If they don't get their wishes, they say no road.

https://globalnews.ca/news/3768942/no-fi...oard-uncertain-over-citys-proposed-plan/
This entire thing is becoming more and more like a really depressing sitcom.
     
     
  #3892  
Old Posted Sep 26, 2017, 7:31 PM
Bdawe Bdawe is offline
Registered User
 
Join Date: Aug 2015
Location: The West End
Posts: 535
Any knowledge on where the L-Line OMC would be?
     
     
  #3893  
Old Posted Sep 26, 2017, 9:45 PM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Quote:
Originally Posted by Migrant_Coconut View Post
This entire thing is becoming more and more like a really depressing sitcom.
Hep's response....

https://globalnews.ca/news/3769958/surre...ole-as-part-of-contentious-road-project/
     
     
  #3894  
Old Posted Sep 26, 2017, 10:36 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,653
I found something pretty cool.

In section C2, they talk about protecting the former BC Hydro ROW for a future passenger rail corridor to the valley.
     
     
  #3895  
Old Posted Sep 26, 2017, 11:37 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,591
Quote:
Originally Posted by cganuelas1995 View Post
I found something pretty cool.

In section C2, they talk about protecting the former BC Hydro ROW for a future passenger rail corridor to the valley.

It sounds like planning for the Arbutus greenway - something waaay in the future.
Quote:
C2.26
Protect the former BC Hydro 'inter-urban' rail corridor Right-of-Way for future potential as a passenger rail corridor extending from Surrey into the Fraser Valley.
     
     
  #3896  
Old Posted Sep 26, 2017, 11:54 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,591
Quote:
Originally Posted by cganuelas1995 View Post
Btw you might want to check this out. I don't agree with every single bit of it but there are some interesting ideas.
     
     
  #3897  
Old Posted Sep 27, 2017, 12:34 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,143
^ Sounds like zweisystem but a whole lot more intelligent and non-trollish.
     
     
  #3898  
Old Posted Sep 27, 2017, 5:21 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
Quote:
Originally Posted by Bdawe View Post
Any knowledge on where the L-Line OMC would be?
I think it'll be somewhere around 74th and KGB.
     
     
  #3899  
Old Posted Sep 28, 2017, 6:22 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by Migrant_Coconut View Post
This entire thing is becoming more and more like a really depressing sitcom.
The fact that Dianne Watts is running for leadership of the BC Liberals, and Global has nothing but good things to say about her makes me think that if she wins, Surrey ends up with 150km of rubbish at-grade LRT-streetcars.

The reality is that we know this is a bad project, Translink knows it's a bad project, the Province knows it a bad project, and the Province and the Federal Government just do not care, because they are just handing out money regardless of the business case. It's the city's problem once it's built, but other jurisdictions don't go out and select a new technology for every line because that makes training and maintenance costs that much higher.

As an analogy, it's like Southwest Airlines and Westjet who save money operating their airlines by standardizing on just ONE aircraft model. Where as all the other airlines just buy whatever fits their request for bids, and as a result cost more to maintain.

Past a certain point you just wash your hands of it when the idiots in charge want their vanity project come hell or high water.
     
     
  #3900  
Old Posted Sep 28, 2017, 6:17 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by cganuelas1995 View Post
I found something pretty cool.

In section C2, they talk about protecting the former BC Hydro ROW for a future passenger rail corridor to the valley.
As Sheba implied, protecting the rail corridor basically means don't let anyone build anything on it in case one day we want to use it.

The problem with the former BC Hydro 'inter-urban' rail corridor is that it is quite the cow path and would be as slow as molasses in January in Edmonton. Unless they can somehow straighten it out, it is unlikely to ever be used, but it is good that they want to protect it.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:24 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.