HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #17221  
Old Posted Sep 22, 2017, 10:21 PM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
lol why limit B-Line number to only 10 numbers? what's wrong with something like 89 B-line?

This is such a non issue LOL
     
     
  #17222  
Old Posted Sep 22, 2017, 10:46 PM
twoNeurons twoNeurons is online now
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,116
Quote:
Originally Posted by ilikeredheads View Post
lol why limit B-Line number to only 10 numbers? what's wrong with something like 89 B-line?

This is such a non issue LOL
Totally agree. The 80-series is practically wide open. Just the 84 which is practically a B-Line now... without the branding and bendy bits.

I wonder if we'll ever get a region big enough to validate use of the 900 series.

0-199 = Vancouver ( including communities like UBC, Kitsilano, Langara, and Burnaby)
200s = Vancouver's sea-to-sky bits
300s = Vancouver's southern bits with lots of people
400s = Vancouver's flat parts and airport land
500s = Vancouver's vineyards and horse stables
600s = Vancouver's ferry docks
700s = Vancouver's exurbs
800s = Vancouver's school buses
900s = ???
     
     
  #17223  
Old Posted Sep 23, 2017, 12:13 AM
sweetnhappy sweetnhappy is offline
Registered User
 
Join Date: Feb 2016
Location: Central Alberta, formerly BC Upper Fraser Valley
Posts: 95
Quote:
Originally Posted by twoNeurons View Post
I wonder if we'll ever get a region big enough to validate use of the 900 series.

900s = ???
The 900s are currently used for non-bus lines (SB, ST, WCE), at least according to Google Maps. Not sure if that's an internal numbering scheme or not.
     
     
  #17224  
Old Posted Sep 23, 2017, 1:57 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,593
Quote:
Originally Posted by sweetnhappy View Post
The 900s are currently used for non-bus lines (SB, ST, WCE), at least according to Google Maps. Not sure if that's an internal numbering scheme or not.
From The Buzzer Blog:
Quote:
Do you use Google Maps to plan your trip? There’s now TransLink colours and naming! This means there are no longer codes such as “992” for the Expo Line —it’s simply a blue tag labelled with “Expo Line.”
The Buzzer image also shows 997 for WCE and 998 for Seabus. I can't remember what Millennium and Canada Line used to be numbered on Google maps.
     
     
  #17225  
Old Posted Sep 23, 2017, 2:15 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
More seriously, my assumption was always that they would put B-Lines in the hundreds once it went past. As in 901, 902, etc. For at least a while, they could use retired B-Line numbers. Is there any real reason a 98 B-Line can't service Lougheed Highway?

But I mean really, it's not a big deal. I'm sure they'll figure out a way haha.
     
     
  #17226  
Old Posted Sep 23, 2017, 4:54 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by GlassCity View Post
More seriously, my assumption was always that they would put B-Lines in the hundreds once it went past. ... But I mean really, it's not a big deal. I'm sure they'll figure out a way haha.
If route "C20" is a totally different thing than route "20", then all they need to do for the B-Lines is to prefix the route number with a "B". Or perhaps an "E" to designate "Express" or "L" to designate "Limited Stops". Prefixes like that would make it a lot more obvious which routes had what kind of services.

The possibilities are endless...
     
     
  #17227  
Old Posted Sep 23, 2017, 5:14 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by aberdeen5698 View Post
If route "C20" is a totally different thing than route "20", then all they need to do for the B-Lines is to prefix the route number with a "B". Or perhaps an "E" to designate "Express" or "L" to designate "Limited Stops". Prefixes like that would make it a lot more obvious which routes had what kind of services.

The possibilities are endless...
I mean they are transitioning away from the "C" designation, and precedent with the 90s is hard to break, but yes, this isn't really something I'd lose sleep over.
     
     
  #17228  
Old Posted Sep 24, 2017, 9:01 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,659
     
     
  #17229  
Old Posted Sep 25, 2017, 5:21 AM
supercanuck supercanuck is offline
Registered User
 
Join Date: Apr 2015
Posts: 94
Can anyone please explain to me the concept of mobility pricing? Thank you in advance.

I can understand if they say let's toll all bridges (at a price that would not stop people from travelling between communities), or even highway 1, but I don't think I can support putting trackers in every vehicle to charge you per mile driven.
     
     
  #17230  
Old Posted Sep 25, 2017, 5:48 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by supercanuck View Post
I can understand if they say let's toll all bridges (at a price that would not stop people from travelling between communities), or even highway 1, but I don't think I can support putting trackers in every vehicle to charge you per mile driven.
those are 2 ways it can be done. but you can also get it where every on-ramp and off-ramp would have gantries to charge you even if you don't go over a bridge. basically every freeway/limited access road would track who goes on and who goes off and how far it is point-to-point.

that gets very expensive to set up though with all the infrastructure requirements. more likely would be either a) all bridges to minimize capital costs. or b) an incentive to use one of those plug in trackers that would lower your ICBC rate if you're a good driver while at the same time tracking km driven in the region. option b is cheaper but if you make it mandatory; that will never fly.
     
     
  #17231  
Old Posted Sep 25, 2017, 4:34 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,723
Quote:
Originally Posted by supercanuck View Post
Can anyone please explain to me the concept of mobility pricing? Thank you in advance.

I can understand if they say let's toll all bridges (at a price that would not stop people from travelling between communities), or even highway 1, but I don't think I can support putting trackers in every vehicle to charge you per mile driven.
Here's a nice thread discussing it.
     
     
  #17232  
Old Posted Sep 26, 2017, 2:20 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by supercanuck View Post
...I don't think I can support putting trackers in every vehicle to charge you per mile driven.
You might change your mind if the pricing structure was such that the tracker was optional but ended up being cheaper in terms of the tax collected. For example, if your options were $1000/year blanket congestion charge vs. $0.01/km with a tracker.
     
     
  #17233  
Old Posted Sep 26, 2017, 2:35 AM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,659
Quote:
Originally Posted by aberdeen5698 View Post
You might change your mind if the pricing structure was such that the tracker was optional but ended up being cheaper in terms of the tax collected. For example, if your options were $1000/year blanket congestion charge vs. $0.01/km with a tracker.
I agree that distance based is magnitudes better than flat fee, especially when it comes to transit. Nobody wants to be charged for the full ride when they're only going to the next stop.
     
     
  #17234  
Old Posted Sep 27, 2017, 9:30 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,659
http://dailyhive.com/vancouver/richmond-brighouse-station-new-bus-loop

Looks like the bus loop I was talking about finally made its way to the mainstream media.
     
     
  #17235  
Old Posted Sep 27, 2017, 10:22 PM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
Quote:
construction will be finished in late 2018.
I know they have been taking their sweet ass time but wtf....
     
     
  #17236  
Old Posted Sep 27, 2017, 11:05 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,659
Quote:
Originally Posted by ilikeredheads View Post
I know they have been taking their sweet ass time but wtf....
Yeah when I saw the construction in the summer, I estimated it would be done by now or November at the latest.
     
     
  #17237  
Old Posted Sep 28, 2017, 2:04 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,093
If anyone was unlucky enough to get stuck at Stadium-Chinatown this afternoon during the switch problem, you would of been treated to Platform 3 being open to help with the backlog.
     
     
  #17238  
Old Posted Sep 28, 2017, 4:45 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by MIPS View Post
If anyone was unlucky enough to get stuck at Stadium-Chinatown this afternoon during the switch problem, you would of been treated to Platform 3 being open to help with the backlog.
pics of it didn't happen
     
     
  #17239  
Old Posted Sep 28, 2017, 5:06 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,728
Quote:
Originally Posted by VancouverOfTheFuture View Post
pics of it didn't happen
Well shot from the 3rd platform is the closest pic I found.

https://www.instagram.com/p/BZkAbb6nEzg/
     
     
  #17240  
Old Posted Sep 28, 2017, 5:14 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,093
Courtesy of CKNW

What is it with these switches that keep failing? Position sensors? The actual linkage that moves the track? I've seen so many delays that seem to fall under "switch problems" but no detailed explaination on what might be taking such a massive amount of heavy wear to cause such frequent failures.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:11 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.