HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 25, 2017, 4:08 PM
Radster Radster is offline
Registered User
 
Join Date: Oct 2007
Location: Chelsea
Posts: 997
Quote:
Originally Posted by Joseph Potvin View Post
Media Release: Morrison’s Quarry Owner Envisions MOOSE Railway Terminus
Moose Consortium Inc. (Mobilité Outaouais-Ottawa: Systèmes & Enterprises) has exchanged letters of intent with the President of Morrison’s Quarry, relating to development of a prominent 200-acre property spanning the border of La Pêche and Chelsea, Québec. The companies envision a $200 million commercial—residential—recreational development that would also serve as the northern terminus of MOOSE’s planned 400 km metropolitan-scale passenger rail network.

Read more:
https://www.letsgomoose.ca/media/

Joseph Potvin
Director General | Directeur général
Moose Consortium (Mobility Ottawa-Outaouais: Systems & Enterprises) | www.letsgomoose.com
Consortium Moose (Mobilité Outaouais-Ottawa: Systèmes & Enterprises) | www.onyvamoose.com

Another pipe dream. I live right near there, in Farm Point. Tracks on that ROW have been ripped out by now and a multi-use pathway will be span the length of that ROW, this has been embraced by most Chelsea residents, its a done deal.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:24 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.