Old Posted Sep 17, 2017, 3:09 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Norman Bates View Post
"...and have started assembling the diamond crossover at Parliament Station."

First I hear of a diamond in the system.
It says a "diamond crossover".

From Wikipedia:

Quote:
A crossover is a pair of switches that connects two parallel rail tracks, allowing a train on one track to cross over to the other. Like the switches themselves, crossovers can be described as either facing or trailing.

When two crossovers are present in opposite directions, one after the other, the four-switch configuration is called a double crossover. If the crossovers in different directions overlap to form an ×, it is dubbed a scissors crossover, scissors crossing, or just scissors; or, due to the diamond in the center, a diamond crossover. This makes for a very compact track layout at the expense of using a level junction.
I'm guessing that since the track starts to curve east of Parliament station, they needed to make the crossover as compact as possible, thus the use of a diamond crossover. Most other locations will likely use conventional double crossovers (which are stacked end to end instead of overlapping).
     
     
  #5122  
Old Posted Sep 17, 2017, 3:37 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by swimmer_spe View Post
Now, lets say a developer wants to build on adjacent land, this deck would make good parking or a nice entrance way to one of those future buildings, then it might happen. It would be paid for by the developer.
Exactly. Tunnies Pasture is a likely candidate for that. They could possibly even put the buildings partially on top of the track There is no need for the city to cap the track themselves, but for a developer, it could be worth while as it gives them more land to work with. The RendezVous LeBreton Group plan to deck over the line between Pimisi and Bayview.
     
     
  #5123  
Old Posted Sep 17, 2017, 4:12 AM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Quote:
Originally Posted by rocketphish View Post
When you view the Construction Reports in Chrome, click the "Open full screen" option, then when you right-click on each image, you'll choose "Copy link address".
I tried that. It copies the link for the construction update page and not the actual picture.
     
     
  #5124  
Old Posted Sep 17, 2017, 11:57 AM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
Quote:
Originally Posted by rocketphish View Post
Seems to me the sound wall would be more useful on the other side of the train tracks.
     
     
  #5125  
Old Posted Sep 17, 2017, 1:52 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by eltodesukane View Post
Seems to me the sound wall would be more useful on the other side of the train tracks.
VIA approached the city about doing that, but some of the residents opposed the idea. Not sure if they didn't want it that close to their property or if they liked watching the trains go by.

If VIA can get money for upgrades and electrification, the trains will be much quieter.

Here is an interesting video showing German ICE trains passing at different speeds. They seem quieter at the higher speeds, possibly because they aren't accelerating.

• Video Link
     
     
  #5126  
Old Posted Sep 17, 2017, 3:26 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by roger1818 View Post
It says a "diamond crossover".

From Wikipedia:



I'm guessing that since the track starts to curve east of Parliament station, they needed to make the crossover as compact as possible, thus the use of a diamond crossover. Most other locations will likely use conventional double crossovers (which are stacked end to end instead of overlapping).
Good Day....

indeed... diamond crossovers are generally reserved for limited space locations..... there is to be one just east of Tunney's Pasture station (under the tent) as well - same reason - tight quarters, operational flexibility. The Tunney's will also be used for the change of direction at terminus purpose until the western expansion occurs, since they seem adverse to using the Montreal Metro model of tail track switching for dedicated platform directionality. The Blair station uses two sequential switches just to the west of the station for this, since it has more linear space available. As well, diamonds have the added problem of a larger gap in the center diamond frog, causing more impact fracture damage to the wheels than regular one switch frogs, even when going very slowly. Hence it is that the Parliament diamond is only for emergency use flexibility, and the Tunney's diamond will only be used regularly until the Western expansion comes online. I do not know where the other switches and crossovers are located (except of course for Belfast MSF access and yard) since we do not have the plans. Maybe we can all contribute to a RoW survey to add them up ?

EnJoy!
     
     
  #5127  
Old Posted Sep 17, 2017, 8:18 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,697
Quote:
Originally Posted by eltodesukane View Post
Seems to me the sound wall would be more useful on the other side of the train tracks.
Yup. I think this wall will even make things worse by reflecting the sound of the noisier VIA trains back towards the houses!
     
     
  #5128  
Old Posted Sep 18, 2017, 8:32 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Here are a few from OC's twitter;


     
     
  #5129  
Old Posted Sep 21, 2017, 5:19 AM
mykl mykl is offline
Registered User
 
Join Date: Jan 2015
Location: Ottawa
Posts: 475
Took a photo of progress at Rideau Station entrance / future Scotiabank. Link because photos never work for me here.



https://imgur.com/3MzmuO9
     
     
  #5130  
Old Posted Sep 21, 2017, 10:27 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,697
Quote:
Originally Posted by mykl View Post
Took a photo of progress at Rideau Station entrance / future Scotiabank. Link because photos never work for me here.



https://imgur.com/3MzmuO9
On imgur, add ".jpg" to the address to create the direct link to the jpg. In the case of your image above the actual URL is https://i.imgur.com/3MzmuO9.jpg

using that in IMG posting results in this (I'll leave resizing tips for someone else to answer) :
     
     
  #5131  
Old Posted Sep 21, 2017, 6:19 PM
613Steve 613Steve is offline
Registered User
 
Join Date: Jun 2017
Posts: 66
     
     
  #5132  
Old Posted Sep 21, 2017, 8:55 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Here ya go.






Nice to see the train finally reaching uOttawa.
     
     
  #5133  
Old Posted Sep 21, 2017, 10:13 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Steel is going up an Tunney's Pasture station.

     
     
  #5134  
Old Posted Sep 21, 2017, 11:09 PM
613Steve 613Steve is offline
Registered User
 
Join Date: Jun 2017
Posts: 66
Thanks for the proper formatting! I'm new to this
     
     
  #5135  
Old Posted Sep 22, 2017, 1:24 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by J.OT13 View Post

Nice to see the train finally reaching uOttawa.
I was in Ottawa earlier this week for the first time since May (spent the whole summer out of the country) and I toured around the Confederation Line route.. they certainly got a lot done in the past 3 months! The entire track from Blair right up to the east tunnel portal looks basically done--tracks laid, wires put up, signals in, the whole shebang--and the fact that trains drove all the way up to uOttawa basically confirms what I saw.
     
     
  #5136  
Old Posted Sep 22, 2017, 2:04 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,097
Quote:
Originally Posted by 1overcosc View Post
I was in Ottawa earlier this week for the first time since May (spent the whole summer out of the country) and I toured around the Confederation Line route.. they certainly got a lot done in the past 3 months! The entire track from Blair right up to the east tunnel portal looks basically done--tracks laid, wires put up, signals in, the whole shebang--and the fact that trains drove all the way up to uOttawa basically confirms what I saw.
Yeah, I'm not sure why people are freaking out about the 2018 timeline. Construction is moving at a rather fast clip. Almost every weekend I'm at or near one of the station sites, and the progress at most of them, even in a span of a few days, is often startling.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #5137  
Old Posted Sep 22, 2017, 2:59 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Uhuniau View Post
Yeah, I'm not sure why people are freaking out about the 2018 timeline. Construction is moving at a rather fast clip. Almost every weekend I'm at or near one of the station sites, and the progress at most of them, even in a span of a few days, is often startling.
Agreed. It is the digging of the tunnel that was the slow part. While they were doing that, they plugged away at the other bits as there was no real rush (they wanted to get some trains running to do some early testing, but that is all they needed). Now that the digging is pretty much done, they can pick up the pace on everything else.
     
     
  #5138  
Old Posted Sep 22, 2017, 5:02 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,435
Quote:
Originally Posted by kevinbottawa View Post
Steel is going up an Tunney's Pasture station.

Yeah!

     
     
  #5139  
Old Posted Sep 22, 2017, 5:32 PM
Hybrid247 Hybrid247 is offline
Registered User
 
Join Date: Oct 2009
Posts: 1,320
     
     
  #5140  
Old Posted Sep 23, 2017, 2:47 AM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
I think Hurdman is the most impressive station on the whole line.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:17 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.