DRAPER PRISON MAKES NO SENSE because the time-frames make no sense. Amazon doesn't want to build their HQ@ in 2027. The prison needs to be built and the Draper site would need to be leveled, remediation completed and prepped. I also think there are a few elements that are flatly stated in the RFP that all of these articles are missing: the need for MASSIVE amounts of land, preferably adjacent. There are other sites in south valley or in combination with Lehi that might fit the criteria. Also, Provo/Orem could make a strong proposition from a tech perspective, although not from a cultural perspective. From the actual RFP, that none of these articles and the vast majority of speculators and quoted politicians appear to have read. My notes in
bold:
Quote:
|
Building/Site Requirements: Amazon is considering greenfield sites, infill sites, existing buildings, or a combination for the Project. If existing buildings are available that can be retrofitted/expanded within an acceptable budget and time schedule, Amazon may consider this option; however, the company acknowledges that existing buildings may not be available to meet its requirements. As such, Amazon will prioritize certified or shovel-ready greenfield sites and infill opportunities with appropriate infrastructure and ability to meet the Project’s timeline and development demands. Prison site is out.
|
Quote:
|
A development-prepped site. We want to encourage states/provinces and communities to think creatively for viable real estate options, while not negatively affecting our preferred timeline (ie timeline is a big deal)
|
Additionally, they specifically call out a need for a 100 acre greenfield site. I think this is the major thing that nobody is looking at. Amazon cannot expand any more in Seattle as there is no more land and even if there was, it's too expensive:
Quote:
Priority for Consideration (in no particular order):
Amazon will consider the following site/building categories for the Project:
1. Existing buildings of at least 500,000+ sq. ft., meeting the core requirements described above and that are expandable or have additional options for development nearby.
2. A greenfield site of approximately 100 acres certified or pad ready, with utility infrastructure in place. The sites do not have to be contiguous, but should be in proximity to each other to foster a sense of place and be pedestrian-friendly. Here is the rub! This is the deal-breaker for large cities.
|
A strikes against Provo and South Valley, and a plus for Salt Lake:
Quote:
|
Cultural Community Fit – The Project requires a compatible cultural and community environment for its long-term success. This includes the presence and support of a diverse population, excellent institutions of higher education, local government structure and elected officials eager and willing to work with the company, among other attributes. A stable and consistent business climate is important to Amazon. Please demonstrate characteristics of this in your response. We encourage testimonials from other large companies.
|
A strike against flatlander, rust belt and plains cities, a plus for western cities, especially Salt Lake and Denver and some southern cities:
Quote:
|
Community/Quality of Life – The Project requires a significant number of employees. We want to invest in a community where our employees will enjoy living, recreational opportunities, educational opportunities, and an overall high quality of life. Tell us what is unique about your community.
|
With all of the above taken in consideration, I see HQ2 selection landing in one of three types of metros in this order:
1) Tertiary/secondary and major western and southern urban markets with tech scenes, excess land near the core, good colleges, outdoor recreation and strong air access like Salt Lake, Vegas, Phoenix, Sacramento, Reno, Denver, Nashville, Memphis and Charlotte.
2) Major metro areas that still have large swaths of undeveloped land like Dallas, Houston and Atlanta. These places have quality of life issues though and piss poor recreation opportunities.
3) Rust belt cites: Detroit, Milwaukee, Pittsburgh, Cleveland.
- My sleeper pick: Minneapolis/St Paul.
- My homer pick: well DUH!
In SLC, the only parcel assemblage close to core with any where 100 acres is the Rocky Mnt Power site on North Temple. It would be an amazing fit, but there are no doubt huge environmental issues, minor zoning issues and RMP is a massive beast that moves slowly, so I'll call it a long shot, but it would be a great piece in a "split campus". It's right on Trax and a ten minute walk from the Gateway district. The other site that could be used in a split campus would be the 2200 W. corridor by the airport as there are hundreds of acres still available and shovel-ready. In concert with one of the Granary assemblages or Church owned sites, this could be the base of a strong proposal.