Received this newsletter from CA explaining their position in regards to Moodie station and after reading it I actually find it quite reasonable.
Quote:
There has been a lot of sensational reporting on what transcribed at the Fedco (financial economic development committee) meeting yesterday. Unfortunately there were a lot of false facts especially the CBC report that said "Residents of Ottawa's Crystal Beach neighbourhood are "violently opposed" to the proposed location of the Moodie LRT station and want it moved."
Ian McComnnachie who presented the CBLCA position on the station location has written the following report. Please read it and balance it against the false news that the media reported.
------------------------------------------------------------------------------------------------------------------------------------------
Update on Status of LRT to Moodie
We want to bring the community up to current speed with respect to the LRT project to Moodie and its approval process. This is of added importance given the media reports today and their rather significant deviation from reporting on what actually took place.
The Draft Environmental Project Report was presented by the Stage 2 LRT team to a committee of Ottawa City Council yesterday. The Finance and Economic Development Committee (FEDCO both received the document as well as taking a presentation on this project from city staff and hearing submissions from interested parties. Crystal Beach Lakeview Community Association was among those parties, with my submission representing the association, as well as our President, Peggy McGillivray, speaking to specific elements of the issue.
1. Where Does the CBLCA stand on location of the LRT Station?
You are aware of the results of the survey of the community that we took over the summer to gauge community preferences on a number of items related to this project. A majority of those who responded indicated a preference for a west of Moodie Drive location. That was only one of several findings from the survey. Since that survey, we have continued our efforts to learn more about the project and what is possible on issues such as locations for the station and impacts of those locations. We have known all along that each of the locations has positives and negatives. We have heard, and have chosen to accept as accurate that the Light Maintenance and Storage Facility positioned as it will be between Corkstown Rd and the 417 will cause one of two options for a west side station:
· The station on the west side would need to be where the current planned location for the LMSF with the LMSF repositioned to the south side of the 417. Estimated additional cost for this approach is about $50 Million. This money is currently unavailable to the city.
· The station would be built in a space currently occupied by Wesley Clover Parks, probably the entire segment where there is now 1 soccer pitch with plans for several other soccer pitches and volleyball courts. This would significantly undermine to goals for the Parks and is likely to be unacceptable to the NCC
With this in mind, in combination with other problematic aspects of the west side location, the Transportation Committee of CBLCA chose to accept in principle the east side location for the LRT Station as the better option. This depended, however, on obtaining from the city a list of assurances that certain conditions be met in the design, location, and construction of an East side location
2. What Have We Done to Achieve Those Conditions
The draft EPR was released last week on Thursday morning. It did not even contain a diagram of the LRT Station or its location. We received the diagram late Thursday afternoon. The document is also missing a number of important details around the station that we needed in order to accept the plan. Clearly, our preferred option was to request of the FEDCO committee to defer receipt of the document until such time as the missing pieces were filled in. We did this in the submission that I presented to committee. We knew, however, that it was unlikely for FEDCO to defer receiving of the document. A delay would create difficulties and additional costs to the project. All of these unbelievably short timelines are predicated on city contracting with construction companies involved in Stage 1 construction with immediate rollover into Stage 2. It saves the city money. As a result of our concerns and working with a Plan B, Peggy and I met with Councilor Taylor in advance of the committee meeting; I reviewed with Councilor Taylor the content of my submission and specifically the 7 conditions that we had with respect to an east side station. These conditions centre around protection of wetlands, Stillwater Creek and the greenbelt, detailed plans for connectivity of pedestrians and cyclists in the entire plan area, and a detailed traffic and safety study of the Corkstown /Moodie intersection given over 1000 buses using that intersection and 8500 DND employees, many of whom will choose to walk to DND from the station. The specific directions to city staff are as follows:
That staff continue to work with the Crystal Beach Lakeview Community to optimize all aspects of the Moodie Drive LRT station consistent with the following points:
- That a detailed traffic study of the Crosstown Rd./Moodie Drive intersection be carried out consistent with complete streets philosophy and considering both a fully occupied DND facility and the anticipated 1000 buses entering into the LRT Station on a daily basis
- That a full review of all aspects of cycling needs be carried out for the entire corridor including connectivity to Bells Corners on Moodie Drive over Highway 417
- That a raised and lighted sidewalk be installed on the North side of Corkstown Road from Crystal Beach Drive to Moodie Drive
- That an ECO design be used for the Moodie Station consistent with the greenspace location of the station and the Views and Vistas approach preferred by the NCC
- That the wildlife corridor from Holly Acres Drive to Stillwater Creek damaged and disrupted by the BRT construction be restored to its former healthy state at the time of conversion to LRT
- That optimal environmentally sound methods be utilized in construction of the Station to maximize stormwater absorption within the lands adjacent to Stillwater Creek and minimize pollutants from the Station complex
- That when LRT is extended to Kanata, every effort be made to return lands no longer required for the Station to a natural state
To his credit, with rather short time to digest the information, Councilor Taylor during the question and answer portion of the agenda item read into the record verbatim the seven “asks” of staff. In all cases, the senior staff person overseeing the LRT, Chris Swail, indicated that he had no problem with complying with those items.
3. Next Steps
The draft EPR now goes to city council next week for acceptance. It is our hope to further clarify between now and then similar inclusion of “direction to staff” on these or similarly worded points of concern. We then continue to work with city staff, who have already committed to provide to the CBLCA all update information on the LRT Station as it develops. This is clearly a long-term issue for the community. It is indeed possible that the detailed design will bring forward problems that would cause the staff to relook at the west side option. We assume also that some of their plans going forward will cause us concern and that further discussion and, if necessary, revisions would need to take place.
The CBLCA commits to you that we will do our best to keep you informed and involved as we move through this multi-year process.
Ian McConnachie
Chair, Transportation Committee
|
|