HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


Closed Thread

 
Thread Tools Display Modes
     
     
  #9741  
Old Posted Aug 29, 2017, 6:28 AM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Quote:
Originally Posted by swimmer_spe View Post
I doubt Toronto can get to the top. It has way too many projects to be done, and they need to get more bus service, and, they are simply too busy for their own good.

It is what happens when you just expand the line well beyond where it is necessary. If Toronto had not kept expanding those existing lines, there would be a DRL and an Eglinton Line.

So, when those are done, and the extensions to Richmond Hill and STC are done, it might be number 2.
Toronto's RER project is massive and a definite game changer. Then if you add up the Eglinton, Hurontario and Finch West LRTs and a future Relief Line (fingers crossed for you guys), there's definitely something that could at least bring Toronto from a C to a B+. Or an A+ If you believe that Calgary deserves an A+...
     
     
  #9742  
Old Posted Aug 29, 2017, 6:54 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by SkahHigh View Post
Toronto's RER project is massive and a definite game changer. Then if you add up the Eglinton, Hurontario and Finch West LRTs and a future Relief Line (fingers crossed for you guys), there's definitely something that could at least bring Toronto from a C to a B+. Or an A+ If you believe that Calgary deserves an A+...
Have they even started work on the RER?

Of all you listed, only Eglington is a reality. The other ones do not have shovels in the ground. By the time they get built, other cities will have stepped up their game.
     
     
  #9743  
Old Posted Aug 29, 2017, 1:14 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Quote:
Originally Posted by swimmer_spe View Post
Have they even started work on the RER?

Of all you listed, only Eglington is a reality. The other ones do not have shovels in the ground. By the time they get built, other cities will have stepped up their game.
Well, Metrolinx is starting soon on the RER I believe with significant track improvements. They just gave a technical advisory contract to Parsons and launched a RFQ for the Lakeshore East portion (source: http://www.progressiverailroading.com/pa...O-Transits-Lakeshore-East-project--52561).

Hurontario launched their RFP last week (source: http://m.railjournal.com/index.php/light-rail/rfp-issued-for-hurontario-light-rail-project.html)

Enbridge has started gas relocation along the Finch West route (source: http://www.metrolinx.com/en/projectsandp...ionprojects/finch_west_construction.aspx) and Metrolinx ordered 61 new Alstom LRVs for this project and the Hurontario one (plus added insurance in case Bombardier keeps being delayed on Eglinton).

The Relief Line is under study but indeed, nothing concrete for that project.

That's a lot more transit action than any other canadian city apart from Montreal and Edmonton.

Last edited by SkahHigh; Aug 29, 2017 at 1:41 PM.
     
     
  #9744  
Old Posted Aug 29, 2017, 1:30 PM
niwell's Avatar
niwell niwell is offline
sick transit, gloria
 
Join Date: Nov 2004
Location: Roncesvalles, Toronto
Posts: 11,608
Not to mention all the grade separation projects on the GO corridors that is a precursor to enabling RER to really happen.

Thankfully the relief line is further along in the process than it has ever been, and there does seem to be significant political capital in getting it built from all sides.
     
     
  #9745  
Old Posted Aug 31, 2017, 2:00 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,935
Well, guess who is back!

I spent 3 weeks in BC this August (back in Japan now) but I took well over a thousand photos and hundreds of video clips. I will slowly be editing through them and posting them on various threads over the next month or two.

Anyways, here is my first one completed.

I finally got to ride the Evergreen Line! (Millennium Line Evergreen Extension).

So of course I had to make a time lapse video doing so.

Here it is, please enjoy! (watch in HD)

Video Link
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #9746  
Old Posted Aug 31, 2017, 3:29 AM
Mister F Mister F is offline
Registered User
 
Join Date: Jun 2004
Posts: 2,986
Quote:
Originally Posted by niwell View Post
Not to mention all the grade separation projects on the GO corridors that is a precursor to enabling RER to really happen.

Thankfully the relief line is further along in the process than it has ever been, and there does seem to be significant political capital in getting it built from all sides.
RER isn't a single project but a series of small projects that will gradually bring service up to the desired standard. Work started a couple years ago including double and triple tracking, station expansions, grade separations, signal upgrades, etc. Service is slowly being improved as the work progresses.
     
     
  #9747  
Old Posted Aug 31, 2017, 12:07 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
RER is a massive project $25 billion allocated, and expected to take 10 years to complete. That is for those not aware, the largest transit project in Canadian history and almost 3 times the cost of the Eglinton LRT which will bisect Toronto, and will be underground through the central 11 kms.

RER will offer frequent service to Brampton/Malton/Kitchener, Markham-Stoffville, Scarborough, Mississauga-Oakville, and Pickering-Oshawa.
Yes, it is that massive. It will also be the backbone of any high-speed rail link between Toronto and Kitchener. (If that is ever built) And with electrification, more stops within the 416 are possible.
     
     
  #9748  
Old Posted Aug 31, 2017, 1:04 PM
niwell's Avatar
niwell niwell is offline
sick transit, gloria
 
Join Date: Nov 2004
Location: Roncesvalles, Toronto
Posts: 11,608
Quote:
Originally Posted by Mister F View Post
RER isn't a single project but a series of small projects that will gradually bring service up to the desired standard. Work started a couple years ago including double and triple tracking, station expansions, grade separations, signal upgrades, etc. Service is slowly being improved as the work progresses.
Yeah that's what I was getting at. It's a ton of work that doesn't have a huge immediate impact but when it all comes together will be quite impressive. Not really comparable to building a new transit line.

The scope of grade separation in the west end on the Kitchener / Barrie lines alone was an extremely massive project. Metrolinx did a pretty bad job in marketing this IMO, as a lot of people seem to think this work was done solely for the Union Pearson express. Although now that the dust has settled I've heard almost only good things about UP.
https://goo.gl/maps/HenwQv9EfTR2
https://goo.gl/maps/i9cdqgxZvcT2
https://goo.gl/maps/feDBFsMYkeR2
     
     
  #9749  
Old Posted Aug 31, 2017, 1:12 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
Quote:
Originally Posted by SkahHigh View Post
Toronto's RER project is massive and a definite game changer. Then if you add up the Eglinton, Hurontario and Finch West LRTs and a future Relief Line (fingers crossed for you guys), there's definitely something that could at least bring Toronto from a C to a B+. Or an A+ If you believe that Calgary deserves an A+...
Does it matter? Toronto at a C compared to nearly all the others at perfect and even better than perfect is pretty darn laughable. I'm most familiar with Calgary. The C train is near perfect for travellers that live close to it and are heading downtown but, the rest the services drops down very quickly.
     
     
  #9750  
Old Posted Aug 31, 2017, 1:16 PM
jigglysquishy's Avatar
jigglysquishy jigglysquishy is offline
Registered User
 
Join Date: Jul 2010
Location: Saskatchewan
Posts: 3,326
Toronto is a C, for its population.

The network of 2017 is the same as the network of 1994 (with the only growth being the Shepard line) despite Toronto growing by 2 million people.

The Toronto RT network is inadequate for a region of its size. The GTHA is what, 8 million people now? You can't rely on an RT network that is still largely the same as the one from the 70s when you've had the growth Toronto has.

The Eglington should improve massively. The relief line is the most necessary infrastructure project in the country.
     
     
  #9751  
Old Posted Aug 31, 2017, 1:29 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
I guess if you limit yourself to subway lines in the TTC coverage area (which definitely hasn't grown by 2 million) It's stupid to say transit across the GTA hasn't been greatly improved since 1994 because the subway system is the same.
     
     
  #9752  
Old Posted Aug 31, 2017, 2:56 PM
TorontoDrew's Avatar
TorontoDrew TorontoDrew is online now
Registered User
 
Join Date: Nov 2014
Posts: 10,687
Quote:
Originally Posted by jigglysquishy View Post
Toronto is a C, for its population.
The Eglington should improve massively. The relief line is the most necessary infrastructure project in the country.

That's about right. Now if only we could get some politicians with back bones to build it.
__________________
"Less is more" – Ludwig Mies van der Rohe
     
     
  #9753  
Old Posted Aug 31, 2017, 3:00 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,768
We are now seeing the biggest expansion of rapid transit in Toronto history. The fact that we are still waiting for these projects to be completed does not change this fact. Getting around the GTA on transit is going to change big time in the next 10 years. We just have to hope that we don't end up with transit-hostile governments in the meantime.
     
     
  #9754  
Old Posted Aug 31, 2017, 3:12 PM
TorontoDrew's Avatar
TorontoDrew TorontoDrew is online now
Registered User
 
Join Date: Nov 2014
Posts: 10,687
Too bad the Ford's delayed it all and reduced it in size by 4 plus years and 100's of millions of extra dollars.
__________________
"Less is more" – Ludwig Mies van der Rohe
     
     
  #9755  
Old Posted Aug 31, 2017, 4:04 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,839
The spadina extension is less than 100 days away from opening, only 3 more months. That will be a big change right there, it's the longest subway extension to open since the spadina line opened in 1978 from St George to Wilson.
     
     
  #9756  
Old Posted Aug 31, 2017, 4:46 PM
Doady's Avatar
Doady Doady is offline
Registered User
 
Join Date: Apr 2004
Posts: 5,166
Spadina extension should provide some relief for the Yonge subway, intercepting riders from the west.
     
     
  #9757  
Old Posted Aug 31, 2017, 4:50 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
I have doubts the relief with be noticeable.
     
     
  #9758  
Old Posted Aug 31, 2017, 5:02 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by WhipperSnapper View Post
I have doubts the relief with be noticeable.
The reality is that they could build multiple lines in various U shapes to ease congestion, but unfortunately, Yonge is the street a lot of those other suburbs are built around.

What is needed is a new line running down Yonge that is an express line.
     
     
  #9759  
Old Posted Aug 31, 2017, 5:52 PM
Doady's Avatar
Doady Doady is offline
Registered User
 
Join Date: Apr 2004
Posts: 5,166
A Sheppard subway extension to Spadina would provide some relief for Yonge also.

Likewise, Eglinton Crosstown LRT will mean Eglinton riders no longer dumped at Yonge.

With Pape-Don Mills subway, extended Spadina subway, united east/west corridors, maybe Yonge Express Subway wouldn't be needed anytime soon.
     
     
  #9760  
Old Posted Aug 31, 2017, 5:54 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
I agree. A huge benefit to the system would be to twin large sections if not the entirety of the Yonge line. This would also allow for 24 hour service.


Vaughan City Centre is just a little to far west for people in the Yonge/Bathurst corridor to travel "backwards". I can't see the numbers using the Yonge subway from Brampton, Concord or Woodbridge being all that significant. I'd love to see the figures if anyone has them. Most will pay a little extra and use the GO. The Barrie line is right beside Vaughan City Centre. The Vaughan subway will lose out if a station ever opens by VCC on that line.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 7:24 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.