Quote:
Originally Posted by Ziobrop
1. where did you see this?
2. halterm is not going away. period. full stop. its fairvew cove that is now constrained by the bridges, and in need of replacement. also Halterm is only 2 of the piers at the south end - the rest is the ocean terminals, and likewise, not going anywhere.
|
It's been rumored and reported in a couple local news sources. The Port Authority had the study done, so its not specific to one terminal operator. Even if it happened, I don't think it's on any near term horizon, but within the lifespan when looking at the train crossing at King's Wharf.
I think there's probably two independent things happening. The Port Authority is getting the study done so they have the backup for a big ask for Federal funding to support long term planning to defend against other regional competitors. On another path, Ceres and McQuarrie, the two operators have long been rumored to be in merger talks here as they have already merged elsewhere.
I think they should infill the finger piers at Halterm to have a long north/south pier to focus on multiple 8,000+ TEU ships, and send the smaller ones to Fairview Cove.