HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Closed Thread

 
Thread Tools Display Modes
     
     
  #5021  
Old Posted Aug 8, 2017, 4:39 PM
dougvdh dougvdh is offline
Registered User
 
Join Date: Jun 2017
Posts: 375
Quote:
So you are suggesting that instead of finding a way of effectively distributing the hundreds of thousands of people trying to leave after the fireworks on Canada Day over several stations, they should encourage everyone to walk to earlier stations in the route?
Combination of the two. Put as many trains into service as possible. But there are always going to be shortfalls and heavy peaks (end of games at Lebreton, Canada Day, etc.) In those case, spreading load is necessary and from an individual point of view, your odds of getting on improve when you go one stop up-route from the most convenient boarding point.
     
     
  #5022  
Old Posted Aug 8, 2017, 11:20 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,702
In New York City they close the stations closest to Times Square for New Year's Eve and disperse people by asking them to walk to a station according to the direction they are going. For the Canada Day evening crush, Parliament station could be closed and have Lyon for westbound passengers (with the eastbound platform closed), and Rideau for eastbound (with the westbound platform closed). If there are switches, extra trains could even be stored in one of the tracks in the tunnel
     
     
  #5023  
Old Posted Aug 12, 2017, 12:46 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,706
Waiting on a train: How Ottawa's Confederation LRT Line is taking shape around us

Matthew Pearson, Ottawa Citizen
Published on: August 12, 2017 | Last Updated: August 12, 2017 7:49 AM EDT


Through a chain-link fence I watch as a ready-mix truck backs into place and lowers its trough. A river of wet concrete flows to the pump truck and up a large robotic arm, the boom, which extends high above a square section of earth. The workers barely say a word to each other. They’ve done this so many times before they could probably do it now with their eyes closed.

I have stood on this side of the fence before, watching the Confederation LRT Line come to life.

I once walked the entire length of it, from Blair station to Tunney’s Pasture — and even swam across the Rideau River — for a series of stories dubbed Walk the Line. The goal was to see for myself all the neighbourhoods and nooks the LRT line will touch as it cuts an east-west path across the city centre once it opens in 2018.

A year later, I was curious about what had changed. How is the largest infrastructure project in Ottawa history taking shape?

Only one way to find out.



All 13 stations are active construction sites, with those in the east end — where, once again, I begin the trek at Blair station — starting to look like the transit hubs they will soon become.

The steel roofs rise up and open where the entrances will be, then bend and twist in the direction riders will ultimately go to reach the train platform.

The architect who designed them, Ritchard Brisbin, explained last year the simple concept was intended to help riders intuitively understand where they need to go.

Brisbin or members of his bbb Architects team visit stations virtually every day. He passes by Pimisi every morning and monitors its progress like a proud father. But even the proudest parent knows every child has an awkward stage.

“There were days when we were doing the convention centre that I couldn’t look at it,” he said in a recent interview. “I would wake up in the morning thinking we’ve created the world’s largest golf ball and I’m going to have to close my shop and go somewhere else.”

“You just have to squint, and try to imagine.”

Another sign of progress I spot is a train parked on the tracks near Cyrville station.

Trains are currently tested on a 1.6-kilometre stretch of line between Blair and Cyrville stations, but this fall, the testing area will extend all the way to the University of Ottawa.

The goal is to ensure all the communication and electrical systems that operate and power the trains are talking to each other, and to troubleshoot in the event they aren’t, explained Steve Cripps, the director of O-Train Construction.

Come January, track work on the remainder of the 12.5-kilometre line should be done, he said, and track testing will extend accordingly.

There was, however, one thing missing — a giant berm designed to create a grassy ridge between the sprawling Belfast Road vehicle assembly and maintenance plant and the houses in nearby Eastway Gardens.

Proudly built by Carp-based Thunderbolt Contracting, the berm was flattened in recent weeks, with heavy trucks hauling it away one load at a time.

Neighbours were aghast earlier this year when they learned the Rideau Transit Group, the city’s LRT contractor, planned to replace it with a wall as part of a $100-million expansion of the assembly plant.

They were even more peeved after city officials arrived at a public meeting in May with scant details about what the wall would look like.

The brouhaha was settled last month when residents got to vote on options for the seven-metre wall. They picked stone laminate.

If you spend much time hanging around City Hall, you’re guaranteed to hear the acronym TOD. It stands for transit-oriented development plans. Essentially, these documents express a rather simple notion: We’re spending billions on the LRT line, so let’s make sure we build up — or “intensify,” to use planner speak — the land surrounding transit stations.

Case in point: What was once a largely vacant, single-storey retail plaza to the west of Gloucester Centre is now a buzzing construction site dwarfed by a giant crane.

RioCan has begun work on a redevelopment that will be built in phases, beginning with a 30-storey, 308-unit tower located just steps away from Blair station. Future plans include two more towers.

Near Cyrville station, Richcraft Homes has already built seven condo buildings and is wrapping up work on a fourth new rental property on a large tract of land between Cyrville and Ogilvie roads. Future plans envision more towers at either end.

To transform this collection of tidy buildings into a thriving community, the large field in the centre seems like the perfect place for a small grocery store, pharmacy, café and outdoor terrace.

Not in the cards, according to Kevin Yemm, Richcraft’s vice-president of land development.

“Currently our plans are strictly residential,” he tells the Citizen.

Perhaps some commercial or office space in a tower, but that’s about it. You don’t need amenities at every stop if there are stores and restaurants close to other stations, he said. “I don’t see demand right now for adding commercial and retail uses at that location, but I could easily be proven wrong as we see more and more people move to the area.”

At least Cyrville station will have some people actually living there, which is more than I can say for Tremblay station.

The lettered streets of Eastway Gardens are about a kilometre away, the southern part of Overbrook is more than a kilometre north (across the Queensway) and, though it’s due south, the nearest reaches of Alta Vista, along Coronation Avenue, are close to two kilometres away by foot because there’s no path through Ottawa Train Yards.

Tremblay station isn’t actually located on a city street — it’s on federal land and exists primarily as a connection to Ottawa’s train station (as did the Train Transitway stop that preceded it). That explains why OC Transpo bus riders from Vanier and Overbrook will connect to the Confederation Line at Hurdman and St. Laurent stations, even if Tremblay might seem closer.

As for a link between Tremblay and the shops at Train Yards, such a thing was contemplated in 2014’s TOD plan for Tremblay, explained Alta Vista Coun. Jean Cloutier.

Planners have looked at the feasibility of pedestrian-only connections between the train station and shopping area using an existing tunnel under the VIA tracks, as well as a pedestrian and cycling bridge over the train tracks that would land between the train and LRT stations, he said in an email.

Although Cloutier says Ottawa South MP David McGuinty, the folks at Train Yards and the local community association are all “aware of and supportive of the proposal for a connection,” there’s nothing on the table yet.

Elsewhere along the line, near Pimisi station — the Algonquin word for eel, which holds a sacred significance as a source of spirituality, medicine and food stretching back thousands of years — negotiations continue between the National Capital Commission and RendezVous LeBreton to develop 21-hectares of LeBreton Flats left vacant for more than 50 years.

East of there, Trinity Developments wants to build three towers of 59, 55 and 50 storeys, and create a retail, office and residential complex at Bayview station, when the east-west and north-south train lines meet.



If you stand on the Booth Street overpass and look out over the vast construction site below, you can get a good look at the entrance to the 2.5-kilometre tunnel that runs underneath downtown.

Eastbound trains will descend into the tunnel just as the land rises to form a cliff where Queen Street ends. The line then does a straight shot underneath Queen, with stops at Lyon and Parliament stations, before curving slightly north, dipping underneath the Rideau Canal and arriving at Rideau station. After another curve, it runs underneath Waller Street and gradually emerges from the tunnel near the University of Ottawa.

Unless you work in it, the tunnel — and what goes on down there — remains something RTG and city leaders seem determined to keep under wraps (except for the new multimedia show, which I’ll get to).

After a heavy crane tipped over while lifting a small cement mixer into the eastern portal of the tunnel in April, reporters on scene watched as shaken tunnel workers were packed into a van and removed from the scene. An official from the city’s communications department was dispatched to make sure no one talked to us.

“Anything that does happen in the tunnel stays in the tunnel,” labour leader Sean McKenny said later that day.

The contractor forces workers to sign confidentiality agreements, which, in part, prevent them from speaking out about safety concerns, McKenny said.

The rush is on to make sure the $2.1-billion Confederation Line is completed next year, but city officials say safety will not be compromised to meet that deadline. (If RTG misses its May 2018 deadline for completion, the organization faces stiff financial penalties).

When I pass by on a sunny Tuesday at lunch-hour a few months after the crane kerfuffle, I chat up the worker managing traffic coming and going from the site.

The pace of work, he explains, is more manageable and controlled than it was a few months ago.

“It’s all good, not as crazy as it was,” he says with a smile and a nod.

I came to the conclusion last year that the city is doing a terrible job of telling this story of its coming of age. And my fear remains that if we don’t document who the tunnel workers are and what they have seen and felt down there, it will be lost forever.

At least now there’s Kontinuum, the $4-million, Moment Factory-produced multimedia show in the unfinished carcass of Lyon station. More than 15,000 people checked it out in the opening week and thousands more will see it before it closes in September.

And the reviews, at least judging by social media, have been enthusiastic.

“That, to me, is the best reward,” says multimedia director Yael Braha, who spent a month in Ottawa setting up the show.

As a way of showcasing the future LRT line in an original way, Kontinuum is a glittering, swirling spectacle you shouldn’t miss. Just being inside the tunnel and standing on the platform was cool enough, but when the train pulled into the station and my likeness flickered on the screen, I got a fleeting glimpse of my future self as passenger.

Writing about the ramifications of an LRT line that isn’t yet open inherently means writing about a future one can only speculate about.

How Ottawa will look and feel in a few years’ time is still coming into focus, though projects such as Zibi, the LeBreton Flats redevelopment and the new central library all suggest that what we think of as the city’s core will likely expand.

Between now and when the Confederation Line opens sometimes next year, there is much to be done on it, as well as the behind-the-scenes plans to make it smooth and reliable for thousands of OC Transpo passengers.

Yet even as Ottawans embrace the Confederation Line’s promised future, vestiges of the Transitway’s past will remain, perhaps none more visible than the pedestrian bridge over Highway 174, which connects to Blair station.

Curved roofs and red steel pipes dominate an aesthetic that hasn’t aged particularly well. But replacing the bridge — or even giving it a facelift — is not within the scope of the Confederation Line’s budget.

There’s nothing he can do about, admits Brisbin, the station architect. “Wherever possible, we’ve done our best to take it down or incorporate it or change it,” he said.

Future phases of Ottawa’s light-rail expansion may see the bridge replaced, but for now, it stands as a physical reminder of where the city has been — and where it is going.

[email protected]
twitter.com/mpearson78

http://ottawacitizen.com/news/local-news...ation-lrt-line-is-taking-shape-around-us
     
     
  #5024  
Old Posted Aug 17, 2017, 12:52 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,706
LRT health committee minutes reveal job site injuries, concerns

Jon Willing, Ottawa Citizen
Published on: August 16, 2017 | Last Updated: August 16, 2017 5:57 PM EDT


Records produced after internal safety meetings for the Confederation Line LRT reveal more about workers’ injuries and their concerns on Ottawa’s largest infrastructure project.

Seven sets of minutes from meetings held by the project’s joint health and safety committee, whose membership includes trade workers, were reviewed by the Citizen after they landed in the hands of the Ottawa and District Labour Council.

The documents include summaries of reported injuries, “near misses”, inspection orders and concerns expressed by workers on the municipality’s $2.1-billion transit job.

In a written statement, Rideau Transit Group said it couldn’t comment on internal communications, but the consortium explained that joint health and safety committees are chaired by a management representative and a union-labour certified worker representative.

“The (committees) are just one of the tools we use to work cooperatively to identify and control hazards, report and fix unsafe conditions, and establish safe work methods,” RTG said.

Minutes from a meeting in January 2017 include a note about labour ministry inspectors investigating a worker who lost consciousness while working along the old Transitway near Carruthers Avenue. Inspectors required a subcontractor to provide air monitor records, proof of confined space training for workers and safe work procedures for confined spaces.

There were descriptions of other injuries shared during that meeting, such as a worker amputating the tip of his thumb when a circular saw kicked back, a worker straining his groin while repositioning a steel beam, a worker receiving seven stitches to close a wound on an index finger from a steel burr and a worker’s ring finger crushed while repositioning equipment.

A nagging dirty washroom issue was flagged during a meeting in March 2017 when LRT officials were planning to rotate portable toilets out more often and order more units.

Several injuries were also reported during that meeting, including a worker being cut after a circular saw kicked back and a worker cutting his knee with a knife while cutting insulation at the east tunnel portal ramp.

Two reports of near misses included a subcontractor who fell while erecting a shoring tower at Hurdman station; his safety gear kicked in, preventing injury. The labour ministry was notified and RTG required the installation of fully planked platforms and guardrails to prevent it from happening again. The other near miss involved a turnbuckle fastener making contact on an electrified line, immediately cutting power to the line.

In February, a ministry inspector made 19 orders after reviewing the east tunnel portal and Rideau station. The inspector saw equipment operators not using restraining devices, a fork jammed into a key slot of a Skyjack machine and inadequate lighting at the east portal ramp.

Other potential problems came up at the March meeting: trip hazards, “unusable” washrooms, rebar ends sticking out, blocked emergency exits, no safety glasses being worn and pathways full of ice.

Attendees of another meeting in March heard about more injuries, including a subcontractor losing his grip on a piece of equipment and striking his head, putting him on modified duties. Another worker went for an x-ray after cutting his hand when it was stuck between the ground and a piece of equipment.

One participant at a May 2017 meeting noted the washrooms had improved, with the exception of the one day they were all removed at once. The scheduled cleaning day was affected by an “incident” that resulted in an evacuation, the minutes say.

Another meeting participant, who was part of a crew working on Parliament station, also noted “big improvements” on the site.

Minutes from another meeting in May 2017 highlighted a new initiative by the contractor: each safety committee member would receive a T-shirt with the motto, “One project one team. Making safety a habit.” The minutes also indicate there were 10 workers in the tunnel on modified duties at the time.

One near miss was reported at this meeting: subcontractor workers were seen using an aluminum ladder on the train tracks within an energized area.

Then, the washroom issue returned: A note in the minutes says, “Female workers won’t even use the toilets” when they’re provided by a particular supplier.

A June 2017 meeting included updates on more injuries: a worker fell while standing on a five-gallon pail (“as opposed to a work platform,” the minutes sat), and two workers received stitches on their faces — one while doing forming work and the other after he tripped and struck his chin on a guardrail. Another worker needed stitches after a grinder kicked back during pavement grinding.

One incident recorded in the June meeting ended up involving police.

On June 23, a former worker confronted and threatened another worker performing traffic control near Parliament station. The former worker had been dismissed for “acts of violence” against the other worker.

Another incident involved a five-foot-high rebar mat collapsing forward while workers were adjusting it.

In another case, a gas line was struck during excavation at the uOttawa station.

Sean McKenny, president of the Ottawa and District Labour Council, acknowledged the job sites on major construction projects can be difficult environments for workers, but he said there can’t be complacency when it comes to safety.

“Safety needs to be a priority and often it is the assumption that people are going to get hurt that, in fact, causes people to get hurt and fatalities to happen,” McKenny said.

Earlier this week in Ottawa, Ontario Labour Minister Kevin Flynn said the ministry pays particular attention to large construction sites and he has seen nothing that would suggest the Ottawa LRT site is unsafe.

McKenny called the minster’s remarks “disappointing and surprising.” He pointed to the health and safety committee minutes and incident records that would be kept by the labour ministry as proof that people are working in an “unsafe workplace.”

At the same time, McKenny was pleased to hear the ministry is paying attention to the LRT project.

“There are a number of things happening almost every day and workers are worried about their safety,” McKenny said.

RTG, which has had as many as 1,100 people working across LRT line, said workers are encouraged to bring up issues of concern and the matters are noted, validated, and followed up by the contractor and subcontractors.

“We take every report of unsafe work behaviour, near-misses, etc. very seriously,” RTG said. “We respond with timely corrective action and we identify opportunities for ongoing improvements to safety education, communication, and training. Project-wide, our lost-time injury rate has fallen from 0.32 to 0.19 over the past few months which is better than the industry average for the heavy construction industry in Ontario.”

[email protected]
twitter.com/JonathanWilling

http://ottawacitizen.com/news/local-news...inutes-reveal-job-site-injuries-concerns
     
     
  #5025  
Old Posted Aug 19, 2017, 2:32 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
What are they doing to what I assume was a ventilation shaft on the west end of St-Laurent Station, right before the line goes under the Queensway? Is that a new entrance (which would see little use) or a break room for bus drivers?
     
     
  #5026  
Old Posted Aug 19, 2017, 8:21 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by J.OT13 View Post
What are they doing to what I assume was a ventilation shaft on the west end of St-Laurent Station, right before the line goes under the Queensway? Is that a new entrance (which would see little use) or a break room for bus drivers?
I've been trying to figure that out myself... But they would still need ventillation in the tunnel, just less of it then when it was the transitway. Maybe it's just a prettier vent shaft
     
     
  #5027  
Old Posted Aug 21, 2017, 3:00 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
     
     
  #5028  
Old Posted Aug 26, 2017, 12:12 AM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,130
It's unfortunate they didn't take the opportunity to build on solar or green roofs.
     
     
  #5029  
Old Posted Aug 26, 2017, 1:05 AM
White Pine White Pine is offline
Registered User
 
Join Date: Jan 2010
Posts: 398
I saw a coupled train at blair on Wednesday. Kinda neat.
     
     
  #5030  
Old Posted Aug 26, 2017, 3:00 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day....

A nice short video : "Alltrade - Ottawa LRT on Vimeo", the contractor stringing the OCS :

https://vimeo.com/231142957

admittedly advertising, but rather good nonetheless.

EnJoy!
     
     
  #5031  
Old Posted Aug 26, 2017, 8:56 PM
Norman Bates Norman Bates is offline
Living With My Mother
 
Join Date: Feb 2009
Posts: 1,027
Quote:
Originally Posted by PHrenetic View Post
Good Day....

A nice short video : "Alltrade - Ottawa LRT on Vimeo", the contractor stringing the OCS :

https://vimeo.com/231142957

admittedly advertising, but rather good nonetheless.

EnJoy!
Great find!
     
     
  #5032  
Old Posted Aug 26, 2017, 9:58 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by White Pine View Post
I saw a coupled train at blair on Wednesday. Kinda neat.
I've seen lots of trains around blair, but never a coupled pair. Since that's how they'll run normally hope to see it myself.
     
     
  #5033  
Old Posted Aug 28, 2017, 2:19 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by kmcamp View Post
I've seen lots of trains around blair, but never a coupled pair. Since that's how they'll run normally hope to see it myself.
How normal will it be? Obviously during peak periods they will run this way. They may also continue like that midday to save the effort of coupling and uncoupling trains. I suspect during the late evening and on weekends, they will run as single trains though.
     
     
  #5034  
Old Posted Aug 28, 2017, 5:26 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by roger1818 View Post
How normal will it be? Obviously during peak periods they will run this way. They may also continue like that midday to save the effort of coupling and uncoupling trains. I suspect during the late evening and on weekends, they will run as single trains though.
I read that the plan was exactly as you say, to run as coupled pairs on weekdays throughout the day, and as single units late night and weekends. I suppose it really depends on how busy the line ends up being though.
     
     
  #5035  
Old Posted Aug 28, 2017, 6:28 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by kmcamp View Post
I read that the plan was exactly as you say, to run as coupled pairs on weekdays throughout the day, and as single units late night and weekends. I suppose it really depends on how busy the line ends up being though.
Good Day....

....and on the ease / difficulty / length-of-time-of-effort involved in coupling / uncoupling.
This was a catch I spotted in the early proposals of this idea, and is similar to what had originally been proposed for the Montreal Metro. They gave it up quickly given the difficulty, effort, and time-of-effort to do so, and ran selected lengths on selected lines (subject to demand, constantly re-evaluated) all day long.
If, as is rumoured / reported, the process is fast and easy, both physically and in the controller computers, then they may do so. It would provide flexibility and reduce maintenance and costs, but they had better have a way of informing those waiting on the platforms to expect a short train, or suffer the resultant justified complaints.

We Shall See !
     
     
  #5036  
Old Posted Aug 28, 2017, 7:58 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,130
Now that I see pics of the trainset, anybody else think they could have picked a better paintjob? Looks rather bland and utilitarian to me.

Admittedly not the most pressing issue though.
     
     
  #5037  
Old Posted Aug 28, 2017, 8:10 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Truenorth00 View Post
Now that I see pics of the trainset, anybody else think they could have picked a better paintjob? Looks rather bland and utilitarian to me.

Admittedly not the most pressing issue though.
Well, to be honest none of the pics (nor trains that I've seen with my own eyes) show the finished product. They always have panels missing and don't have the complete paint job yet.

I know they have some actual finished trains, and you can see one bits and pieces of one in the background of one of the "ready for rail" videos, but I haven't seen it in full view yet.
     
     
  #5038  
Old Posted Aug 28, 2017, 8:44 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by kmcamp View Post
Well, to be honest none of the pics (nor trains that I've seen with my own eyes) show the finished product. They always have panels missing and don't have the complete paint job yet.

I know they have some actual finished trains, and you can see one bits and pieces of one in the background of one of the "ready for rail" videos, but I haven't seen it in full view yet.
Here is a picture of a mostly completed train that I found online from Alstom:

     
     
  #5039  
Old Posted Aug 28, 2017, 11:53 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by roger1818 View Post
Here is a picture of a mostly completed train that I found online from Alstom:

That looks nice. Why do you need the trains to stand out? The TTC subway cars are not even painted.
     
     
  #5040  
Old Posted Aug 29, 2017, 3:10 AM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,984
Yea...their was never a huge thing around painting the TTC subway cars. The new ones or the 20 year old ones...their both made of a silver metal skin and they travel underground nearly all the ways they travel....it may be a bit redundant, especially if people complained that the cars needed cleaning because any dust would stand out more than just greyed silver. However, the original 50's subways cars were a brilliant red, but then again the technology from then to nowadays isn't necessarily the same.

The TTC has some new streetcars that are white and red, going back on traditional TTC colours.....

Anyways, I gotta say those streetcars look pretty nice for Ottawa....their highly reminiscent of the Skytrain design, especially with the swish of colour from the side, but with a poppy and effective white and red theme that works well for Ottawa, seeing as it's the capital and all.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 8:26 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.