Originally Posted by Pemgin
Where does Eviva stand with its permits?
|
Their land development permit has been ready to issue since July 2015. So, technically, nothing is stopping them from getting started immediately on site preparation and infrastructure work. They just have to pay the fees and get the permit issued.
They would have to file a new building permit, however, for vertical construction as the previous one they filed was terminated about a year ago. This may have been a result of the alterations that were made to the building from what was originally planned.