HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Aug 16, 2017, 7:12 PM
M00dy M00dy is offline
Registered User
 
Join Date: Nov 2016
Posts: 136
Quote:
Originally Posted by moosejaw View Post
If the canada line can climb the north arm bridge which is exactly as high as the tunnel is deep, tell me why it wouldn't it be able to make the climb?
It wont need tons of maintenance if only lrt or rapid bus traffic use it. Its illequipeed to handle 80k cars/trucks daily. But should stand up a long time for rapid transit use.

Im not saying run skytrain through there but at least explore the possibility for future usage.

Any form of rapid transit outside of bus service wont make the climb of the new crossing
The height of the crossing isn't the concern - what matters is grade. The north arm bridge was designed for the Canada line so the track grade approaching it was designed according to the train requirements. Canada line ~2% max & rest of the system 6% max IIRC.

The existing massey tunnel isn't designed for a train, it's designed for vehicles & the grade would be in accordance with that. I don't know what it is exactly, but it's certainly well over 2%
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:15 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.