HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley


Reply

 
Thread Tools Display Modes
     
     
  #61  
Old Posted Aug 5, 2017, 2:37 AM
Nites Nites is offline
Registered User
 
Join Date: Jan 2008
Location: Surrey, BC
Posts: 1,558
Quote:
Originally Posted by Shift View Post
Yeah 100 feet taller than Civic Plaza. Feel like Civic Plaza's design is more fitting for the taller tower of the 2.

Thread title also still says 50 fl for this. Needs to be updated to 55
Notified the moderator.

Do you by any chance know the project number for this tower?
Reply With Quote
     
     
  #62  
Old Posted Aug 5, 2017, 7:34 AM
Whalleyboy's Avatar
Whalleyboy Whalleyboy is offline
Registered User
 
Join Date: Jul 2008
Location: Surrey
Posts: 2,014
At that close they should just push add a few extra floors and just make it the tallest
Reply With Quote
     
     
  #63  
Old Posted Aug 6, 2017, 3:20 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Set title to 55 floors. Sorry about the delay.
Reply With Quote
     
     
  #64  
Old Posted Aug 6, 2017, 7:17 PM
Cypherus's Avatar
Cypherus Cypherus is offline
Registered User
 
Join Date: Jan 2007
Location: Surrey
Posts: 1,759
Really excited for this development and how fast it will move forward to development. Also liking the rectangular slab design (with a skinny tower look from the side). Interestingly Urban Village phase 5 tower and The Hub is also a rectangular slab design so it may be a Surrey thing.
Reply With Quote
     
     
  #65  
Old Posted Aug 7, 2017, 12:06 AM
Nites Nites is offline
Registered User
 
Join Date: Jan 2008
Location: Surrey, BC
Posts: 1,558
Quote:
Originally Posted by red-paladin View Post
Set title to 55 floors. Sorry about the delay.
Thanks.
Reply With Quote
     
     
  #66  
Old Posted Aug 7, 2017, 1:26 AM
CoryHolmes CoryHolmes is offline
Registered User
 
Join Date: Sep 2008
Posts: 1,031
Quote:
Originally Posted by Cypherus View Post
Really excited for this development and how fast it will move forward to development. Also liking the rectangular slab design (with a skinny tower look from the side). Interestingly Urban Village phase 5 tower and The Hub is also a rectangular slab design so it may be a Surrey thing.
Ironically, I think this is why I prefer the Wave design. It's not your standard concrete rectangle, and (usability of the balcony space aside) it's quite pleasant to look at.
Reply With Quote
     
     
  #67  
Old Posted Aug 7, 2017, 3:20 AM
ryanmaccdn ryanmaccdn is offline
Registered User
 
Join Date: Sep 2008
Posts: 343
I hope the developer realizes they will need 10+ elevators. Given it's purpose is education, a majority of it's tenants will be students who move around alot at very small specific periods.

Here at RMIT Melbourne we have 8 industrial elevators for 13 floors and it's a struggle.
Reply With Quote
     
     
  #68  
Old Posted Aug 7, 2017, 8:32 AM
towerseeker101 towerseeker101 is offline
Registered User
 
Join Date: Oct 2016
Location: Burnaby
Posts: 136
The new buildings in Surrey seem to have nicer architecture than in Burnaby (Brentwood in particular).
Reply With Quote
     
     
  #69  
Old Posted Aug 7, 2017, 10:17 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
Quote:
Originally Posted by ryanmaccdn View Post
I hope the developer realizes they will need 10+ elevators. Given it's purpose is education, a majority of it's tenants will be students who move around alot at very small specific periods.

Here at RMIT Melbourne we have 8 industrial elevators for 13 floors and it's a struggle.
Yeah... while I'm impressed with the height of the building, it also worries me for this exact same reason. Unless the schools all coordinate among themselves (and with twenty of them, this is unlikely), there's going to be a lot of students trying to cram into the elevators to meet class start and end times.
Reply With Quote
     
     
  #70  
Old Posted Aug 7, 2017, 6:13 PM
dleung's Avatar
dleung dleung is offline
Registered User
 
Join Date: Nov 2009
Location: Toronto
Posts: 6,554
Quote:
Originally Posted by osirisboy View Post
It reminds me of the podium of modello. If they can do it like that it'll look really good
You can't just supersize the modello podium texture onto a tower that has other elements. Prefer the old version too
Reply With Quote
     
     
  #71  
Old Posted Aug 7, 2017, 11:50 PM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,964
Quote:
Originally Posted by Millennium2002 View Post
Yeah... while I'm impressed with the height of the building, it also worries me for this exact same reason. Unless the schools all coordinate among themselves (and with twenty of them, this is unlikely), there's going to be a lot of students trying to cram into the elevators to meet class start and end times.
That's a very good point that I never thought of that.

I think that there could be a way to organize the elevators so that this can be executed seamlessly.

For example, have two industrial-grade elevators servicing the colleges; one would be designated for the upper floors, the other would be designated for the lower floors.

Then have two more industrial-grade elevators servicing the residences; again one would be designated for the upper floors, and the other would be designated for the lower floors. And then there would be regular elevators providing service for all floors inbetween. Would something like this be feasible?

Another idea of mine would be to have by-laws in place that limit what time the colleges start and end at. For example, College #1's class begins at 8:15am - 11:30am then resume at 12:00pm until 4:30pm; and then college #2 could have different start and end times, to try and reduce the amount of traffic trying to access the elevators at one time.

Also we can keep in mind that these are students so they are also likely to take the stairs from their college to the ground level.

This is just food for thought.

Last edited by scryer; Aug 8, 2017 at 3:28 AM.
Reply With Quote
     
     
  #72  
Old Posted Aug 8, 2017, 10:27 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,712
I would expect the podium to have large staircases for the 5 institutional floors.
As for a morning rush hour of students riding down to the classrooms, there would probably be delays - maybe tempered by students trickling into a podium cafeteria before classes then taking stairs to the classrooms.
Reply With Quote
     
     
  #73  
Old Posted Aug 10, 2017, 1:51 AM
Nites Nites is offline
Registered User
 
Join Date: Jan 2008
Location: Surrey, BC
Posts: 1,558
Quote:
Originally Posted by officedweller View Post
I would expect the podium to have large staircases for the 5 institutional floors.
As for a morning rush hour of students riding down to the classrooms, there would probably be delays - maybe tempered by students trickling into a podium cafeteria before classes then taking stairs to the classrooms.
They should have separate elevators for the podium.
Reply With Quote
     
     
  #74  
Old Posted Aug 10, 2017, 4:38 AM
Hooknose Hooknose is offline
Registered User
 
Join Date: Mar 2017
Posts: 248
What is the FSR

Does anyone know the floor space ratio of this proposal?
Reply With Quote
     
     
  #75  
Old Posted Aug 13, 2017, 5:49 AM
Nites Nites is offline
Registered User
 
Join Date: Jan 2008
Location: Surrey, BC
Posts: 1,558
Quote:
Originally Posted by Hooknose View Post
Does anyone know the floor space ratio of this proposal?
As far as I know, official drawings have not been submitted yet for this proposal.
Reply With Quote
     
     
  #76  
Old Posted Aug 13, 2017, 7:21 AM
Marshal Marshal is offline
perhaps . . .
 
Join Date: Dec 2015
Location: Vancouver
Posts: 1,493
Quote:
Originally Posted by Millennium2002 View Post
Yeah... while I'm impressed with the height of the building, it also worries me for this exact same reason. Unless the schools all coordinate among themselves (and with twenty of them, this is unlikely), there's going to be a lot of students trying to cram into the elevators to meet class start and end times.
I'm not going to say that this will take care of this issue, but it should. The building code and fire codes have formulae for the size of the area required for egress which are based on categories of use. Assembly and schools are at the very high end. This should be non-negotiable, but I know so many examples that don't satisfy the requirements that I no longer trust the policing of it. Our firm has never been asked (by owner/developer) to try to negotiate this requirement downward, and we would protest if we were, but this may be yet another thing that municipal governments are not doing properly.
Reply With Quote
     
     
  #77  
Old Posted Aug 13, 2017, 7:31 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,705
Surrey civic news says only floors 3-6 will be used by the schools?

https://urbansurrey.com/2017/04/07/devel...ted-for-50-storey-education-mega-centre/
Reply With Quote
     
     
  #78  
Old Posted Aug 14, 2017, 4:19 AM
BodomReaper BodomReaper is offline
Registered User
 
Join Date: Jul 2010
Location: Metro Vancouver
Posts: 987
Quote:
Originally Posted by Marshal View Post
I'm not going to say that this will take care of this issue, but it should. The building code and fire codes have formulae for the size of the area required for egress which are based on categories of use. Assembly and schools are at the very high end. This should be non-negotiable, but I know so many examples that don't satisfy the requirements that I no longer trust the policing of it. Our firm has never been asked (by owner/developer) to try to negotiate this requirement downward, and we would protest if we were, but this may be yet another thing that municipal governments are not doing properly.
Interesting stuff. Is that how we get 30+ storey, 200+ unit towers (Aviara and Plaza 88 come to mind) with only 2 elevators? Standards that aren't actually enforced?
Reply With Quote
     
     
  #79  
Old Posted Aug 14, 2017, 7:45 AM
Marshal Marshal is offline
perhaps . . .
 
Join Date: Dec 2015
Location: Vancouver
Posts: 1,493
Quote:
Originally Posted by BodomReaper View Post
Interesting stuff. Is that how we get 30+ storey, 200+ unit towers (Aviara and Plaza 88 come to mind) with only 2 elevators? Standards that aren't actually enforced?
Another aspect is the differences between calculating capacity for 'everyday' circulation and that required for egress (safety). As one would expect, egress requirements are more tightly defined, but, in the context of this discussion, it needs to be understood that elevators do not figure with regard to egress; only fully separated stairs and the hallways that link them to occupied spaces. Also, the egress capacity of both elements is derived from a one way full on evacuation. Egress widths rarely satisfy normal circulation needs. There is nothing like the interpretation of the building code - including its legal and building inspection (of construction) aspects.
Reply With Quote
     
     
  #80  
Old Posted Aug 14, 2017, 6:03 PM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
Quote:
Originally Posted by Hooknose View Post
Does anyone know the floor space ratio of this proposal?
12.23 FAR on gross site area as per Design Panel minutes.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 7:27 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.