Quote:
Originally Posted by acottawa
I wonder how long the CN service would last, certainly east of Kingston, without the Toronto-Ottawa-Montreal traffic.
|
Can be made to work. Not in the current form of 6 car trains. More than likely you have 2 or 3 car DMUs. And Kingston becomes a hub with 3 services terminating there:
Toronto-Kingston
Montreal-Kingston
Ottawa-Kingston
Once you place a hub at Kingston and decouple Toronto-Kingston from Montreal-Kingston and Ottawa-Kingston, you'll actually improve reliability. And since fewer passengers will be transferring in Kingston, slippage here or there (due to CN traffic) will impact far fewer riders overall.
Probably 2-car DMUs and no business class I figure. Or maybe a split wit 3-car DMUs on Toronto-Kingston and 2-car DMUs on Montreal-Kingston and Ottawa-Kingston. DMUs are perfect for sparsely populated regions like so many in our country. Something like this:
https://en.wikipedia.org/wiki/Diesel_multiple_unit#/media/File:SA_134-012_Brzeg_27.03.2009.jpg
Or this:
https://upload.wikimedia.org/wikipedia/commons/b/b2/Pesa_-_ATR220.019_a_Nard%C3%B2.jpg
A great example from Australia:
https://www.youtube.com/watch?v=X5wnmkTQF2A
https://en.wikipedia.org/wiki/Transwa_WDA/WDB/WDC_class
Also, these services will be far cheaper to run, while possibly even allowing for a boost in frequencies from today:
Toronto-Kingston (13 trips)
Montreal-Kingston (11 trips)
Ottawa-Kingston (9 trips)
Perhaps smaller trains might also help with siding construction to allow for better operating efficiency.