Construction is progressing for the replacement of the Montroyal Road bridge. The old bridge was fast-tracked for replacement last year; the new structure will have two lanes (as with the old one) along with sidewalks on both sides and bike lanes.
New retaining wall on the northern side of Montroyal (west of the bridge):
Western end of the temporary bridge:
Existing bridge and the temporary bypass:
Eastern end of the temporary bridge: