NAC reno: A new, softer face replaces brutalist brow just in time for Canada Day

Matthew Pearson, Ottawa Citizen
Published on: May 26, 2017 | Last Updated: May 26, 2017 5:27 PM EDT




Donald Schmitt’s task wasn’t easy: Take another architect’s signature building, loved and loathed in equal measure, and give it a softer, modern face that welcomes people in a way its furrowed brutalist brow never has before.

And finish the job in time for a splashy grand opening on Canada Day 2017, the pinnacle of celebrations marking the 150th anniversary of Confederation.

“It’s an extraordinary opportunity,” the architect said this week after an hour-long tour of the National Arts Centre, where he is presiding over its bold, $110.5-million architectural rejuvenation.

As machines beeped and screeched in the background, Schmitt and project architect Jennifer Mallard pulled back the curtain on the bustling construction site where dozens of workers buzzed with the certainty of a ticking clock.

Schmitt’s Toronto-based firm, Diamond Schmitt Architects, has added new layers on three sides of the building, all linked by a glass tower across from the National War Memorial that acts as a new public entrance. The tower’s hexagonal shape is one of several nods to the geometric order that defined the art centre’s original design. (The pattern of repeating equilateral triangles in the Douglas fir ceiling panels throughout is another.)

Referred to as the lantern, four sides of the tower are clad in glass that’s enabled with LED technology so it can transform into a giant digital screen and livestream events from inside the building or across the country.

There’s also a new lobby off Elgin Street, a rebuilt Fourth Stage (with a much higher ceiling) and Panorama Room (with double the capacity), an education room for school groups, and several new spaces for casual concerts, pre- or post-show talks, community events and corporate meetings.

Mallard pointed out the quarried stone from Owen Sound, Ont., that’s being used for the lobby floor, while high above are the laminated timber coffers, which were prefabricated at a shop in Chesterville to save time. (Production of the coffers occurred concurrently with demolition activities at the site.)

The addition basically grows out of foundations that have existed since the building, designed by Polish architect Fred Lebensold, opened in 1969. The team used cues from the original building to guide the addition, but emphasized light and transparency instead of opacity and heaviness, Mallard explained.

Modern touches include a new coffee shop in the lobby, free Wi-Fi throughout the building and natural light at every turn.

What Schmitt has created is antithetical to Lebensold’s brutalist, fortress-like building that, since the day it opened, has turned its back to the city. Yet he’s done it out of reverence for the original, he says. It’s important to understand a building’s strengths and weaknesses, but not be afraid to make changes.

“I love this building, I think it’s a stunning building,” he said. “But it’s a building that architects love more than the general public or the people who work in (it).

“Should performing arts be in a fortress? I don’t think so. It should reach out.”

The NAC will reopen in three phases.

Visitors on Canada Day can use the new, fully accessible Elgin Street entrance, visit the relocated box office and new washrooms, and catch their breath in the sunny lower atrium.

This fall, the atrium’s second floor, including several new performance and event spaces with tremendous views of iconic capital buildings, will open, as well as the transformed Fourth Stage.

The expanded Panorama Room, overlooking the Rideau Canal, reopens next February.

Meanwhile, the $114.9-million upgrade of production equipment, from sound and lights to projection, acoustics and those plushy new seats in Southam Hall, is to be completed in 2019, just in time for the NAC’s 50th anniversary.

Future plans could include new landscaping and an outdoor amphitheatre to the north of the building and expanded rehearsal and production space on the south side along Mackenzie King Bridge.

Schmitt’s interventions are controlled and proportional, “but the impact is huge,” he said.

The original building is 1.1 million square feet; the new and renovated spaces measure about 78,000 square feet.

But regardless of the project’s scope, architecture is a public art: everyone sees it and has an opinion about it. Given the NAC’s prominence — both in location and mandate as the national stage for performing arts — failure is not an option.

“Everybody who comes to Ottawa will see this building, so there’s a certain pressure to get it right,” Schmitt said.

The architect was to fly to Oman later that day to visit another project, but will be back in Ottawa for the NAC’s official opening on July 1, when 150 people, including architects, construction workers and NAC staff members, will cut the ribbon.

[email protected]
twitter.com/mpearson78


NEW NATIONAL ARTS CENTRE, BY THE NUMBERS

$225.4, cost of NAC renovations, in millions of dollars. This includes $110.5 million for the architectural rejuvenation and $114.9 million for the renewal of performance venues, to be completed by 2019
200, highest number of construction contractors working during one day on the NAC at the height of the project
80, number of women’s washrooms at the NAC after construction (compared to 21 before construction)
68, number of men’s washrooms at the NAC after construction (compared to 26 before construction)
500,000, estimated number of person hours working on renovation project by end of 2017
01/07/17, the day the first phase of the NAC opens to the public (New Elgin Street entrance, box office, part of atrium)

Source: National Arts Centre

http://ottawacitizen.com/news/local-news...utalist-brow-just-in-time-for-canada-day
Reply With Quote
     
     
  #162  
Old Posted Jun 4, 2017, 5:47 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,702
That opaque mass of drywall inside the tower just does not look right.

Reply With Quote
     
     
  #163  
Old Posted Jun 5, 2017, 11:36 AM
jimmyjones jimmyjones is offline
Registered User
 
Join Date: Nov 2012
Posts: 70
The other side is looking pretty nice too!

Reply With Quote
     
     
  #164  
Old Posted Jun 5, 2017, 8:09 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
I figure the drywall is probably temporary until the entire structure is open.

So far very impressed with the expansion. Looks better than the renderings, and that is a rare feat!

In other news, the lantern is to be named the Kipnes Lantern.

Quote:
Elgin Street's newest landmark named for $5M NAC donors

BY MATTHEW PEARSON
FIRST POSTED: MONDAY, JUNE 05, 2017 03:30 PM EDT | UPDATED: MONDAY, JUNE 05, 2017 03:36 PM EDT


The signature element of the National Art’s Centre’s $110.5-million facelift will be named the Kipnes Lantern after an Edmonton couple gave $5 million to the arts organization.

The hexagonal lantern faces the National War Memorial and will serve as the centre’s new Elgin Street entrance. Four sides will be clad in glass that’s enabled with LED technology so it can transform into a giant digital screen and livestream events from inside the building or across the country.

Dianne Kipnes, a clinical psychologist, served as a director of the NAC Foundation for nearly a decade. She and her husband, a businessman and developer, have made other gifts to the arts, health care, education and social services over the years.

The couple “represent the very best of Canada,” NAC president and CEO Peter Herrndorf said in a release.

Another $5-million donation from the foundations’s former chair, Gail Asper, and her husband, Michael Paterson, will see the NAC Theatre renamed as the Babs Asper Theatre, in honour of Asper’s late mother.


Although physical spaces are being named to recognize donors, NAC Foundation CEO Jayne Watson said their money is not for capital improvements.

The money for the NAC’s architectural rejuvenation and the $114.9 million for production upgrades all came from the federal government.

Cash collected from donors as part of the Creation Campaign will be used as venture capital to provide artists and arts organizations the time and resources needed to produce new Canadian works in theatre, music and dance for NAC stages and others across the country, Watson said. The fund will begin accepting applications this fall.

Encount3rs, which had its world premiere in April, is an example of the creative work the fund will aim to produce. For it, choreographers from Ballet B.C., Alberta Ballet and the National Ballet of Canada were paired with composers to create three one-act ballets.

“That kind of project is the example of bold, visionary, multi-disciplinary art that the Creation Fund is going to be investing in,” Watson said.

In addition to the lantern and NAC Theatre, several other new and existing spaces will be named after donors, including:

  • Jenepher Hooper prop shop: The estate of the late Hooper, who worked in the NAC’s prop shop in the early 1970s and died in 2015, gave $2.5 million to support education programs in English and French theatre, as well as the Indigenous Theatre Department, which will present its first season in 2019.
  • Azrieli Studio: A $2-million gift from the Azrieli Foundation will see the NAC Studio renamed. The Toronto-based foundation supports music and the arts, scientific and medical research, architecture, higher education, Holocaust education and quality of life initiatives for people with developmental disabilities.
  • Janice and Earle O’Born Room: A $1.5-million gift from the O’Borns (Janice currently serves as chair of the NAC Foundation) will see a new room of the building’s north side named after the Toronto couple. Boasting impressive views of the Rideau Canal, Chateau Laurier and Parliament Buildings, the room will be used for entertaining, rentals and hospitality purposes.
  • Atrium Gail and David O’Brien: A $1.5-million gift from this Calgary couple will see the atrium that links the new Elgin Street entrance to the existing Southam Hall mezzanine named for them.
  • Alan and Roula Rossy Pavilion: A $1-million gift will see a new programming space overlooking Elgin Street named for this Montreal couple (Alan Rossy is a NAC Foundation board member from Montreal).
  • Susan Glass and Arni Thorstseinson Staircase: A $1-million gift will see the new bleacher staircase linking the Elgin Street and terrace levels, which will also be used for informal pre- or post-show talks, named for this Winnipeg couple. Glass is vice-chair of the NAC board of trustees.
  • Ruddy Lounge: The NAC Foundation’s donor lounge, located in the main foyer, will be named for John and Jennifer Ruddy after the Ottawa couple donated $1 million. Ruddy owns Trinity Development
  • Yulanda M. Faris Stage: A $1-million gift will see a new performance stage on the same level as the new Elgin entrance be named in honour of the late Faris, a former NAC trustee from Vancouver. Free public performances will be held on this stage.
  • Atelier Belle Shenkman and Desmond Smith: A new room created for school groups to gather pre- and post-performances will be named for this couple, after a six-figure donation from Shenkman’s daughter, Dasha Shenkman.

The NAC will reopen in three phases.

Visitors on Canada Day can use the new, fully accessible Elgin Street entrance, visit the relocated box office and new washrooms, and catch their breath in the sunny lower atrium.

This fall, the atrium’s second floor, including several new performance and event spaces with tremendous views of iconic capital buildings, will open, as well as the transformed Fourth Stage.

An expanded banquet room overlooking the Rideau Canal reopens next February.

[email protected]

twitter.com/mpearson78
http://www.ottawasun.com/2017/06/05/elgin-streets-newest-landmark-named-for-5m-nac-donors
Reply With Quote
     
     
  #165  
Old Posted Jun 28, 2017, 11:24 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,705
Brutal no more: NAC offers a sneak peak inside a light-filled 'architectural rejuvenation'

Joanne Laucius, Ottawa Citizen
Published on: June 28, 2017 | Last Updated: June 28, 2017 7:02 PM EDT


The NAC is throwing open its doors to the public on Canada Day to offer a look at the first phase of a project aimed at turning Ottawa’s fortress-like performing arts palace into a light-filled “crossroads” for the city. On Thursday, the media got a sneak peek.

Built as a centennial project, the NAC was designed in the “brutalist” style popular from the ’50s into the ’70s. The word originates from the French “béton brut” or raw concrete, the material of choice for architects working in this style. Essentially, the NAC was built to be a fortress for the performing arts.

But the way people use public buildings has changed since 1967.

Architect Donald Schmidtt considers his firm to be “marriage brokers” of architecture, taking the best qualities of the existing building and making it more transparent and inviting. “Both parts bring out the best in each other,” he said.

Fifty years ago, brutalism had fans in architecture circles. And it still has, says Schmidtt. But the general public found massive concrete walls alienating. The NAC took its share of criticism for a design that turned its back on Elgin Street and views of Ottawa’s most iconic buildings. The design sometimes left patrons struggling to find a door.

Schmidtt’s task was to animate Confederation Square, to embrace the War Memorial and to open up sightlines to Ottawa landmarks, including Parliament Hill and the Château Laurier. And to do it on time and one budget.

“It was a time in architecture history where architects were seeking truth, a robust massing and a fortress-like architecture,” said Schmitt, whose firm has designed more than 40 performing arts spaces, including a current project on David Geffen Hall at the Lincoln Center in New York City.

“These qualities can be completely hostile to the way people use buildings. People saw it as a bunker that was unwelcoming and unfriendly.”

The ribbon will be cut on Saturday by Charles, Prince of Wales, a notable foe of brutalist architecture. In 1988, the heir to the throne described Birmingham’s 1974 library designed by John Madin as “a place where books are incinerated, not kept.” In 1984, he called a proposed extension to the National Gallery in London a “monstrous carbuncle on the face of a much-loved and elegant friend.”

The NAC will be open to the public starting at about 3 p.m. Saturday after the ribbon-cutting, with free performances and activities that will continue on Sunday.

The rejuvenation project has two more phases yet to be complete and will wrap up next February. At a cost of $110.5 million, it’s the federal government’s largest investment in cultural infrastructure for the Canada 150 celebrations. When complete, there will be 60,000 square feet of new space.

Canada Day will mark the opening of the Elgin Street Entrance, the box office and part of the atrium. Here’s what to look for:
  • The tower on Elgin Street will mark the entrance and the point of arrival in the NAC. It will also take its place as one of the most important towers in Ottawa, marking the location of Ottawa’s first city hall and a relationship between the Peace Tower, which presents the Crown, and the City of Ottawa. Four of the eight sides of the “lantern” in the tower are digitally enabled with LED screens to showcase events at the NAC or around the world. There are strict rules about light levels and content, but the NAC’s new “marquee” will be visible from the new LRT station on Queen Street.
  • Look up. Look waaay up. The new atrium showcases wood as an innovative Canadian product. The Douglas fir in the coffered ceilings was chosen for its structural properties and was manufactured by Structurecraft in Vancouver. It was prefabricated off-site last summer in a warehouse in Chesterville, south of Ottawa. The longest span measures 20 metres, and the coffers are equipped with electrical conduits, lights and sprinklers. There are 246 wood coffers in the atrium and a curtain wall almost twice the size of an NHL hockey rink. Schmidtt says the space was designed to be filled with light. “The luminosity will showcase what’s here.”
  • The NAC is meant to be accessible to the public 17 hours a day. Schmidtt wanted to create a “living room in the city,” a place where visitors can stop for a coffee — there will be a coffee shop just inside the Elgin Street entrance, plus mobile bars — to use the free Wi-Fi, or catch a free performance or lecture on the wooden steps in the atrium.
  • Keep an eye out for the hexagons, a repeating motif in the original NAC, that has been continued in the expansion project, from tiles in the washrooms to the stone floors in the Elgin entrance and the lower box office. The limestone floors, quarried in Owen Sound, are made of triangles pieced together to form hexagons. Why hexagons? Project architect Jennifer Mallard says triangles were a common architectural theme at the time the NAC was built. “The original language of the building was so very strong, that to work with it was both inspiring and a challenge.”
  • The project will triple the number of public washrooms in the NAC. Before the expansion there were 21 women’s washrooms and 26 men’s washrooms. After construction, there will be 80 women’s washrooms, 68 men’s washrooms, and four universal washrooms.

http://ottawacitizen.com/news/local-news...-light-filled-architectural-rejuvenation
Reply With Quote
     
     
  #166  
Old Posted Jun 29, 2017, 12:40 AM
Mikeed Mikeed is offline
Registered User
 
Join Date: Jun 2013
Posts: 377
First look at the NAC Lantern in action:

https://streamable.com/d42so
Reply With Quote
     
     
  #167  
Old Posted Jun 29, 2017, 1:06 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,705
Quote:
Originally Posted by Mikeed View Post
First look at the NAC Lantern in action:

https://streamable.com/d42so
That's pretty darn cool (the technology, not those particular images so much)
Reply With Quote
     
     
  #168  
Old Posted Jun 29, 2017, 7:23 AM
mykl mykl is offline
Registered User
 
Join Date: Jan 2015
Location: Ottawa
Posts: 475
Here are some pictures and videos I took tonight. A construction worker said the lantern was being tested at 10% brightness. Apparently it will be able to rival the sun haha. Sorry they're links, i hate going to the trouble of hosting on a million different websites

https://www.instagram.com/p/BV6cbCil-CK/front entrance
https://www.instagram.com/p/BV6d2XAFFJ4/front entrance
https://www.instagram.com/p/BV6cq1dFq6w/box office
https://www.instagram.com/p/BV6c8C8FA1i/back door
https://www.instagram.com/p/BV6dQtpls5s/back door
https://www.instagram.com/p/BV6dh7yF1dZ/ceiling
https://www.instagram.com/p/BV6eQtTFmS0/lantern

https://www.instagram.com/p/BV6e3ChlYXU/lantern video 1
https://www.instagram.com/p/BV6fEVclSqo/lantern video 2
Reply With Quote
     
     
  #169  
Old Posted Jun 29, 2017, 10:42 AM
Marshsparrow Marshsparrow is offline
Registered User
 
Join Date: Dec 2009
Posts: 1,680
A driver will become distracted / blinded, do harm and the thing will be turned off - I give it 6 months.
Reply With Quote
     
     
  #170  
Old Posted Jun 29, 2017, 11:40 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,705
Quote:
Originally Posted by mykl View Post
Here are some pictures and videos I took tonight. A construction worker said the lantern was being tested at 10% brightness. Apparently it will be able to rival the sun haha. Sorry they're links, i hate going to the trouble of hosting on a million different websites

Here you go... no alternate hosting required:

















Reply With Quote
     
     
  #171  
Old Posted Jun 29, 2017, 12:59 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,930
I walked by last night. It looked good (also enhanced by the jazz festival in the background).
Reply With Quote
     
     
  #172  
Old Posted Jun 29, 2017, 1:43 PM
Arcologist Arcologist is offline
Registered User
 
Join Date: Oct 2011
Location: The Nation's Capital
Posts: 696
Looks great, thanks for posting the pics!
Reply With Quote
     
     
  #173  
Old Posted Jun 29, 2017, 2:25 PM
FutureWickedCity's Avatar
FutureWickedCity FutureWickedCity is offline
Registered User
 
Join Date: Mar 2016
Posts: 339
That's really cool how it functions as a screen but also a window. I like everything except for those exterior brown panels that look like cheap tin siding. They they don't flow nicely with the original brown stucco.
Reply With Quote
     
     
  #174  
Old Posted Jun 29, 2017, 3:18 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Looks good at night. During the day is another story. Not loving the siding facing Elgin.

On a side note, it would be nice if they had some kind of walk of fame on the sidewalk in front of the NAC. Perhaps for the GG's performing arts awards. One of the awards is named after the NAC.
Reply With Quote
     
     
  #175  
Old Posted Jun 29, 2017, 11:48 PM
Mikeed Mikeed is offline
Registered User
 
Join Date: Jun 2013
Posts: 377
I think this is beautiful

Very visible as a terminating vista from Queen street- both LRT stations. looks cool from down Elgin too
Reply With Quote
     
     
  #176  
Old Posted Jun 29, 2017, 11:49 PM
Mikeed Mikeed is offline
Registered User
 
Join Date: Jun 2013
Posts: 377
I'm wondering if the siding facing Elgin might change in the other phases. One of the articles mentions this is phase 1 of 3.

There was a big push to get it done by July 1st, 2017.
Reply With Quote
     
     
  #177  
Old Posted Jun 30, 2017, 1:33 AM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,801
I assume that "upside-down Y" shape that we see all over the glass is to make the building bird safe?
Reply With Quote
     
     
  #178  
Old Posted Jun 30, 2017, 1:36 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
I walked by last night too and it looked great! Hoping to check it out on Saturday.
Reply With Quote
     
     
  #179  
Old Posted Jun 30, 2017, 1:59 AM
Admiral Nelson Admiral Nelson is offline
Registered User
 
Join Date: Jun 2009
Posts: 519
Quote:
Originally Posted by mykl View Post
Here are some pictures and videos I took tonight. A construction worker said the lantern was being tested at 10% brightness. Apparently it will be able to rival the sun haha. Sorry they're links, i hate going to the trouble of hosting on a million different websites
Great shots!

Quote:
Originally Posted by bradnixon View Post
I assume that "upside-down Y" shape that we see all over the glass is to make the building bird safe?
That's my suspicion too.
Reply With Quote
     
     
  #180  
Old Posted Jun 30, 2017, 5:39 AM
mykl mykl is offline
Registered User
 
Join Date: Jan 2015
Location: Ottawa
Posts: 475
Quote:
Originally Posted by bradnixon View Post
I assume that "upside-down Y" shape that we see all over the glass is to make the building bird safe?
I quite like this little detail... its actually the meeting place of 3 imaginary hexagons, which of course the building is known for.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 5:10 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.