HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #3601  
Old Posted Jun 16, 2017, 7:22 PM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
^It's not sprawl if it's compact. Sprawl is large lot sizes, space between houses.

Another example of new Single Family product being built in Surrey:


Last edited by Shift; Jun 16, 2017 at 7:33 PM.
     
     
  #3602  
Old Posted Jun 16, 2017, 8:10 PM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Montreal just got more than 900 million for their transit project. Let's see how long it takes the Feds to hand out cash for Translink projects. Fighting their KM pipeline is not a good strategy.
     
     
  #3603  
Old Posted Jun 16, 2017, 8:26 PM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,429
Quote:
Originally Posted by Shift View Post
^It's not sprawl if it's compact. Sprawl is large lot sizes, space between houses.

Another example of new Single Family product being built in Surrey:

No sprawl can be anything outside the city centre, that spreads people out farther away. Bad sprawl are large spread out lots with unwalkable streets. Good sprawl is compact walkable with a street grid etc
     
     
  #3604  
Old Posted Jun 16, 2017, 8:46 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,154
Quote:
Originally Posted by Trainguy View Post
The term "light rail" in this case causes confusion because the Montreal system is basically a Skytrain and not a Surrey type of street car.
It's a very loose definition to begin with. Many Asian countries also have SkyTrain-type lines called "LRT" - the difference being that they're smaller and slower than conventional metros or even SkyTrains, and more like grade-separated trams.
     
     
  #3605  
Old Posted Jun 16, 2017, 11:45 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,719
Quote:
Originally Posted by Shift View Post
All stop lights are placed on the opposite side of an intersection. You don't park your vehicle in the middle of an intersection at a red light.
Thanks, and I already answered that concern.
     
     
  #3606  
Old Posted Jun 16, 2017, 11:50 PM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,990
Unless everyone has just become apathetic, I am reposting what I said on the Transit thread here.

Seriously, everyone fill out the survey and be sure to demand skytrain for Langley at the end.

The video may be ambiguous to the technology choice, but the info graphics on the website are pretty clear about it being surface LRT, aka, not skytrain.

Quote:
Alright, filled out the survey.

Made sure to voice my concern over phase two being LRT (to Langley) and how it makes no sense, especially with the Expo Line currently terminating looking directly at Langley.

Seriously, they want to build it as a 16km long at grade LRT with only 8 stops... My god that will be slow going along Fraser.

Call me crazy but such station spacing sounds like the job for skytrain IMO...
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #3607  
Old Posted Jun 23, 2017, 9:56 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by Metro-One View Post
Unless everyone has just become apathetic, I am reposting what I said on the Transit thread here.

Seriously, everyone fill out the survey and be sure to demand skytrain for Langley at the end.

The video may be ambiguous to the technology choice, but the info graphics on the website are pretty clear about it being surface LRT, aka, not skytrain.
Also email [email protected]
     
     
  #3608  
Old Posted Jun 23, 2017, 8:06 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,122
Quote:
Originally Posted by Kisai View Post
Have done both. Made if very clear I do not support street-grade LRT along Fraser Highway unless a proper business case from Translink proves it is the best choice over SkyTrain. A little longer than this though....
     
     
  #3609  
Old Posted Jun 23, 2017, 8:16 PM
paulsparrow paulsparrow is offline
Registered User
 
Join Date: May 2015
Posts: 61
Quote:
Originally Posted by Shift View Post
Nice rendering of the future LRT along the to-be-pedestrianized City Parkway, showing the Surrey Central Station north house expansion, completed Civic Plaza, and new Central Avenue.

Can you photoshop in a shopping cart across the tracks to make it more realistic of Whalley.
     
     
  #3610  
Old Posted Jun 23, 2017, 10:22 PM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
Quote:
Originally Posted by paulsparrow View Post
Can you photoshop in a shopping cart across the tracks to make it more realistic of Whalley.
^Stupid comment. Out of touch with the area. Comments like this are stuck in the 90's, 00's.

Some places don't stay the same forever. Not exactly an area in decline.
     
     
  #3611  
Old Posted Jun 24, 2017, 5:53 PM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
Some LRT Track routing from the open house.

Fraser Hwy to King George Station next to the Hub:




100 Ave to 102 Ave:




102 Ave to Surrey Central Station:




96th & King George:

     
     
  #3612  
Old Posted Jun 24, 2017, 5:59 PM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
And a few of the display boards:







     
     
  #3613  
Old Posted Jun 24, 2017, 6:04 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by Shift View Post
102 Ave to Surrey Central Station:

damn that corner 102@King George. turn right across a crosswalk and 2 sets of tracks with 2 straight through lanes then crossing across 2 straght through lanes and a right turn lane 1 block away. that's many accidents waiting to happen in the span of a block.
     
     
  #3614  
Old Posted Jun 24, 2017, 7:42 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,154
Only in Grand Theft Auto does that kind of route make sense. Wow.
     
     
  #3615  
Old Posted Jun 24, 2017, 7:47 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,591
Quote:
Originally Posted by Migrant_Coconut View Post
Only in Grand Theft Auto does that kind of route make sense. Wow.
That would be the (tiny) section they were talking about putting in a tunnel.
     
     
  #3616  
Old Posted Jun 24, 2017, 9:40 PM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,964
Quote:
Originally Posted by Migrant_Coconut View Post
Only in Grand Theft Auto does that kind of route make sense. Wow.
     
     
  #3617  
Old Posted Jun 24, 2017, 11:10 PM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Quote:
Originally Posted by Migrant_Coconut View Post
Only in Grand Theft Auto does that kind of route make sense. Wow.
Complete waste of money. They are better off extending Skytrain down Fraser Hwy with the 2 Billion this street car route will cost.
     
     
  #3618  
Old Posted Jun 24, 2017, 11:49 PM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
LOL at the KG @ 102ave intersection. It reminds me of that fucked up crossing near NAIT station in Edmonton. Let's also not forget the elephant in the room, 104ave. 1 lane in each direction is downright stupid.

Also, a reminder why at-grade crossings are not reliable. No matter how much precautions you implement, you cannot prevent human error.
Video Link
     
     
  #3619  
Old Posted Jun 25, 2017, 2:12 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,990
Wow....

Thos look... terrible.

Seriously, I don't think you could add more points of conflict if you tried.

2 billion dollars for this level of quality? The Vancouver Streetcar had far superior street interactions than this (and more separation).
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #3620  
Old Posted Jun 25, 2017, 2:57 AM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,719
Quote:
Originally Posted by VancouverOfTheFuture View Post
damn that corner 102@King George. turn right across a crosswalk and 2 sets of tracks with 2 straight through lanes then crossing across 2 straght through lanes and a right turn lane 1 block away. that's many accidents waiting to happen in the span of a block.
That intersection alone makes me never want to drive down King George ever again. Yikes.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:14 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.