Harbour Plaza complex is very pretty and futuristic.
I am so happy to see them added in the skyline.
But it will be more exicting to see Bay park Centre and
1 Yonge phase 1 coming in the next 3 years.
__________________
World class architecture for Canada please!
Reply With Quote
     
     
  #3662  
Old Posted Jun 21, 2017, 9:55 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Harbourplaza and Ten York, just keep us occupied until Bay Park Center gets going.

This will be the first real skyscraper to go up in Toronto in 30 years, at least since Scotiabank.

They are getting ready for Monday, official ground breaking.
Reply With Quote
     
     
  #3663  
Old Posted Jun 21, 2017, 1:49 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
4 more year hearing how Aura and One Bloor are made of cheese
Reply With Quote
     
     
  #3664  
Old Posted Jun 21, 2017, 2:47 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Bay Park Center groundbreaking was today, I thought it was gonna be Monday. Lol!

Bay Park Center is now called CIBC Square!
Reply With Quote
     
     
  #3665  
Old Posted Jun 21, 2017, 4:14 PM
FrankieFlowerpot's Avatar
FrankieFlowerpot FrankieFlowerpot is offline
Registered User
 
Join Date: Aug 2012
Posts: 3,478
Walked past Massey this morning - they've started the balcony railing installation already - yet there's no sign of any of the exterior cladding going in.
Reply With Quote
     
     
  #3666  
Old Posted Jun 21, 2017, 4:19 PM
koops65's Avatar
koops65 koops65 is offline
Intergalactic Barfly
 
Join Date: Dec 2006
Location: Quarks Bar
Posts: 8,727
Quote:
Originally Posted by caltrane74 View Post
Harbourplaza and Ten York, just keep us occupied until Bay Park Center gets going.

This will be the first real skyscraper to go up in Toronto in 30 years, at least since Scotiabank.

They are getting ready for Monday, official ground breaking.
Scotia Plaza, 275 metres, was completed in '88, TD Canada Trust, 263 metres, was completed in '90.
Reply With Quote
     
     
  #3667  
Old Posted Jun 21, 2017, 4:23 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
Quote:
Originally Posted by FrankieFlowerpot View Post
Walked past Massey this morning - they've started the balcony railing installation already - yet there's no sign of any of the exterior cladding going in.
Probably want to get a leg up on the railings as they still haven't finished Five.
Reply With Quote
     
     
  #3668  
Old Posted Jun 21, 2017, 4:48 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Quote:
Originally Posted by koops65 View Post
Scotia Plaza, 275 metres, was completed in '88, TD Canada Trust, 263 metres, was completed in '90.
I don't like Canada Trust tower...so I didn't count it.
Reply With Quote
     
     
  #3669  
Old Posted Jun 21, 2017, 8:03 PM
TorontoDrew's Avatar
TorontoDrew TorontoDrew is offline
Registered User
 
Join Date: Nov 2014
Posts: 10,691
I like the south tower, not a fan of the north tower at all.
__________________
"Less is more" – Ludwig Mies van der Rohe
Reply With Quote
     
     
  #3670  
Old Posted Jun 21, 2017, 8:10 PM
TorontoDrew's Avatar
TorontoDrew TorontoDrew is offline
Registered User
 
Join Date: Nov 2014
Posts: 10,691
Will they be building Bay Park 1 and @ at the same time?
__________________
"Less is more" – Ludwig Mies van der Rohe
Reply With Quote
     
     
  #3671  
Old Posted Jun 21, 2017, 8:21 PM
TorontoDrew's Avatar
TorontoDrew TorontoDrew is offline
Registered User
 
Join Date: Nov 2014
Posts: 10,691
From the CBC
source: http://www.cbc.ca/news/canada/toronto/cibc-square-bay-street-1.4171308
Construction kicks off on Bay Street mega-development, set to include towers, bus terminal, park
CIBC Square, located next to Union Station, is slated to be completed by 2023
By Kate McGillivray, CBC News Posted: Jun 21, 2017 3:15 PM ET Last Updated: Jun 21, 2017 3:15 PM ET

A groundbreaking ceremony was held Wednesday for a major new development at the foot of Bay Street that will house the global headquarters for CIBC and incorporate a bus terminal and one-acre park built over the railway tracks.

The public-private development, previously called Bay Park Centre and now renamed CIBC Square, will see two office towers erected at 81 and 141 Bay Street, south of Front Street.

Ontario Transportation Minister Steven Del Duca described the inclusion of a bus terminal, called the Union Station Bus Terminal and linked to GO trains, TTC and Via Rail, as "fundamentally important" for Toronto.

Mayor John Tory was also on hand for the ceremony, saying: "I love the towers, I love the transit connections, I love the jobs… but I'm particularly interested in the park."



So now we have a a 264.6m and a 238.5m to ad to the list.
__________________
"Less is more" – Ludwig Mies van der Rohe
Reply With Quote
     
     
  #3672  
Old Posted Jun 21, 2017, 9:09 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
CIBC signed the contract for two towers, but only one is starting now, because the old bus terminal is on the other lot. Once the first tower with the new bus terminal is built, they can start to work on tower number 2.
Reply With Quote
     
     
  #3673  
Old Posted Jun 21, 2017, 9:37 PM
jmt18325's Avatar
jmt18325 jmt18325 is offline
Heart of the Continent
 
Join Date: Apr 2009
Location: Winnipeg
Posts: 7,286
Could someone be wonderful and pretend this was the first page and just make a list of the current towers for me? I'm lost at this point.
Reply With Quote
     
     
  #3674  
Old Posted Jun 21, 2017, 10:04 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
Quote:
Originally Posted by caltrane74 View Post
CIBC signed the contract for two towers, but only one is starting now, because the old bus terminal is on the other lot. Once the first tower with the new bus terminal is built, they can start to work on tower number 2.
The bus terminal alone isn't going to delay construction. Staggering the construction allows the developer more time to lease the remaining blocks of space one tower at a time and CIBC to have less of an overlay with their outgoing and incoming lease terms.
Reply With Quote
     
     
  #3675  
Old Posted Jun 21, 2017, 10:08 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
Quote:
Originally Posted by jmt18325 View Post
Could someone be wonderful and pretend this was the first page and just make a list of the current towers for me? I'm lost at this point.
I think it's up to date.

There's also a custom search function in the diagram section. Check it out.
Reply With Quote
     
     
  #3676  
Old Posted Jun 22, 2017, 2:16 AM
koops65's Avatar
koops65 koops65 is offline
Intergalactic Barfly
 
Join Date: Dec 2006
Location: Quarks Bar
Posts: 8,727
Current top 10: http://skyscraperpage.com/cities/?buildingID=113689

The Harbour Plaza twins will be finished soon, as will 88 Scott.
CIBC Square will join the list at #2.
E Condos S and Wellesley on the Park will move into #9 and #10.
Reply With Quote
     
     
  #3677  
Old Posted Jun 22, 2017, 2:23 AM
jmt18325's Avatar
jmt18325 jmt18325 is offline
Heart of the Continent
 
Join Date: Apr 2009
Location: Winnipeg
Posts: 7,286
Quote:
Originally Posted by koops65 View Post
That's definitely not the current top 10 lol...
Reply With Quote
     
     
  #3678  
Old Posted Jun 22, 2017, 2:32 AM
koops65's Avatar
koops65 koops65 is offline
Intergalactic Barfly
 
Join Date: Dec 2006
Location: Quarks Bar
Posts: 8,727
http://skyscraperpage.com/diagrams/?searchID=77622475

Not sure how I screwed that up, but this is more like it...
Reply With Quote
     
     
  #3679  
Old Posted Jun 22, 2017, 2:46 AM
jmt18325's Avatar
jmt18325 jmt18325 is offline
Heart of the Continent
 
Join Date: Apr 2009
Location: Winnipeg
Posts: 7,286
Quote:
Originally Posted by koops65 View Post
http://skyscraperpage.com/diagrams/?searchID=77622475

Not sure how I screwed that up, but this is more like it...
Thank you so so much.
Reply With Quote
     
     
  #3680  
Old Posted Jun 22, 2017, 3:34 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Harbourplaza ....not on the list much longer.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 8:43 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.