Originally Posted by connect2source View Post
Could not agree more! Brilliant post and thanks!!

Having just returned from Spain, driving a manual transmission VW Polo all over Andalusia and the Canaries, I got a first hand look at Spain's incredible road infrastructure, much of which is tolled. This is a country heavily committed to all forms of transportation, highways compliment high-speed rail and local transport networks in most cities are highly evolved and very efficient.

Their Autopistas ( Freeways ) are magnificent, in mountainous areas they are straightaways thanks to extensive tunnelling wherever there's a barrier, road signs are large and visible, lane markings are beautifully maintained, painted and highly visible. I could go on and on... but they obviously believe that decent highways are essential to more than single occupancy vehicles, hence their attitudes are far more evolved. These road networks transport people, goods, transit and often bikes, they are essential to local economies and aren't frowned upon.

Driving through the Massey Tunnel, upon returning last week, gave me new perspective on this crumbling third-world embarrassment. Even in the farthest reaches of the Canary Islands, I never once witnessed anything this deplorable or downright dangerous.

I don't know where to begin on this piece-of-crap which is obviously close to the end of it's life. For starters the idea of oncoming traffic during the counterflow hours, in a tube with no shoulders or pull-outs of any kind, is a death-trap plain and simple, I've actually never seen anything like it in my travels. It should be made illegal tomorrow as it's a disaster waiting to happen.

The tunnel itself, even during non-counterflow periods is narrow, poorly lit, bumpy and not even close to today's safety standards.

It's also seismically un-sound, likely close to that of the disaster-prone Pattullo bridge. These pre-case concrete sections will likely break-apart in a moderate earthquake killing many and rendering an essential part of road infrastructure inoperable for years. Who then will take responsibility for cancelling this project?

The notion that the replacement is not essential is reckless, for all those opposed to the 10 lane mega-project, we need replacement of some sort immediately be it a paired-down version of the proposal.
Good post. U can say that a lot of 1st world countries in Europe have better roads than BC. Even friggin Poland.
Reply With Quote
     
     
  #2382  
Old Posted Jun 6, 2017, 6:39 PM
moosejaw moosejaw is offline
Registered User
 
Join Date: Apr 2012
Location: Miami
Posts: 482
Quote:
Originally Posted by flipper316 View Post
Good post. U can say that a lot of 1st world countries in Europe have better roads than BC. Even friggin Poland.
Even in Chile - again roads that are tolled.
Reply With Quote
     
     
  #2383  
Old Posted Jun 7, 2017, 1:08 AM
connect2source's Avatar
connect2source connect2source is offline
life in the present
 
Join Date: Mar 2011
Location: Halifax
Posts: 1,869
Just drove Hwy 99 through Richmond - Tunnel - and to Hwy 91. Noticed the widening work - tree removal along the highway both north and south of the tunnel seems to have ground to a halt as well. Any predictions as to what will happen to this work if the project is cancelled? Looks to become a huge mess and eye-sore if not somewhat completed, paved / finished in some way.
__________________
source | energy
Reply With Quote
     
     
  #2384  
Old Posted Jun 7, 2017, 1:48 AM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,428
Quote:
Originally Posted by connect2source View Post
Just drove Hwy 99 through Richmond - Tunnel - and to Hwy 91. Noticed the widening work - tree removal along the highway both north and south of the tunnel seems to have ground to a halt as well. Any predictions as to what will happen to this work if the project is cancelled? Looks to become a huge mess and eye-sore if not somewhat completed, paved / finished in some way.
The work they are doing now is being done between 10pm and 5am. I drive this stretch all the time during the day and I have never seen actual work going on ever since it began.
Reply With Quote
     
     
  #2385  
Old Posted Jun 7, 2017, 2:56 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,397
Spain built its highways, high-speed rail and ghost airports with EU billions. Same with all Mediterranean countries, like Greece's highways to nowhere. Not a good comparison when they were able to exploit billions from EU programs...

But I do agree with the underlying sentiment.
Reply With Quote
     
     
  #2386  
Old Posted Jun 7, 2017, 3:35 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by Metro-One View Post
Defer to the mayors essentially means it will never happen.

It is also a terrible way to do things in Metro-Van.

If we "deferred to the mayors" for transit the Evergreen Line and the Canada Line would have been at grade LRT, and not skytrain.

Sometimes the point of a good provincial government is to make the hard choices that the region needs that the local governments might not exactly agree with.

I already explained why the twinned tunnel is a non-starter (will still have a high cost, the existing tubes will still need to be replaced in a couple decades, would create even more unneeded splits in the road way, does not address the shipping or seismic concerns, and would likely involved some pretty poorly designed interchanges.

I can understand why people would vote for the NDP / Greens given other priorities, but it is okay to admit that involving this specific project they are dropping the ball.
To be more clear, I do think it would be wrong to cancel this project, and I do think that they likely will. The key word is "likely" as I do think with such a close legislature (in terms of seats) there may be things like this where the NDP and Greens won't be able to totally ignore the Liberals.

I live in Ladner, believe me, I want this bridge And I know that its chances took a nose dive with the new government. But its as you said, there are other considerations and priorities in voting than just this bridge.
Reply With Quote
     
     
  #2387  
Old Posted Jun 7, 2017, 4:04 AM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Quote:
Originally Posted by connect2source View Post
Just drove Hwy 99 through Richmond - Tunnel - and to Hwy 91. Noticed the widening work - tree removal along the highway both north and south of the tunnel seems to have ground to a halt as well. Any predictions as to what will happen to this work if the project is cancelled? Looks to become a huge mess and eye-sore if not somewhat completed, paved / finished in some way.
Drive through after 8pm and you will see tons of work being done. Every single section under construction has nonstop work going every night. It is quite impressive to watch, and depressing to imagine it all coming to nothing.
Reply With Quote
     
     
  #2388  
Old Posted Jun 7, 2017, 6:25 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
Quote:
Originally Posted by Zassk View Post
Drive through after 8pm and you will see tons of work being done. Every single section under construction has nonstop work going every night. It is quite impressive to watch, and depressing to imagine it all coming to nothing.
Well, at least the contractors are working now and getting paid. So these are the only people at least getting something out of it before this gets canceled.
Reply With Quote
     
     
  #2389  
Old Posted Jun 7, 2017, 11:13 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Drove past them at 11pm and then back at 3am and they were going gangbusters on both sides of the tunnel. Was really surprised how far south they've gotten already.
Reply With Quote
     
     
  #2390  
Old Posted Jun 7, 2017, 12:24 PM
connect2source's Avatar
connect2source connect2source is offline
life in the present
 
Join Date: Mar 2011
Location: Halifax
Posts: 1,869
Does anyone know how far the work will be taken? Guess there's little sense in widening a highway which will eventually be reduced to one or two lanes at the tunnel.
__________________
source | energy
Reply With Quote
     
     
  #2391  
Old Posted Jun 7, 2017, 2:33 PM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Quote:
Originally Posted by connect2source View Post
Does anyone know how far the work will be taken? Guess there's little sense in widening a highway which will eventually be reduced to one or two lanes at the tunnel.
The Libs are still the current government so nothing has changed so far. A contract for the work being done is still in effect. However, once things are settled in the legislature, all bets are off. Governments have a history of blowing millions of dollars just to cancel projects already started. Time will tell..
Reply With Quote
     
     
  #2392  
Old Posted Jun 7, 2017, 3:15 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,558
If only the government were forthcoming with exactly what contracts have been signed for what work, at what cost.
Reply With Quote
     
     
  #2393  
Old Posted Jun 7, 2017, 4:52 PM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,307
Quote:
Originally Posted by WarrenC12 View Post
If only the government were forthcoming with exactly what contracts have been signed for what work, at what cost.
They have done exactly that. They've signed a site prep contract for around 15 million.
Reply With Quote
     
     
  #2394  
Old Posted Jun 7, 2017, 5:01 PM
excel excel is offline
Registered User
 
Join Date: Oct 2005
Location: Calgary
Posts: 3,484
Lets hope it gets far enough along so they don't turn back. I can't say I fully agree with the size or price tag of this project but it needs to be done and it would really piss me off if all this time and money goes to waste.
Reply With Quote
     
     
  #2395  
Old Posted Jun 7, 2017, 5:30 PM
connect2source's Avatar
connect2source connect2source is offline
life in the present
 
Join Date: Mar 2011
Location: Halifax
Posts: 1,869
If the NDP-Greens are committed to some sort of improvement such as twinning the tunnel ( horrible idea ) then Hwy 99 will need to be widened regardless, as well as some improvements to the Steveston Hwy and Hwy 17A interchanges. So perhaps site-prep for widening at this point is productive and may influence a decision to so something with the tunnel.
__________________
source | energy
Reply With Quote
     
     
  #2396  
Old Posted Jun 7, 2017, 5:35 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,558
Quote:
Originally Posted by libtard View Post
They have done exactly that. They've signed a site prep contract for around 15 million.
Ok good. $15M is nothing in this scale.
Reply With Quote
     
     
  #2397  
Old Posted Jun 8, 2017, 2:18 AM
rxp rxp is offline
Registered User
 
Join Date: Jan 2012
Posts: 111
So what exactly is this pre construction package? are they actually going to expand the highway?

It looks to me that they might be able to pave over it and add a lane or two on either end?
Reply With Quote
     
     
  #2398  
Old Posted Jun 8, 2017, 2:21 AM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,307
Quote:
Originally Posted by rxp View Post
So what exactly is this pre construction package? are they actually going to expand the highway?

It looks to me that they might be able to pave over it and add a lane or two on either end?
Expanding the highway comes with the new bridge/interchange/etc. When that contract gets awarded. Right now they're just prepping the ground and making everything more accessible.
Reply With Quote
     
     
  #2399  
Old Posted Jun 8, 2017, 9:58 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
Even if the bridge itself gets canceled, let's hope the highway at least gets expanded. Probably been discussed before but it's kind of disappointing for the price tag which is pretty similar to the Highway 1 improvement project we're only getting an HOV lane added to north and southbound. On top of that it's only getting expanded to Highway 91. Should've been to at least 32nd Ave and in turn that interchange could've been improved as well, which was on the drawing board since 2012 i believe.

Last edited by flipper316; Jun 9, 2017 at 8:11 AM.
Reply With Quote
     
     
  #2400  
Old Posted Jun 8, 2017, 12:28 PM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,915
umm, it is a far bigger project than you are giving it credit for.

It is pretty much completely re-building the entire highway from 91 to the Oak Street bridge.

The Steveston interchange alone is a massive project, not to mention every other interchange being re-built, the province's largest bridge (it will be around 1km longer than the Port Mann), and the considerable rapid bus infrastructure.

It is around 30 km (if not more?) of the entire highway being re-built.

The lane counts throughout the project are also quite adequate (went through this before but the the only 3 by 3 section would be south of the SFPR interchange).

I do agree though, the rapid bus / HOV lane aspect should be built to at least King George or 152nd in order to have a proper rapid bus all there way to White Rock.

Again, cancelling this project is a huge mistake.

And honestly, without expanding the horrid choke point that is the tunnel, there is no point in expanding any other sections of the highway.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:26 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.