Quote:
Originally Posted by Bdawe
One hopes that the "🞵🞵🞵🞵🞵🞵🞵 dwarf's forge" does not characterize the Mark III order as well
|
The TTC kept changing what they wanted, hence ordering parts that had to be fixed by any means.
This doesn't happen when you have standard gauge. It also doesn't happen when the rolling stock is essentially something you engineered, so all the additional work that goes into it is the computer system. (The Mark II, Mark III, and Canada Line all use SelTRAC, which is different from Bombardier's CityFlo tech.)
The dwarfs forge comment likely comes from having to build vehicles to operate on Toronto Gauge. This is the TTC's problem, not Bombardier. Hell had Siemens won the contract you'd be seeing the exact same story except with Siemens. What did you think was going to happen when you refuse to switch to standard gauge in order to save costs? If you wanted cheaper vehicles you'd have to make that investment, otherwise you can not have off-the-shelf vehicles.
This is part of the problem I bring up every time DMJ writes a letter to a local paper shilling for LRT. ALL Rail systems are build-to-order. There is no train store to just pick up a completely built train to plop down on your rail system of choosing. Every city has engineering issues, and the older the city and more car-dependant the city, the more engineering has to go into designing vehicles that will work.
If the TTC had expected Bombardier to go grab it's European LRV's and just put them down on the existing street car system, that was not going to happen.
And the same will happen with Surrey. The city has not, and never been planning for surface Light Rail, the only plans were for the Skytrain down Fraser Highway. The city thinks it's going get a good deal by spending as little as possible, and it's going to be reflected in LRV's that will likely not be weather-appropriate, and the first time it snows, they can't operate, or will be derailed by snow plows.