Quote:
Originally Posted by Reecemartin
I somehow doubt this, LRT does sometimes run in mixed traffic however in doubtful that that would be the case at highway speed, and anyways aren't most LRVs and Skytrain only capaable of like 80 km/h? And embedded Tracks in a highway? Do you actually have any source that suggests that's how LRT would be implemented?
Sounds unlikrly
|
http://www.ticorp.ca/wp-content/uploads/2016/04/PartnershipsBC-Project-Report-14-March-2011.pdf
On page 7
Project Goals
As a result of these studies, the following goals
were established for the Port Mann/Highway 1
Improvement Project:
• Reduce travel times for trips along the corridor
and increase travel time predictability;
• Reduce congestion at entry and exit points to
Highway 1;
• Reduce travel times for trips across the corridor
and improve connections within and between
communities;
• Improve access to and egress from the corridor
for goods movement;
• Facilitate the introduction of transit service along
the corridor and the improvement of transit
service across the corridor;
• Expand HOV, cycling and pedestrian networks
along or in the vicinity of the corridor; and
• Improve safety for vehicle operators and
passengers, cyclists and pedestrians.
The pre-design concept for the Port Mann/Highway
1 Improvement Project included the following
features:
• Added capacity to the Highway 1 corridor;
• Extending the westbound and eastbound HOV
lanes on Highway 1;
• Transit priority measures, including the
introduction of bus service through transit queuejumpers
and extended HOV lanes;
• Significant cycling and pedestrian infrastructure
improvements; and
•
Ability to accommodate future light rail rapid
transit expansion across a new Port Mann Bridge.