View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #7941  
Old Posted Apr 17, 2017, 10:11 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,076
Quote:
Originally Posted by Reecemartin View Post
While of course trains can be added I can imagine that once things are fully built out the stations are gonna be like sardine cans when a train comes in.
Unless the station is unable to process all the passengers before the next train arrives, or the trains leave people behind... wouldn't it be the same if the same 2-car trains runs at 2m headway instead of 3m10s?

And even if 3-car trains are used (+50% capacity) and stations are fully expanded (+25% capacity), the stations are only going to get 20% more crowded.
     
     
  #7942  
Old Posted Apr 19, 2017, 12:56 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by nname View Post
Unless the station is unable to process all the passengers before the next train arrives, or the trains leave people behind... wouldn't it be the same if the same 2-car trains runs at 2m headway instead of 3m10s?

And even if 3-car trains are used (+50% capacity) and stations are fully expanded (+25% capacity), the stations are only going to get 20% more crowded.
Can't use 3-car trains, since all expo / millennium cars are configured as "married pairs".

excepting the new Mk III sets. "Married Quads" ??
     
     
  #7943  
Old Posted Apr 19, 2017, 1:14 AM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:22 AM.
     
     
  #7944  
Old Posted Apr 19, 2017, 1:51 AM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,117
Quote:
Originally Posted by Reecemartin View Post
...the process could probably be more orderly if people already knew where to stand so that the door was in front of them. .
So they can block those getting off even more effectively.
     
     
  #7945  
Old Posted Apr 19, 2017, 3:41 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,101
Again, the solution is more train sets; if peak-hour frequency was every minute and a half instead of every three, the stations wouldn't even be crowded.
     
     
  #7946  
Old Posted Apr 19, 2017, 3:57 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,782
Quote:
Originally Posted by Reecemartin View Post
In response to station crowding I'm purely referring to the train dwelling and passengers getting on and off, the process could probably be more orderly if people already knew where to stand so that the door was in front of them. Currently things can be pretty chaotic.
It's pretty easy on the Canada Line since all the trains stop in the same place - you just look to see where all the foot traffic has left darkened spots along the platform edge.
     
     
  #7947  
Old Posted Apr 19, 2017, 5:46 AM
Hot Rod's Avatar
Hot Rod Hot Rod is offline
Big City Enthusiast
 
Join Date: Feb 2006
Location: Seattle-Vancouver-Osaka-Chongqing-Chicago-OKC
Posts: 1,187
Aside: since so many commented on my post it's only fair that I respond. ...

I didn't say that if Vancouver all of sudden lengthened Canada Line platforms to 80m that it would increase ridership (although I WOULD argue it would). I did say, however, that Vancouver should have built Canada Line platforms to 80m in the first place, which would have saved costs to expand later.

I wasn't even thinking nor comparing Canada Line to Expo and M Line with my 80m argument, necessarily. I was, however, thinking that the current 40m and 15,000 ppdph for Canada Line is low-balling it and will be highlighted when MLine connects to Central Broadway CBD and UBC.

Again, I think it was a missed opportunity to low-ball Canada Line not considering how the system would connect to it later. Nothing wrong with having long platforms but using short trains according to existing ridership and adjust/expand trains as necessary (ala Chicago's L). In fact, I'd argue it would have been most fiscally responsible to build the platforms from the beginning.

And sorry, I don't buy the argument that Richmond isn't a growth area - I don't care what the 1997 plan dictated; the recent highrises/TODs additions along Canada Line/No 3 Road would easily prove otherwise thereby - along with YVR traffic - justify peak loads higher than 15K per direction per hour. ..

but I digress. ....
     
     
  #7948  
Old Posted Apr 20, 2017, 6:36 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
There's a lot of off-topic discussions lately in the Transport forum. Let's go back to the Millennium Line please. Any posts regarding the Canada Line from this point on will be deleted.
     
     
  #7949  
Old Posted Apr 21, 2017, 6:42 AM
Feathered Friend Feathered Friend is offline
Registered User
 
Join Date: Jun 2016
Posts: 2,523
Core Sampling Continues

http://vancouver.ca/streets-transportation/roadwork.aspx
Quote:
Event: Golder Associates Environmental Investigation at W Broadway
Location:
W Broadway between Hemlock St and Granville St
Expected Schedule:
Apr 19, 2017 - Apr 23, 2017; All days
Status: Approved
Description:
Traffic at W Broadway between Hemlock St and Granville St will be reduced to two lanes in each direction (24 hrs) Thursday to Sunday to facilitate geotechnical investigations. Traffic delays can be expected.
Posted: Apr 20, 2017
Updated: Apr 18, 2017 4:05 PM
City Contact: Dean Du Toit 604.873.7474
The work continues! Seems like they're just retesting the entire corridor.
     
     
  #7950  
Old Posted Apr 21, 2017, 12:35 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Feathered Friend View Post
http://vancouver.ca/streets-transportation/roadwork.aspx


The work continues! Seems like they're just retesting the entire corridor.
I wonder if this is due to the issues they had in Ottawa.
     
     
  #7951  
Old Posted Apr 21, 2017, 3:26 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,595
Saw them at Hemlock yesterday, during rush hour...

I'm more worried than hopeful based on the amount of testing. There must be something they are concerned about. Whether from other projects or something they found the last time around.
     
     
  #7952  
Old Posted Apr 21, 2017, 5:32 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,677
My suspicion is that following analysis of the original core samples they are going back to due further investigation of the areas that require more information (increased sample density, further depth, more angular sampling into surrounding strata, etc.)

It doesn't strike me as a worrisome development at all. Rather, it's a positive, because the money for further testing wouldn't be spent now if the project weren't active and the data this generates will help further refine the cost and schedule estimates for the project.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
     
     
  #7953  
Old Posted Apr 22, 2017, 4:20 AM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:22 AM.
     
     
  #7954  
Old Posted Apr 22, 2017, 5:16 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,933
It could also be that the sink holes associated with the Evergreen Line have made them be more cautious this time around.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #7955  
Old Posted Apr 22, 2017, 5:41 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,076
I would be curious to know what they find. I seem to recall that once you are off the flats it's all solid rock.
     
     
  #7956  
Old Posted Apr 22, 2017, 6:06 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,576
Quote:
Originally Posted by Metro-One View Post
It could also be that the sink holes associated with the Evergreen Line have made them be more cautious this time around.
I would agree.

Remember that the data they reveal will be presented to the bidders (probably a design, build, partially finance like Evergreen) and the bidders will use the information in estimating schedule, assumption of risks, price, etc. - so the more complete and accurate the information, the lower - hopefully - the bids will be.

Any gaps in information will result in higher bids.
     
     
  #7957  
Old Posted Apr 22, 2017, 6:01 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,595
Quote:
Originally Posted by officedweller View Post
Any gaps in information will result in higher bids.
Actually I think you'd still get low bids, but then the builder would get themselves into unexpected trouble - like Evergreen.
     
     
  #7958  
Old Posted Apr 22, 2017, 10:29 PM
Marshal Marshal is offline
perhaps . . .
 
Join Date: Dec 2015
Location: Vancouver
Posts: 1,493
Quote:
Originally Posted by SFUVancouver View Post
My suspicion is that following analysis of the original core samples they are going back to due further investigation of the areas that require more information (increased sample density, further depth, more angular sampling into surrounding strata, etc.)

It doesn't strike me as a worrisome development at all. Rather, it's a positive, because the money for further testing wouldn't be spent now if the project weren't active and the data this generates will help further refine the cost and schedule estimates for the project.
This is pretty much the case. It is not indicative of them being worried about something problematic. It is normal engineering operations; acquiring more detailed information to move the engineering design forward.

As for the Evergreen sinkholes: this is not some scary and rare condition that is going to disturb experienced tunneling engineers. They understand the implications and potential difficulties. Sinkholes on one project are not going to 'freak out' the engineers on another. Tunneling is overwhelmingly determined on a case by case, project by project basis. The more information they gather, the lower becomes the risk of unforseen difficulties.

officedweller is correct: the less information, the less reliable the information, the higher the risk, and contractors must build that into their quotes - meaning higher estimated contingencies contributing to high priced bids. The catch being that they have to be aware of those facts. They were not on the Evergreen tunnel . . . something was not right in the bid process there.

WarrenC12: anything is possible, but no contractor will risk their profit margin in the manner you describe. They will only 'bid low' (a purely relative quantity) if they have a contractual loop-hole through which they know they can get extra money if something goes wrong. For them, this is just a different way of handling risk and contingency. In this situation, it is the client/government that is entering a higher risk contractual situation. That's how "we" always end up footing the bill. The contractors know what they are doing. They always use contracts to protect their interests across all foreseeable futures.

Just a little side note that never gets mentioned: tunnelling is typically complex and the design of the machine (or other method) depends upon the material it must tunnel through. That seems to be common knowledge. The routing of the tunnel is also partly due to these same conditions. But what gets forgotten is that the tunnel is like an above ground structure in that it weighs upon the earth below it. That earth/rock must also be capable of taking the live loads of full trains running over it. Just think of the above grade guideways. The tunnel must provide the same level of structuring of the same load determination + hold itself up against water pressure and the weight of the earth above. Of course, often the earth above holds itself up by transferring the load around the tunnel through the rock or other solid matter. The soils testing is also about the bearing capacity along the route.
     
     
  #7959  
Old Posted Apr 23, 2017, 4:04 AM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,595
Quote:
Originally Posted by Marshal View Post
WarrenC12: anything is possible, but no contractor will risk their profit margin in the manner you describe. They will only 'bid low' (a purely relative quantity) if they have a contractual loop-hole through which they know they can get extra money if something goes wrong. For them, this is just a different way of handling risk and contingency. In this situation, it is the client/government that is entering a higher risk contractual situation. That's how "we" always end up footing the bill. The contractors know what they are doing. They always use contracts to protect their interests across all foreseeable futures.
I've seen a number of government contracts that end up being "lose/lose" due to low bidding, complicated fine print, and overall disorganization and inexperience of the winning bid proponent.
     
     
  #7960  
Old Posted Apr 23, 2017, 4:41 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,576
Thanks for the insight, Marshal!

Quote:
Originally Posted by WarrenC12 View Post
Actually I think you'd still get low bids, but then the builder would get themselves into unexpected trouble - like Evergreen.
I'm assuming that the Contractor will be required to take the tunnelling risk (like for Evergreen) - so they would pad their bid to account for the risk of gaps in information.

I suppose the bid could be lower if the Contracor does not take the tunnelling risk, but I can't really see the Province agreeing to that, especially if there's a lot of information, and if other bidders are willing to accept the tunnelling risk.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:35 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.