HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia


Reply

 
Thread Tools Display Modes
     
     
  #641  
Old Posted Mar 29, 2017, 1:40 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,006
Quote:
Originally Posted by Bobert View Post
I did not know this! Do we have any documents/images/concepts of this?
There once was an entire 3D fly through video, but that has now been removed.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #642  
Old Posted Mar 29, 2017, 5:49 AM
kev_427 kev_427 is offline
Registered User
 
Join Date: Mar 2011
Location: Kelowna
Posts: 133
The link is unlisted, but I saved it a while ago.


https://www.youtube.com/watch?v=oBLRAGu1Ujw
Reply With Quote
     
     
  #643  
Old Posted Mar 29, 2017, 5:31 PM
Calgarian's Avatar
Calgarian Calgarian is offline
Registered User
 
Join Date: Jun 2006
Location: Calgary, AB
Posts: 25,199
Thanks for posting that, looks great! even though it's going to be almost a decade before it's done, this is desperately needed.
__________________
Git'er done!
Reply With Quote
     
     
  #644  
Old Posted Mar 29, 2017, 6:55 PM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,407
So is that video of Kicking Horse Phase 4 the current plan ?
Reply With Quote
     
     
  #645  
Old Posted Mar 30, 2017, 3:29 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,006
No, that was the previous one.

The new alignment is essentially the same, but they will be using a few more bridge structures and will blast away the mountain sides, and then use retaining walls, instead of the tunnels.

Very North American style.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #646  
Old Posted Apr 11, 2017, 7:21 AM
Stingray2004's Avatar
Stingray2004 Stingray2004 is offline
Registered User
 
Join Date: Jan 2004
Location: White Rock, BC (Metro Vancouver)
Posts: 3,145
Phase 4 of the Kicking Horse Canyon, preliminary concept, included a tunnel as well as rock sheds/snow sheds on the western half. The cost thereto would have likely been closer to $650 million as opposed to the $400+ million in the final design.

Same 100 km/hr design speed except that the tunnel/rocksheds/snowsheds have been replaced by retaining walls as well as cantilevered highway/additional bridging. Brought down the cost. From BC MoTi:

Quote:
Tunnels were a consideration in earlier design concepts, however, further engineering during the preliminary design phase found more cost effective solutions that did not require them.

The alignment is designed to avoid the areas of avalanche hazard, and accommodate rock falls in catchment ditches, like those used on the east approach to the Park Bridge.
Reply With Quote
     
     
  #647  
Old Posted Apr 17, 2017, 8:28 PM
eloy eloy is offline
Registered User
 
Join Date: Oct 2012
Posts: 8
Quote:
Originally Posted by VANRIDERFAN View Post
Is there any concept drawings of the finalized design?

I read that the phase 4 section is very unstable and that is maybe why they are going the tunnel route. I could be totally out to lunch though.
here are the drawings for phase 4. The project is officially still in design, so this may be updated, but it's the latest version
https://www.th.gov.bc.ca/kickinghorse/im...ing%20Concept%20Plan%20Z9A-D_REDUCED.jpg
Reply With Quote
     
     
  #648  
Old Posted Apr 17, 2017, 9:11 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,153
^ Looks good, i went back a few pages but couldn't find any timeline info. Is there an expected start and end date yet?
Reply With Quote
     
     
  #649  
Old Posted Apr 18, 2017, 4:27 PM
jmt18325's Avatar
jmt18325 jmt18325 is offline
Heart of the Continent
 
Join Date: Apr 2009
Location: Winnipeg
Posts: 7,286
Quote:
Originally Posted by LeftCoaster View Post
^ Looks good, i went back a few pages but couldn't find any timeline info. Is there an expected start and end date yet?
The start date is 2019.
Reply With Quote
     
     
  #650  
Old Posted Apr 20, 2017, 6:20 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,407
Quote:
Originally Posted by eloy View Post
here are the drawings for phase 4. The project is officially still in design, so this may be updated, but it's the latest version
https://www.th.gov.bc.ca/kickinghorse/im...ing%20Concept%20Plan%20Z9A-D_REDUCED.jpg
Awesome! - thanks for posting that.
Reply With Quote
     
     
  #651  
Old Posted Apr 21, 2017, 4:40 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Anyone drive the TCH from Calgary to Salmon Arm lately ? Any big delays ?

Headed to Vernon in a few weeks via the #1, Haven't driven the TCH for a few years, excited to make that drive again instead of the usual mind numbingly boring and ugly Yellowhead route
__________________
Short term pain for long term gain
Reply With Quote
     
     
  #652  
Old Posted Apr 22, 2017, 4:50 PM
canucklehead2 canucklehead2 is offline
Sex Marxist of Notleygrad
 
Join Date: Feb 2004
Location: YEG
Posts: 6,846
Still major traffic backups westbound east of Golden last time I went through there (Sept '16) mostly from semi trucks lumbering up the steep unimproved sections...
Reply With Quote
     
     
  #653  
Old Posted May 12, 2017, 3:32 AM
Bobert Bobert is offline
Registered User
 
Join Date: Feb 2016
Posts: 249
I posted this in the canada board highways thread, and wonder what you guys think

Quote:
How do you guys think they will twin the TCH through the Three Valley Gap area?

https://www.google.ca/maps/@50.9308124,-...YYPBNwg5sw04qQQ!2e0!7i13312!8i6656?hl=en

I wonder if they will use the cantilever design similar to the one near the Yoho Bridge in Kicking Horse.

I think I remember reading here that the lake can't be reclaimed because of DFO or some other environmental reason. Doesn't seem to be many other options other than blasting but that would be a massive slop stability challenge.
Reply With Quote
     
     
  #654  
Old Posted May 12, 2017, 6:05 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,407
^Yeah - good question.
I wonder if they would just re-route it altogether ?
Reply With Quote
     
     
  #655  
Old Posted May 12, 2017, 4:26 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,516
Quote:
Originally Posted by craner View Post
^Yeah - good question.
I wonder if they would just re-route it altogether ?
How about decking it? I can appreciate that would be a pig to build and keep the existing road going, though.
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
Reply With Quote
     
     
  #656  
Old Posted May 14, 2017, 4:57 AM
speedog's Avatar
speedog speedog is offline
Moran supreme
 
Join Date: Sep 2010
Posts: 2,579
Quote:
Originally Posted by craner View Post
^Yeah - good question.
I wonder if they would just re-route it altogether ?
To where?
__________________
Just a wee bit below average prairie boy in Canada's third largest city and fourth largest CMA
Reply With Quote
     
     
  #657  
Old Posted May 21, 2017, 7:48 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,098
Just noticed the Golden Donald Upper Road exit on TCH in Golden had been signed as "exit 780"... but its only about 320km from the last exit 411 at Pritchard... Are they intend to make the Trans-Canada 50km longer?
Reply With Quote
     
     
  #658  
Old Posted May 24, 2017, 7:42 PM
Teetos's Avatar
Teetos Teetos is offline
Registered User
 
Join Date: Apr 2014
Location: Westman (moved from Weston)
Posts: 1
Quote:
Originally Posted by nname View Post
Just noticed the Golden Donald Upper Road exit on TCH in Golden had been signed as "exit 780"... but its only about 320km from the last exit 411 at Pritchard... Are they intend to make the Trans-Canada 50km longer?
Allowance for future bypasses perhaps?
I also find it odd that exits east of Kamloops are numbered differently in either direction; I've seen plans for the Juniper-Valleyview realignment in that vicinity.
Reply With Quote
     
     
  #659  
Old Posted May 25, 2017, 3:38 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
For anyone travelling up hwy 5 north of Kamloops there are a couple of areas along the North Thompson where the shoulder has washed away, so expect delays around Cleareater and Blue River

And not really BC related but they're doing a massive amount of road work this summer through Jasper, it's going to be a very painful season. We're thinking we'll just avoid it altogether this year
__________________
Short term pain for long term gain
Reply With Quote
     
     
  #660  
Old Posted May 26, 2017, 6:49 PM
lubicon's Avatar
lubicon lubicon is offline
Suburban dweller
 
Join Date: Jun 2003
Location: Calgary - our road planners are as bad as yours Edmonton
Posts: 5,047
Quote:
Originally Posted by 240glt View Post
For anyone travelling up hwy 5 north of Kamloops there are a couple of areas along the North Thompson where the shoulder has washed away, so expect delays around Cleareater and Blue River

And not really BC related but they're doing a massive amount of road work this summer through Jasper, it's going to be a very painful season. We're thinking we'll just avoid it altogether this year
Don't you spend time in the BC Interior? If so, how do you propose getting there? Calgary>Banff>Kamloops wouldn't be much better. Lot's of construction here too plus heavier traffic would make for a shitty drive as well.
__________________
Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe.

Albert Einstein
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia
Forum Jump



Forum Jump


All times are GMT. The time now is 3:54 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.