Quote:
Originally Posted by esquire
I've always found it perplexing that upgrades are direly needed on so many existing routes in and around Winnipeg, yet CCW was the ambitious road project that actually got funded. CCW/101 must be the least-used interchange on the Perimeter.
|
CCW as a road made perfect sense. Inkster between 101 and Route 90 was a dangerous road before CCW and desperately needing to be twined. The CP main line also crossed the route and needed grade separation. There would also have been exportations of developed properties needed.
Separate from that there was an at-grade rail crossing on the Perimeter needing grade separation. Sasktchewan+101 was a signalled intersection which had been the location of some deadly accidents, not unlike Pipeline+101 now.
On top of all this the Headingley by-pass which has been on the books almost as long as 59N+101 interchange would need to connect up to the Perimeter somewhere.
The CCW project actually addressed all of these important issue. Sure it has some future proofing built into the road but part of that is the commercial truck traffic which is intended for CCW is still using other routes as phase 2, aka the Headingley by-pass, has yet to start construction.
This all brings a slight tear to my eye as there is a plan to tie the Red River Ex site traffic into CCW. Had IGF been built there as once proposed the traffic issues IGF has now would never have happened.