  #2861  
Old Posted Apr 9, 2017, 2:55 AM
Vaden Vaden is offline
Registered User
 
Join Date: Jun 2015
Posts: 107
Quote:
Originally Posted by arjay57 View Post
I don't know whether they are having trouble selling it or whether it just takes a little longer to sell high end homes. The luxe towers nearby are pretty full up, so I wouldn't be surprised if they sell these units, too.
I don't know either. I was just going by what ATL_J said. Seemed to know something about it. I hope it goes up too.
Reply With Quote
     
     
  #2862  
Old Posted Apr 9, 2017, 3:52 AM
nature's calling's Avatar
nature's calling nature's calling is offline
Registered User
 
Join Date: May 2009
Location: Pawnee
Posts: 460
Speak of the devil

per Portman's interview for the latest issue of The Atlantan. It seems Emerson is very a go and will be rising soon

http://i67.tinypic.com/25owjep.jpg
__________________
Call Kenny Loggins, because you're in the danger zone.
Reply With Quote
     
     
  #2863  
Old Posted Apr 9, 2017, 1:57 PM
Atlanta3000 Atlanta3000 is offline
BANNED
 
Join Date: Nov 2013
Location: Buckhead
Posts: 2,763
JPX Works - 3rd & Peachtree Condo???

http://kenbabinchak.com/works/the-bridges-at-riverside/
Reply With Quote
     
     
  #2864  
Old Posted Apr 9, 2017, 2:56 PM
arctk2014 arctk2014 is offline
Registered User
 
Join Date: Mar 2014
Posts: 885
Quote:
Originally Posted by Atlanta3000 View Post
JPX Works - 3rd & Peachtree Condo???

http://kenbabinchak.com/works/the-bridges-at-riverside/
If I'm not mistaken that's an old design for the project before they hired ODA to lead the design. MSTSD is the record (local) architect with ODA on both JPX towers.
Reply With Quote
     
     
  #2865  
Old Posted Apr 9, 2017, 8:19 PM
joecool joecool is offline
Ahhh... Kelly Clarkson!
 
Join Date: Dec 2002
Location: Atlanta
Posts: 869
Now THAT would have been a funny April fools joke!
Reply With Quote
     
     
  #2866  
Old Posted Apr 9, 2017, 10:59 PM
Libertarian's Avatar
Libertarian Libertarian is offline
Registered User
 
Join Date: Feb 2013
Posts: 1,430
(deleted)

Last edited by Libertarian; Apr 10, 2017 at 4:04 AM.
Reply With Quote
     
     
  #2867  
Old Posted Apr 9, 2017, 11:54 PM
ATL CTO ATL CTO is offline
Registered User
 
Join Date: Mar 2017
Posts: 74


OPUS Pre sales office has really come together the last few days. The amount of trucks and workmen on site has been much larger than usual.
Reply With Quote
     
     
  #2868  
Old Posted Apr 10, 2017, 1:11 PM
ATL_J's Avatar
ATL_J ATL_J is offline
Registered User
 
Join Date: Nov 2008
Location: Atlanta
Posts: 471
Quote:
Originally Posted by Vaden View Post
I don't know either. I was just going by what ATL_J said. Seemed to know something about it. I hope it goes up too.
I don't have any inside information, I just heard sales were slow, so intuitively thought that that could have been the issue. Also, having seen sales paces of other high end condo buildings, including resales, I am highly interested to see how Opus Place sells. 200 luxury units is a lot to sell and I know 10%, according to Curbed's recent article, have pre-sold, but that is only 20 units.
Reply With Quote
     
     
  #2869  
Old Posted Apr 10, 2017, 1:37 PM
Verge Verge is offline
Registered User
 
Join Date: Mar 2007
Location: Atlanta
Posts: 861
Quote:
Originally Posted by ATL_J View Post
I don't have any inside information, I just heard sales were slow, so intuitively thought that that could have been the issue. Also, having seen sales paces of other high end condo buildings, including resales, I am highly interested to see how Opus Place sells. 200 luxury units is a lot to sell and I know 10%, according to Curbed's recent article, have pre-sold, but that is only 20 units.
They may have a lower pre-sale ratio depending on their financing--
say 30%-40% vs 50%. Pure and utter speculation.
Reply With Quote
     
     
  #2870  
Old Posted Apr 10, 2017, 2:37 PM
Ant131531 Ant131531 is offline
Registered User
 
Join Date: Jan 2013
Location: Atlanta
Posts: 1,984
Quote:
Originally Posted by ATL_J View Post
I don't have any inside information, I just heard sales were slow, so intuitively thought that that could have been the issue. Also, having seen sales paces of other high end condo buildings, including resales, I am highly interested to see how Opus Place sells. 200 luxury units is a lot to sell and I know 10%, according to Curbed's recent article, have pre-sold, but that is only 20 units.
Surprised they've even sold 20 considering they haven't opened the sales office or did the open house(which is this month) yet. If they can sale 50 by the end of May, I think they can actually start construction in October.
Reply With Quote
     
     
  #2871  
Old Posted Apr 10, 2017, 2:47 PM
nature's calling's Avatar
nature's calling nature's calling is offline
Registered User
 
Join Date: May 2009
Location: Pawnee
Posts: 460
Latest renderings of Opus Place





__________________
Call Kenny Loggins, because you're in the danger zone.
Reply With Quote
     
     
  #2872  
Old Posted Apr 10, 2017, 3:28 PM
DNR's Avatar
DNR DNR is offline
Registered User
 
Join Date: Mar 2016
Posts: 474
Opus Place

I see a few more subtle changes in the design, although it still seems a little tall when compared to it's distant neighbors.

I suppose the new revisions will help draw attention away from the monotony of a slender glass box design.

I notice that balcony space will be at a premium with this design and I have to say, it seems more like an office tower than a condo building, especially when compared with the balcony space inherent in the development of other residential properties.

Maybe the formula for balcony space differs when comparing apartments and condos. Not really sure on that point.
Reply With Quote
     
     
  #2873  
Old Posted Apr 10, 2017, 4:20 PM
Atlriser's Avatar
Atlriser Atlriser is offline
Registered User
 
Join Date: May 2006
Location: Atlanta - Grant Park
Posts: 1,269
I don't think the height looks out of balance as portrayed. It's looks about right but very hard to tell given the angles presented in the pics. It's what 55 floors and floor height will be slightly higher than the apt towers going up around it I'm fairly certain. The top parapet wall appears to be about 25' taller than the final floor. Seems correct to me.
__________________
I live in my own little world but it's ok, they know me here!

The next time you are contemplating what the hell went wrong in your life, look in a mirror!
Reply With Quote
     
     
  #2874  
Old Posted Apr 10, 2017, 8:40 PM
DNR's Avatar
DNR DNR is offline
Registered User
 
Join Date: Mar 2016
Posts: 474
Quote:
Originally Posted by Atlriser View Post
I don't think the height looks out of balance as portrayed. It's looks about right but very hard to tell given the angles presented in the pics. It's what 55 floors and floor height will be slightly higher than the apt towers going up around it I'm fairly certain. The top parapet wall appears to be about 25' taller than the final floor. Seems correct to me.
Sorry, I meant to say that the 1180 office building behind the Opus tower did not seem to be in the appropriate scale which makes the Opus tower appear larger. The Pomenade building look to be about the correct scale, but 1180 Peachtree is smaller than reality - which made the proposed Opus building seem taller when compared to it.

Sorry for the confusion.
Reply With Quote
     
     
  #2875  
Old Posted Apr 11, 2017, 1:09 AM
arjay57 arjay57 is offline
Registered User
 
Join Date: Jun 2013
Posts: 792
The Opus design is a very sophisticated look that will be a superb addition to Midtown, both on the skyline and at the street.
Reply With Quote
     
     
  #2876  
Old Posted Apr 11, 2017, 2:09 PM
GeorgiaPeanuts GeorgiaPeanuts is offline
Registered User
 
Join Date: Sep 2014
Posts: 1,637
The Big Bethel Project in Sweet Auburn is moving forward with Benoit and Russell New Urban for a $120 million development. Paces Properties is also partnering to develop the retail in the GA state dorm phase.

Quote:
The project – to be built in four phases over four years – will include the rehabilitation of Bethel Towers, a new parking deck with up to 850 spaces, the development of a mixed-use 1,000-bed student housing complex with 30,000 square feet of retail, and the refurbishment of the church’s administrative offices along Auburn Avenue.
Quote:
The first phase will involve a complete renovation of Bethel Towers – a 180-unit residential tower that was built in 1971. All residents will have to be relocate during the reconstruction. Benoit said the decision to renovate the existing building rather than to demolish it and start anew will allow Big Bethel to provide affordable housing for its residents.

The first phase will cost between $15 million and $18 million, Benoit said.

The second phase is a parking deck in the center of the block to house between 800 and 850 cars, The deck will be available to the development and the general public. Benoit said the garage will cost between $15 million and $20 million.

The centerpiece of the development will be the third phase – a major residential development that will target students at Georgia State University.

The design envisions a pedestrian environment to encourage people to stroll along the project’s streets and hop on the Atlanta Streetcar that connects Ebenezer Baptist Church/King Center with Centennial Olympic Park.

That mixed-use phase will include about 30,000 square feet of retail that will be developed with Paces Properties. That phase is expected to cost between $60 million and $70 million.

The final phase will focus on four lots along the Auburn Avenue corridor for development of the church’s administrative space, ministry activity and additional retail. That includes a vacant lot as well as existing commercial space being used by the church.
Quote:
Big Bethel’s pastor – the Rev. John Foster - said: “It is not the intention of the developer or the church to demolish any of the properties but to retrofit them.”
http://www.bizjournals.com/atlanta/news/...-join-benoit-russell-on-120-million.html
Reply With Quote
     
     
  #2877  
Old Posted Apr 11, 2017, 3:37 PM
Street Advocate Street Advocate is offline
Registered User
 
Join Date: Oct 2015
Posts: 3,717
Quote:
Originally Posted by GeorgiaPeanuts View Post
The Big Bethel Project in Sweet Auburn is moving forward with Benoit and Russell New Urban for a $120 million development. Paces Properties is also partnering to develop the retail in the GA state dorm phase.
1,000 bed student housing will be a nice addition to the area. I disagree they need an 800+ space standalone parking deck, although I will say if they are replacing the existing parking deck they'd have a stronger case. It's a half mile to a MARTA station and on the streetcar, which is hopefully expanded along the EST soon.
Reply With Quote
     
     
  #2878  
Old Posted Apr 11, 2017, 9:59 PM
ATL CTO ATL CTO is offline
Registered User
 
Join Date: Mar 2017
Posts: 74


NCR Phase II has been busy building an excellent wood fort.
Reply With Quote
     
     
  #2879  
Old Posted Apr 12, 2017, 3:20 AM
Vaden Vaden is offline
Registered User
 
Join Date: Jun 2015
Posts: 107
I know this isn't a skyscraper, but I've been wondering why nothing has happened with the Rufus Rose house. There was a big deal when it was sold to someone with big plans for it, but so far nothing.
Reply With Quote
     
     
  #2880  
Old Posted Apr 12, 2017, 12:39 PM
ATLmangum's Avatar
ATLmangum ATLmangum is offline
Registered User
 
Join Date: Nov 2005
Posts: 804
Any updates from last nights DRC meeting in Midtown?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 2:25 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.