View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #7861  
Old Posted Apr 5, 2017, 11:23 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,202
Quote:
Originally Posted by jsbertram View Post
TBMs are rarely "thrown away" after a project because they are expensive to build.

They are usually dismantled at the extraction pit and shipped to a local storage yard where the owner has all the parts inspected, and where necessary repaired or reconditioned before the TBM is containerized and shipped off to the next project on its schedule.

It's next project may be across the city, across the province, across the country, across the continent, or across the ocean.

Scheduled projects for these machines can be assigned years in the future, and are constantly being adjusted as future projects arise (or flounder) with the changing political winds.
He says as Big Bertha is being sold for scrap...
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #7862  
Old Posted Apr 5, 2017, 11:27 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,582
Big Bertha is probably pretty unique at that diameter.

Quote:
Originally Posted by jsbertram View Post
TBMs are rarely "thrown away" after a project because they are expensive to build.

They are usually dismantled at the extraction pit and shipped to a local storage yard where the owner has all the parts inspected, and where necessary repaired or reconditioned before the TBM is containerized and shipped off to the next project on its schedule.

It's next project may be across the city, across the province, across the country, across the continent, or across the ocean.

Scheduled projects for these machines can be assigned years in the future, and are constantly being adjusted as future projects arise (or flounder) with the changing political winds.
Yeah, also depends on whether the TBM is purchased by the contractor or rented.
The TBMs for the Canada Line were rented, and their next job was apparently in Russia.
     
     
  #7863  
Old Posted Apr 5, 2017, 11:53 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:26 AM.
     
     
  #7864  
Old Posted Apr 6, 2017, 1:34 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Alex Mackinnon View Post
He says as Big Bertha is being sold for scrap...
There isn't a lot of demand for a 60' diameter custom-made pressure-balanced TBM that can create 4 lanes (2 in each direction) of traffic.

I don't know of a need for 60' tunnels for any other purpose (traffic, trains, sewers, water, subways)

However, instead of scrapping it, bring it to Vancouver and build a new Highway 99 tunnel from Richmond to N.Vancouver. We'll need it after the new 8-lane Massey bridge opens.

Last edited by jsbertram; Apr 6, 2017 at 1:45 AM.
     
     
  #7865  
Old Posted Apr 6, 2017, 1:46 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Reecemartin View Post
Hopefully TBMs will be in the ground relatively soon, they are probably the biggest barrier in terms of time.
Nothing will happen until Translink and Mayors Council announces they have the last 20% of the funding sorted out.
     
     
  #7866  
Old Posted Apr 6, 2017, 2:17 AM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:26 AM.
     
     
  #7867  
Old Posted Apr 6, 2017, 2:25 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Reecemartin View Post
Of course, hopefully that's coming relatively soon though. The next decade is going to be very interesting for Vancouver Transit because we will be seeing tons of Bus route expansion, new rolling stock, and multiple simultaneous rapid transit projects.
Especially with the 15% tax on foreign buyers.
     
     
  #7868  
Old Posted Apr 6, 2017, 3:11 AM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:26 AM.
     
     
  #7869  
Old Posted Apr 6, 2017, 3:32 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Reecemartin View Post
I wasn't aware that funding transit was something that money was intended for, it's certainly interesting.

It's good to see that we are seeing global improvements, I can rave about Torontos projects all day, but they are just that individual projects rather than global service improvements. However I'd still like to see improved night service.

The sooner we see shovels in the ground for the M Ext the better.
They may not have said it, but it will be used to help pay for it.

I really wish that in the major cities that have rail transit that once one line is complete, shovels are in the ground for the next one.

I cannot think of a major city in Canada that would not need this kind of construction.
     
     
  #7870  
Old Posted Apr 6, 2017, 4:34 AM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,599
Quote:
Originally Posted by swimmer_spe View Post
They may not have said it, but it will be used to help pay for it.
The province collects that tax. Nothing to do with the municipality's 20% share of the cost.
     
     
  #7871  
Old Posted Apr 6, 2017, 4:48 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,935
Maybe people are referring to the empty house charge being done by the city of Vancouver?
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #7872  
Old Posted Apr 6, 2017, 4:56 AM
urbancanadian urbancanadian is offline
Registered User
 
Join Date: Aug 2014
Location: Vancouver
Posts: 713
I'm confused... with the Province's recent announcement, isn't the municipal share now 10%? I had thought the Feds were committed to 50% and the Province to one third (33%), which they now upped to 40%.

50+40=90%

Or am I wrong on something?
     
     
  #7873  
Old Posted Apr 6, 2017, 4:57 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,935
Feds are 40, province is 40, so 20% left.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #7874  
Old Posted Apr 6, 2017, 5:02 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by urbancanadian View Post
I'm confused... with the Province's recent announcement, isn't the municipal share now 10%? I had thought the Feds were committed to 50% and the Province to one third (33%), which they now upped to 40%.

50+40=90%

Or am I wrong on something?
Yeah, at some point the feds lowered their share from the 50% promised in the election to 40% without anybody saying a word about it
     
     
  #7875  
Old Posted Apr 6, 2017, 5:09 AM
urbancanadian urbancanadian is offline
Registered User
 
Join Date: Aug 2014
Location: Vancouver
Posts: 713
Oh fuck, well that's infuriating. Thanks for the info I guess...
     
     
  #7876  
Old Posted Apr 7, 2017, 7:26 AM
flipper316 flipper316 is online now
Registered User
 
Join Date: Dec 2016
Posts: 887
Quote:
Originally Posted by s211 View Post
I hope not. That's a very wide intersection, and has some of the most lazy-assed, entitled pedestrians taking their sweet time to cross. As a frequent pedestrian in that area, it's embarrassing to watch.
Not too mention very late left turners and slow red light runners and general piss poor lane discipline. Example just blatantly cars turning into the wrong lane. Was a gong show watching that intersection when I worked at Canada Line.
     
     
  #7877  
Old Posted Apr 7, 2017, 4:57 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,202
Quote:
Originally Posted by jsbertram View Post
There isn't a lot of demand for a 60' diameter custom-made pressure-balanced TBM that can create 4 lanes (2 in each direction) of traffic.

I don't know of a need for 60' tunnels for any other purpose (traffic, trains, sewers, water, subways)

However, instead of scrapping it, bring it to Vancouver and build a new Highway 99 tunnel from Richmond to N.Vancouver. We'll need it after the new 8-lane Massey bridge opens.
I'd like that, but many people think the TBM was the problem. We'll hear in a couple years when all the lawsuits get settled.

Refurbing a used TBM isn't much cheaper than buying new. Unless a contractor has an ideal machine and they want to reduce their construction lead time, they'll probably go new just to control the risk unless the machine is in really good shape.

The lead time for a new TBM is about a year currently.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #7878  
Old Posted Apr 7, 2017, 5:06 PM
TransitFreak TransitFreak is offline
Registered User
 
Join Date: Oct 2009
Posts: 194
Quote:
Originally Posted by Alex Mackinnon View Post

The lead time for a new TBM is about a year currently.
Hmmmm, so Broadway subway line tunneling section to begin Jan 2019 once all soil conditions analyzed by end of 2017? Could start the elevated section right away from VCC-Clark to get the schedule accelerated

Given current configuration of VCC-Clark, does anyone think that the third track to the side will dump down to a storage facility at grade and have a mini OMC in the industrial areas? Set up similar to Canada Line and their OMC. This is the last vestige of space before the tunneling section to Arbutus and future to UBC
     
     
  #7879  
Old Posted Apr 7, 2017, 6:49 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by TransitFreak View Post
Given current configuration of VCC-Clark, does anyone think that the third track to the side will dump down to a storage facility at grade and have a mini OMC in the industrial areas? Set up similar to Canada Line and their OMC. This is the last vestige of space before the tunneling section to Arbutus and future to UBC
It's very doubtful they'd do that. I don't think TransLink owns any land in the railyards.

What could be cool would be an elevated platform over the existing railyard with 5 or 6 tracks capable of storing some trains.
__________________
In the heart of a busy metropolis skyscrapers are a vivid reminder of the constant yearning of the human spirit to rise to God
     
     
  #7880  
Old Posted Apr 7, 2017, 7:35 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:26 AM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:36 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.