HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #6141  
Old Posted Mar 17, 2017, 6:55 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
Quote:
Originally Posted by acottawa View Post
It's the local neighbourhood route for manor park. It gets of the main street to go north at at Birch, heads east on Sandridge and then south on the residential portion at St. Laurent before catching up with the main street again at the Dairy Queen.
At the point you call "catching up" it is moving in the same direction on the same street.

Quote:
There's nothing wrong with that, but if someone were on St. Laurent looking to get to Rideau, there is no clue in OC Transpo's categorization of routes that the "frequent" 14 will head to Rideau by fairly direct means while the "frequent" 7 will head to Rideau by very indirect means.
That problem, to the extent that it is a problem, which isn't much, already exists now.

Major destinations or transfer points are the origin/terminus for multiple routes. That's a feature, not a bug.

I really don't get the fetishization around these parts for ironing all the useful kinks out of trunk routes that cannot physically avoid those kinks. Yes, by all means straighten routes that (a) can be, and (b) need to be, but we've pretty well done all of that straightening and simplification already. Any more that is done, is at the expense of service.
Reply With Quote
     
     
  #6142  
Old Posted Mar 24, 2017, 1:01 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,801
There is a new image of the Rapid & Frequent Route network on the OC site:



From the image it looks like:

Current 1 -> 6 (South Keys-Downtown); 10 (Downtown-Rockcliffe)
Current 4 -> 8 (Hurdman-Carleton-Gatineau)
Current 7 -> 7 (Downtown-Carleton-Baseline); 17 (Downtown-St Laurent)
Current 8 -> 44 (Billings-Hurdman)
Current 14-> 14, modified to end at Tunney's in the west end. Carlington section becomes route 53 (Carlington-Tunney's)
Current 16-> 51
Current 87-> 57 (Baseline-Tunney's); 90 (South Keys-Hurdman)
Current 94-> 74 (Riverview-Tunney's); 25 (Blair-Millenium)
Current 95-> 75 (Barrhaven-Tunney's); 39 (Blair-Trim plus extension to Millenium)
Current 97-> 59 (Bells Corners-Tunney's); 97 (Airport-Hurdman)
Current 106->45 (looks like it will be re-routed along hew Hospital Link road and may end at the hospital instead of Elmvale)
Current 111->7
Current 114->40

The map seems to show that the new split routes from the east (10, 17) will end downtown, likely at Bank St. similar to the 19.
Reply With Quote
     
     
  #6143  
Old Posted Mar 24, 2017, 4:31 PM
hwy418 hwy418 is offline
Registered User
 
Join Date: Jun 2013
Posts: 410
Wonder why they didn't use elongated hexagonal shape for the "Frequent Routes" on this map...
Reply With Quote
     
     
  #6144  
Old Posted Mar 24, 2017, 4:40 PM
FFX-ME's Avatar
FFX-ME FFX-ME is offline
Registered User
 
Join Date: Oct 2006
Posts: 1,053
It seems like a better airport link connection would be to rail over the current 97 BRT route. I guess the spur could always be extended in the future. From Hurdman it could then perhaps go downtown. Under that scenario the Ottawa metro would have a layout similar to Rome.
Reply With Quote
     
     
  #6145  
Old Posted Mar 24, 2017, 4:53 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,930
Quote:
Originally Posted by Uhuniau View Post
At the point you call "catching up" it is moving in the same direction on the same street.



That problem, to the extent that it is a problem, which isn't much, already exists now.

Major destinations or transfer points are the origin/terminus for multiple routes. That's a feature, not a bug.

I really don't get the fetishization around these parts for ironing all the useful kinks out of trunk routes that cannot physically avoid those kinks. Yes, by all means straighten routes that (a) can be, and (b) need to be, but we've pretty well done all of that straightening and simplification already. Any more that is done, is at the expense of service.
I made a comment that the frequent routes weren't very frequent. Somebody made the point that even if not frequent they provide a more direct routing. I made the point that they don't (at least not on a consistent basis) and provided an example.
Reply With Quote
     
     
  #6146  
Old Posted Mar 24, 2017, 6:23 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,801
Quote:
Originally Posted by FFX-ME View Post
It seems like a better airport link connection would be to rail over the current 97 BRT route. I guess the spur could always be extended in the future. From Hurdman it could then perhaps go downtown. Under that scenario the Ottawa metro would have a layout similar to Rome.
I think it is more likely that the Trillium line will be truncated to end at the Airport (becoming Airport-Bayview or Airport-Gatineau) and the LRT to Riverside South will become electrified and extended along the SE Transitway to Hurdman.

I can't foresee there being appetite in the future to shut down the Trillium line in its entirety to double-track and electrify it. Population growth in the south will eventually necessitate a double-tracked, electrified line.

It should be possible to double-track and electrify the line south of South Keys without shutting down the rail service for an extended period.
Reply With Quote
     
     
  #6147  
Old Posted Mar 24, 2017, 7:15 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
Quote:
Originally Posted by bradnixon View Post
From the image it looks like:

Current 1 -> 6 (South Keys-Downtown); 10 (Downtown-Rockcliffe)
Current 4 -> 8 (Hurdman-Carleton-Gatineau)
Current 7 -> 7 (Downtown-Carleton-Baseline); 17 (Downtown-St Laurent)
Current 8 -> 44 (Billings-Hurdman)
Current 14-> 14, modified to end at Tunney's in the west end. Carlington section becomes route 53 (Carlington-Tunney's)
Current 16-> 51
Current 87-> 57 (Baseline-Tunney's); 90 (South Keys-Hurdman)
Current 94-> 74 (Riverview-Tunney's); 25 (Blair-Millenium)
Current 95-> 75 (Barrhaven-Tunney's); 39 (Blair-Trim plus extension to Millenium)
Current 97-> 59 (Bells Corners-Tunney's); 97 (Airport-Hurdman)
Current 106->45 (looks like it will be re-routed along hew Hospital Link road and may end at the hospital instead of Elmvale)
Current 111->7
Current 114->40

The map seems to show that the new split routes from the east (10, 17) will end downtown, likely at Bank St. similar to the 19.
Awesome! So many transfer penalties to just get from one central neighbourhood to another!

A "rapid" or "Frequent" network that inserts time-penalties, depending on time of day and week, of up to half an hour (assuming the buses are even running on time), into what is currently a seamless trip, is neither rapid nor frequent.

And there is still absolutely nothing in any project or budget envelope that I have seen to suggest that there will be any TPMs on any major downtown trunk route. No lanes, no queue-jumps, no smart signals. Nothing. Just the same dumb bus transit that has existed since the streetcars were pulled out.
Reply With Quote
     
     
  #6148  
Old Posted Mar 24, 2017, 7:19 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
Quote:
Originally Posted by acottawa View Post
I made a comment that the frequent routes weren't very frequent. Somebody made the point that even if not frequent they provide a more direct routing. I made the point that they don't (at least not on a consistent basis) and provided an example.
Except that route 7 is not a terribly good example of an "indirect" routing.

Oh well; i look forward to all the new "direct" routings on the downtown routes, with the attendant increase in time that OC Transpo is stealing from downtown transit users by spliting useful routes up into useless shorter segments and forcing us to wait and wait and wait and wait to continue trips from one neighbourhood to another that are, or until recently were, seamless and trouble-free.
Reply With Quote
     
     
  #6149  
Old Posted Mar 24, 2017, 7:20 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
Quote:
Originally Posted by bradnixon View Post
There is a new image of the Rapid & Frequent Route network on the OC site:
Also, that's a diagram: Anyone seen a map?

And not just a diagram: a really crappy one that doesn't unambiguously show where the routes originate/terminate.
Reply With Quote
     
     
  #6150  
Old Posted Mar 24, 2017, 7:28 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
Also, looks like the No Buses on Wellington Fetishists are getting their way: the experience of moving in a vehicle past the iconic seat of Canadian democracy is now reserved for private automobiles.
Reply With Quote
     
     
  #6151  
Old Posted Mar 24, 2017, 7:37 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
Quote:
Originally Posted by FFX-ME View Post
From Hurdman it could then perhaps go downtown.
Or north along the Vanier Parkway to irrigate some of the mass-transit desert in the downtown east end that has been created by transit policy, and will be perpetuated for a century or more as we continue to spend all our resources extending LRT further and further out into the suburbs.
Reply With Quote
     
     
  #6152  
Old Posted Mar 25, 2017, 1:08 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Notice that Route 14 east and west do not connect at the same Confederation Line station.

I find it strange that Route 7 and 111 are going to be connected. The route is so indirect, that I can't imagine significant through ridership.
Reply With Quote
     
     
  #6153  
Old Posted Mar 25, 2017, 1:51 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by lrt's friend View Post
Notice that Route 14 east and west do not connect at the same Confederation Line station.

I find it strange that Route 7 and 111 are going to be connected. The route is so indirect, that I can't imagine significant through ridership.
Route 14 being disconnected is a glitch in the map, I think. Whenever a route is split, it's always given two different route numbers. 14 looks to be a through route from St. Laurent through Overbrook/Vanier down Rideau, then down Gladstone. The difference is that 14 will no longer go down to Carlington, instead when it hits Parkdale, it will turn north at end at Tunney's, with a new route 53 covering the old Carlington portion. In other words--the 14 is being split in two at Gladstone & Parkdale with each half continuing to Tunney's Pasture station.
Reply With Quote
     
     
  #6154  
Old Posted Mar 25, 2017, 2:23 AM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,801
Quote:
Originally Posted by hwy418 View Post
Wonder why they didn't use elongated hexagonal shape for the "Frequent Routes" on this map...
Looks like they've corrected this in the source image!

There other glitches in the diagram as some have pointed out:
  • the 14 east and west of downtown aren't connected
  • the 12 and 14 are shown as separate linest even though both use Rideau St.
Reply With Quote
     
     
  #6155  
Old Posted Mar 25, 2017, 2:55 AM
DarthVader_1961 DarthVader_1961 is offline
Registered User
 
Join Date: Jun 2009
Posts: 480
Finally stopping the stupidity of having the 97 go all the way to Bells Corners.

What is meant by rapid/frequent? Every 15 minutes?
Reply With Quote
     
     
  #6156  
Old Posted Mar 27, 2017, 3:01 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
Quote:
Originally Posted by 1overcosc View Post
Route 14 being disconnected is a glitch in the map, I think. Whenever a route is split, it's always given two different route numbers. 14 looks to be a through route from St. Laurent through Overbrook/Vanier down Rideau, then down Gladstone. The difference is that 14 will no longer go down to Carlington, instead when it hits Parkdale, it will turn north at end at Tunney's, with a new route 53 covering the old Carlington portion. In other words--the 14 is being split in two at Gladstone & Parkdale with each half continuing to Tunney's Pasture station.
This entire thing is sloppy. It needs to be withdrawn and replaced, at least from a pure graphic design perspective, to say nothing of a transit design perspective.

Does anyone involved in this actually use the public transit system they are toying with? Or any other public transit system, for that matter? This garbage graphic is not something that anyone who actually uses transit in their daily life would ever have allowed to see daylight.
Reply With Quote
     
     
  #6157  
Old Posted Mar 27, 2017, 3:02 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
Quote:
Originally Posted by DarthVader_1961 View Post
Finally stopping the stupidity of having the 97 go all the way to Bells Corners.
What's stupid about that? Bells Corners has had really bad transit access since the last redrawing of the map.
Reply With Quote
     
     
  #6158  
Old Posted Mar 27, 2017, 3:04 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
There is a segment southeast of Baseline, below the "88" hexagon, without a label of its own.

What is that?
Reply With Quote
     
     
  #6159  
Old Posted Mar 27, 2017, 4:08 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,801
Quote:
Originally Posted by Uhuniau View Post
There is a segment southeast of Baseline, below the "88" hexagon, without a label of its own.

What is that?
It's the current 111.

My guess is that the plan is to re-number it as an extension of the 7 from Carleton.
Reply With Quote
     
     
  #6160  
Old Posted Mar 27, 2017, 4:53 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
Quote:
Originally Posted by bradnixon View Post
It's the current 111.
Why would a map of the future rapifrequent network show the current route, and why is it not labelled?

Quote:
My guess is that the plan is to re-number it as an extension of the 7 from Carleton.
A good graphic or diagram or map does not leave its intended audience guessing as to its meaning.

I interpret the same image as showing the 7 terminating/originating at Cartoon U.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 3:23 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.