With all of these LRT stations skirting the edges of the Beltline wouldn't the easy solution be to just have a looping bus that runs the length of 17th ave but also hits the stampede station, the Kirby station, and zigzags across 7th ave a few times?
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
Reply With Quote
     
     
  #1442  
Old Posted Mar 7, 2017, 9:33 PM
Corndogger Corndogger is offline
Registered User
 
Join Date: Sep 2007
Location: Calgary
Posts: 7,727
Quote:
Originally Posted by UofC.engineer View Post
Fair enough. But we need to consider the benefits grade separation in a high density area. I'd like to see a high quality final product.

As the famous poster Chadillac used to say on the dreaded Canada forums "The Greenline will be completely grade separated from 24th ave N to Lynnwood station. About 13kms!"(Assuming the CPR goes through with their plan to close the 8th street crossing).

To me it's lunacy not to use the CPR right of way to 4th ave. After 4th ave they can start tunneling and go below the Red line.

We have about 275m to get below the Red line tunnel.

https://www.google.ca/maps/@51.0433308,-114.0562165,258m/data=!3m1!1e3
See bold part above--totally agree, especially with the amounts of money being discussed.
Reply With Quote
     
     
  #1443  
Old Posted Mar 7, 2017, 11:25 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by DizzyEdge View Post
With all of these LRT stations skirting the edges of the Beltline wouldn't the easy solution be to just have a looping bus that runs the length of 17th ave but also hits the stampede station, the Kirby station, and zigzags across 7th ave a few times?
Agreed. Along with bike lanes.
Reply With Quote
     
     
  #1444  
Old Posted Mar 8, 2017, 5:01 AM
WilcoRogers WilcoRogers is offline
Registered User
 
Join Date: Mar 2016
Location: Beltline, Calgary
Posts: 4
Quote:
Originally Posted by Boris2k7 View Post
Willem put up a great blog post about the Green Line a couple days ago. Go check it out.

http://www.spuryyc.org/the-green-line-through-the-lens-of-density/
Glad you enjoyed it! Thanks for posting.
Reply With Quote
     
     
  #1445  
Old Posted Mar 8, 2017, 7:01 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,419
Quote:
Originally Posted by outoftheice View Post
Don't forget that a lot of households have two people who are working in them so although one of the two may work downtown and can easily walk to work, there is a good chance that the other may work outside of the downtown core. The fact should not be lost that the Green Line will service Aurora Business Park, Quarry Park and Seton and all three are destined to become major employment hubs in their own right. This is in addition to the fact that the Green Line will offer a quick connect to the airport which is already a major employment hub. I wouldn't be surprised to see beltline residents traveling opposite the traditional rush hour commuter pattern when using the Green Line however accessibility to residents (by moving the line south to 12th Ave) will be a key component in whether or not this occurs.
It will ? With bus service from one of the stations ?
Reply With Quote
     
     
  #1446  
Old Posted Mar 8, 2017, 8:27 AM
sim sim is offline
Registered User
 
Join Date: Aug 2008
Posts: 863
Quote:
Originally Posted by Boris2k7 View Post
But this is not the case east of Macleod Trail. There's only 10th, 11th, and 12th. 10th cuts off at 4th Street and 11th cuts off at 6th Street. All current and proposed residential development is between 11th and 12th.
So use 11 Ave, and the north south roads. Or since all those sites are basically nothing at the moment, look at more dedication for extra ROW for precious vehicles.

We are so fixated on believing that vehicle access needs to be ultra-convenient and from every direction, even given the fact that there would be an LRT right there.

It'll be a good day when people start having the same level of concern for other means of access. We'll finally have overcome a massive institutionalized bias in favour of vehicle access.
Reply With Quote
     
     
  #1447  
Old Posted Mar 8, 2017, 8:50 AM
outoftheice outoftheice is offline
Registered User
 
Join Date: Jan 2009
Posts: 914
Quote:
Originally Posted by craner View Post
It will ? With bus service from one of the stations ?
Yup. As far as I know the short term plan is for the 300 airport express route to terminate at the 96th Ave Green Line station instead of continuing on downtown as it does now. This would allow it to operate as a high frequency shuttle service between the airport and the Green Line. Long term the Route Ahead vision is for the 300 to be replaced by either a spur line or (more likely) some sort of automated people mover that one finds at places such as Gatwick Airport. In fact if you look at the latest official Green Line map produced by the City of Calgary (found on page 6 of this pdf http://www.calgary.ca/Transportation/TI/...y-public-meeting-presentation-slides.pdf ) you'll see the airport link is now included as part of the Green Line vision.
Reply With Quote
     
     
  #1448  
Old Posted Mar 8, 2017, 4:08 PM
Electrical Storm's Avatar
Electrical Storm Electrical Storm is offline
Registered User
 
Join Date: Apr 2013
Location: Calgary, AB
Posts: 928
Quote:
Originally Posted by WilcoRogers View Post
Glad you enjoyed it! Thanks for posting.
Really great read! Thanks
Reply With Quote
     
     
  #1449  
Old Posted Mar 8, 2017, 8:05 PM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,419
Quote:
Originally Posted by outoftheice View Post
Yup. As far as I know the short term plan is for the 300 airport express route to terminate at the 96th Ave Green Line station instead of continuing on downtown as it does now. This would allow it to operate as a high frequency shuttle service between the airport and the Green Line. Long term the Route Ahead vision is for the 300 to be replaced by either a spur line or (more likely) some sort of automated people mover that one finds at places such as Gatwick Airport. In fact if you look at the latest official Green Line map produced by the City of Calgary (found on page 6 of this pdf http://www.calgary.ca/Transportation/TI/...y-public-meeting-presentation-slides.pdf ) you'll see the airport link is now included as part of the Green Line vision.
Thanks for posting that - very interesting.
Reply With Quote
     
     
  #1450  
Old Posted Mar 9, 2017, 12:44 AM
Boris2k7's Avatar
Boris2k7 Boris2k7 is offline
Majestic
 
Join Date: Sep 2005
Location: Calgary
Posts: 11,960
Quote:
Originally Posted by sim View Post
So use 11 Ave, and the north south roads. Or since all those sites are basically nothing at the moment, look at more dedication for extra ROW for precious vehicles.

We are so fixated on believing that vehicle access needs to be ultra-convenient and from every direction, even given the fact that there would be an LRT right there.

It'll be a good day when people start having the same level of concern for other means of access. We'll finally have overcome a massive institutionalized bias in favour of vehicle access.
There are already two nearby LRT lines, an existing bike lane, and a proposed bike lane. A surface alignment on 12th would jeopardize at least one of those investments. Again, only a single road which connects all the way through this part of the community, and that's the one you want to compromise for a surface line?
__________________
"The only thing that gets me through our winters is the knowledge that they're the only thing keeping us free of giant ass spiders." -MonkeyRonin

Flickr
Reply With Quote
     
     
  #1451  
Old Posted Mar 9, 2017, 3:44 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,419
$480M surface vs $600M underground - no contest, put it underground.
Reply With Quote
     
     
  #1452  
Old Posted Mar 9, 2017, 3:59 AM
Corndogger Corndogger is offline
Registered User
 
Join Date: Sep 2007
Location: Calgary
Posts: 7,727
Quote:
Originally Posted by craner View Post
$480M surface vs $600M underground - no contest, put it underground.
Totally agree. Having it underground allows for a lot more options for what you can do in the area.
Reply With Quote
     
     
  #1453  
Old Posted Mar 9, 2017, 4:28 AM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by craner View Post
$480M surface vs $600M underground - no contest, put it underground.
Okay - so the difference is basically the value of a 30 floors building in downtown ... to put one station underground.
Reply With Quote
     
     
  #1454  
Old Posted Mar 9, 2017, 4:43 AM
mytwocents mytwocents is offline
Registered User
 
Join Date: Dec 2016
Location: Calgary
Posts: 113
Quote:
Originally Posted by craner View Post
$480M surface vs $600M underground - no contest, put it underground.
Class 5 estimate I think it said so still preliminary. Could be up to 1.2 billion.
Reply With Quote
     
     
  #1455  
Old Posted Mar 9, 2017, 5:00 AM
PPAR's Avatar
PPAR PPAR is offline
Registered User
 
Join Date: Jul 2006
Posts: 604
Quote:
Originally Posted by mytwocents View Post
Class 5 estimate I think it said so still preliminary. Could be up to 1.2 billion.
Only if the Province drags their feet so long that another oil boom comes around...
Reply With Quote
     
     
  #1456  
Old Posted Mar 9, 2017, 2:14 PM
WilcoRogers WilcoRogers is offline
Registered User
 
Join Date: Mar 2016
Location: Beltline, Calgary
Posts: 4
Quote:
Originally Posted by suburbia View Post
Okay - so the difference is basically the value of a 30 floors building in downtown ... to put one station underground.
Remember this is a train that may eventually carry 90,000+ people a day. While comparing it to "floors in a building" is kind of a non-starter, I don't think it's a bad investment.
Reply With Quote
     
     
  #1457  
Old Posted Mar 9, 2017, 5:42 PM
DoubleK DoubleK is offline
Near Generational
 
Join Date: Sep 2011
Location: Calgary
Posts: 1,447
Quote:
Originally Posted by mytwocents View Post
Class 5 estimate I think it said so still preliminary. Could be up to 1.2 billion.
Class 5 is not the same as preliminary.
Reply With Quote
     
     
  #1458  
Old Posted Mar 9, 2017, 5:48 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by WilcoRogers View Post
Remember this is a train that may eventually carry 90,000+ people a day. While comparing it to "floors in a building" is kind of a non-starter, I don't think it's a bad investment.
Suggesting that 90,000+ people a day all get some level of benefit from the extra minimum $120M to put one station underground in the Beltline is illogical and a disingenuous statement. I think people suggesting it is not much money is problematic, and placing the "added value" (which is debatable in the first place) against something more tangible was an attempt to get people back to reality. This is not money that comes out of the blue, rather, is from the public purse. It also isn't the difference between the train servicing the Beltline or not, but is just about surface or underground, with both servicing the area quite well IMHO. If here we were talking about $120M to the owners of the Flames for a stadium, people would be upset (including me). The added (non-value IMHO) of going underground doesn't add up to $120,000,000.00. I wouldn't want my tax dollars going to this material increase in cost for no added service and limited added value. That's a lot of money that we do not have.
Reply With Quote
     
     
  #1459  
Old Posted Mar 9, 2017, 6:17 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,635
We spent the same amount a decade ago to put the Westbrook Station and line segment underground versus elevated.

Money well spent due to context for this section of the Greenline, especially to avoid cross Macloed and 1st St SE at grade, both 26,000 Vehicles/Day crossings, effectively one 52,000 Vehicles/Day road, which is the equivalent of the west line crossing Sarcee Trail at grade. Added benefits of urbanness and whatnot, and maintaining other cycling/road infrastructure.
Reply With Quote
     
     
  #1460  
Old Posted Mar 10, 2017, 1:17 AM
mytwocents mytwocents is offline
Registered User
 
Join Date: Dec 2016
Location: Calgary
Posts: 113
l totally don't know how to delete this haha.

Last edited by mytwocents; Mar 10, 2017 at 2:04 AM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:57 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.