A little bit of an update from the city of Moncton website regarding the events centre. This is from January.
PROJECT BY NUMBERS
- One trip around the concourse level is in excess of 350m.
- To date the contractor has completed over 500 QA/QC (quality) inspections.
- The main lobby ceiling is over 5m high.
- There is over 250 m of catwalk in the roof trusses overlooking the arena bowl.
-
There will be over 60 TV’s throughout the building.
- There are over 80 slab inserts in the ice slab concrete. These are used as anchor points for various shows.
- Over 133,000 man hours have been involved in building the facility to date.
- There are approximately 110 people working on the site daily.
INTERESTING FACTS
1) There will be acoustic “lapendary” (sound absorbing) panels hung from the top of the trusses.
2)
There will be a type of electronic signage on the east and west sides of the bowl.
3) The building is designed to host both end stage or center stage concerts.
I outlined the most interesting morsels of information in red.
Here are a few photos from the most recent update:

This shows what the concourse will look like (especially the width).

Back end of the corporate box level, overlooking the club lounge.

Main entrance lobby and atrium

The arena from the concourse level near the second floor of the atrium