HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces


Reply

 
Thread Tools Display Modes
     
     
  #841  
Old Posted Mar 2, 2017, 1:12 PM
Scarface Scarface is offline
Registered User
 
Join Date: Jun 2015
Posts: 1,514
Personally if this is an attempted to slim down traffic as it sounds I don't see why they would not have on/off ramps going in either direction from Industrielle. It seems like a no brainer to me.

But of course that is just me.
Reply With Quote
     
     
  #842  
Old Posted Mar 2, 2017, 2:37 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,159
Quote:
Originally Posted by L'homard View Post
There will be no westbound exit on to 15 from Industrial St., at least not for the foreseeable future.
There were a couple of more tidbits regarding the dogbone interchange project at Harrisville/Dieppe Blvd & Highway 15 in the T&T today.

- Construction will begin this summer, but will require three years to complete.
- The only work being done at Industrielle/Highway 15 will be an eastbound off ramp. The minister of transportation said there would "eventually" be a eastbound on ramp as well, but that this is not in the cards right now. There will be no overpass over Highway 15, and no connection to the westbound lanes of Highway 15.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #843  
Old Posted Mar 2, 2017, 2:46 PM
mylesmalley's Avatar
mylesmalley mylesmalley is offline
Moderator / Supervillain
 
Join Date: Aug 2007
Location: Moncton, NB
Posts: 4,102
I often wonder if the huge inconvenience of shutting a street / overpass entirely for a season is preferable to the major inconvenience of dragging the work out over a longer period of time.

I don't recall the widening of Mapleton a few years ago taking more than a summer. Moreover they managed to completely rebuild the Regent Street overpass in Fredericton last year...
__________________
"When you go home tonight, there's gonna be another story on your house! "
Reply With Quote
     
     
  #844  
Old Posted Mar 2, 2017, 2:57 PM
Sunnybrae's Avatar
Sunnybrae Sunnybrae is online now
Registered User
 
Join Date: Jun 2010
Posts: 752
Quote:
Originally Posted by mylesmalley View Post
I often wonder if the huge inconvenience of shutting a street / overpass entirely for a season is preferable to the major inconvenience of dragging the work out over a longer period of time.

I don't recall the widening of Mapleton a few years ago taking more than a summer. Moreover they managed to completely rebuild the Regent Street overpass in Fredericton last year...
Well I would sooner have them not close down the causeway and take longer. That's going to be a royal pain. They better make some traffic plans at the bridge crossing.
Reply With Quote
     
     
  #845  
Old Posted Mar 3, 2017, 4:13 AM
BlackYear's Avatar
BlackYear BlackYear is offline
Registered User
 
Join Date: Jan 2009
Posts: 1,279
From Global News:

Moncton’s Harrisville Boulevard interchange to see traffic improvements with new overpass.

http://globalnews.ca/news/3281580/moncto...ts-with-new-overpass/?platform=hootsuite

Reply With Quote
     
     
  #846  
Old Posted Mar 15, 2017, 11:57 AM
habs33's Avatar
habs33 habs33 is offline
Registered User
 
Join Date: Aug 2008
Location: Moncton NB
Posts: 641
The new Dollarama on Elmwood appears to be open.
Reply With Quote
     
     
  #847  
Old Posted Mar 17, 2017, 12:26 AM
micks5477's Avatar
micks5477 micks5477 is offline
Registered User
 
Join Date: Mar 2013
Location: Moncton
Posts: 371
McLaughlin Place sign

New McLaughlin Place sign is up on Morton Avenue

Reply With Quote
     
     
  #848  
Old Posted Mar 17, 2017, 1:02 AM
Monctoncore Monctoncore is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,274
Quote:
Originally Posted by micks5477 View Post
New McLaughlin Place sign is up on Morton Avenue

Very nice! That's the type of signs we should see in front of developments like that.
Reply With Quote
     
     
  #849  
Old Posted Mar 17, 2017, 3:15 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,159


It is a nice sign. I thought they were going to change the name of this plaza to "Morton Place".........
__________________
Go 'Cats Go
Reply With Quote
     
     
  #850  
Old Posted Mar 17, 2017, 12:11 PM
David_99's Avatar
David_99 David_99 is online now
Registered User
 
Join Date: Nov 2008
Posts: 852
I just noticed Advanced Lodging is changing their address from 350 Elmwood Drive (next to National Bank) to 463 Elmwood. The remaining occupants of the former Pizza Twins building is 459 Elmwood. Could that be what's moving into the renovated section?

Last edited by David_99; Mar 17, 2017 at 12:36 PM.
Reply With Quote
     
     
  #851  
Old Posted Mar 17, 2017, 12:39 PM
habs33's Avatar
habs33 habs33 is offline
Registered User
 
Join Date: Aug 2008
Location: Moncton NB
Posts: 641
Also heard that the Dooly's head office was moving from besides National Bank to this location.
Quote:
Originally Posted by David_99 View Post
I just noticed Advanced Lodging is changing their address from 350 Elmwood Drive (next to National Bank) to 463 Elmwood. The remaining occupants of the former Pizza Twins building is 459 Elmwood. Could that be what's moving into the renovated section?
Reply With Quote
     
     
  #852  
Old Posted Mar 17, 2017, 12:52 PM
David_99's Avatar
David_99 David_99 is online now
Registered User
 
Join Date: Nov 2008
Posts: 852
Quote:
Originally Posted by habs33 View Post
Also heard that the Dooly's head office was moving from besides National Bank to this location.
Interesting! Now I wonder what's going on with the National Bank building.
Reply With Quote
     
     
  #853  
Old Posted Mar 20, 2017, 12:03 AM
habs33's Avatar
habs33 habs33 is offline
Registered User
 
Join Date: Aug 2008
Location: Moncton NB
Posts: 641
There is a for sale/lease sign up at the Chrysler dealership on Morton in preparation of their move to the Nissan building.
Reply With Quote
     
     
  #854  
Old Posted Mar 25, 2017, 7:17 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,159
Status update on the McLaughlin Place development:

Subway



Pharmasave



Mixed retail strip (this is where Guacamole is going).



There are still two buildings in this development yet to be built, a second fast food drive-thru (possible A&W), and a second mixed retail building.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #855  
Old Posted Mar 25, 2017, 7:58 PM
David_99's Avatar
David_99 David_99 is online now
Registered User
 
Join Date: Nov 2008
Posts: 852
Here's some photos from Elmwood:


Crystal Mountain (Old Elmwood NB Liquor location)


Possible future Dooly's Head Office & Advanced Lodging(Old Pizza Twins & Jacks location)


Tango Medical (Old Lawton's location)


Canadian Plasma Resources
Reply With Quote
     
     
  #856  
Old Posted Apr 14, 2017, 6:54 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,159
Quote:
Originally Posted by FarmerTom View Post
Driving on the TCH this am I see Nova International Kubota has their future home sign up across the Highway from The JCB and John Deere industrial dealerships. I'm guessing access will be through the development on Fils de Jesus
There is now a second sign up facing the TCH from the new Caledonia Industrial Park South Subdivision expansion off of Filles de Jesus. It's for MCS, which i take to be MCS Sanitation ; a supply company for sanitation materials and equipment. The render on the sign seems to show a fairly substantial two storey building.

http://www.mcs-stop.com

Meanwhile, work is ongoing on the Filles de Jesus extension to service the new south subdivision.........

__________________
Go 'Cats Go
Reply With Quote
     
     
  #857  
Old Posted Apr 17, 2017, 12:10 PM
habs33's Avatar
habs33 habs33 is offline
Registered User
 
Join Date: Aug 2008
Location: Moncton NB
Posts: 641
Is this going to be industrial or residential?

Quote:
Originally Posted by MonctonRad View Post
There is now a second sign up facing the TCH from the new Caledonia Industrial Park South Subdivision expansion off of Filles de Jesus. It's for MCS, which i take to be MCS Sanitation ; a supply company for sanitation materials and equipment. The render on the sign seems to show a fairly substantial two storey building.

http://www.mcs-stop.com

Meanwhile, work is ongoing on the Filles de Jesus extension to service the new south subdivision.........

Reply With Quote
     
     
  #858  
Old Posted Apr 17, 2017, 12:17 PM
NBNYer's Avatar
NBNYer NBNYer is offline
Registered User
 
Join Date: Mar 2010
Location: Moncton
Posts: 1,270
Quote:
Originally Posted by habs33 View Post
Is this going to be industrial or residential?
Industrial
Reply With Quote
     
     
  #859  
Old Posted Apr 18, 2017, 12:19 AM
micks5477's Avatar
micks5477 micks5477 is offline
Registered User
 
Join Date: Mar 2013
Location: Moncton
Posts: 371
Guacamole Mexican Street Food

Word from Guacamole Mexican Street Food is that their new restaurant in McLaughlin Place on Morton Avenue is scheduled to open Wednesday, May 10th.

Reply With Quote
     
     
  #860  
Old Posted Apr 19, 2017, 8:11 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,159
Here are a couple of updated site plans concerning the Caledonia Industrial Park South Subdivision, obtained from the April PAC pdf.





OBSERVATIONS:

(1) - It now appears that the only road access to the new industrial park will be via Price Street.
(2) - The Filles de Jesus access point is now listed only as a "municipal services easement".
(3) - There is a new roadway (Street "B"), which appears to be an extension of the "future street" leading to the proposed "Humphrey Brook Neighbourhood". This roadway extends northward towards the TCH. Could they be considering another interchange onto the TCH???
(4) - They have marked out three lots on the plan already (17-1, 17-10 & 17-12). These are all bordering on the TCH right-of-way. I presume that two of these are for MCS and Kubota. I wonder who had dibs on the third lot???
__________________
Go 'Cats Go
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 8:44 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.