Apparently, a fully bored Canada Line would have required several TBMs to deal with the different soil conditions along the route (i.e. Little Mountain)
- that would have required a extraction pit wherever they needed a new/different TBM.
In addition, remember that the Bombardier bid only proposed tunnel to 49th Ave.
South of 49th Ave. to Marine Drive, Bombardier's proposal had a
permanent open trench down the median.
(Think Grandview cut with planted sides)
Quote:
Originally Posted by Reecemartin
Nonetheless I'm referring to the stations as a point of comparison that should be made because we obviously won't be running low floor LRVs on Broadway.
|
Yeah, sorry, my reference was because the low floor LRVs don't have the best vehicle layouts/capacity, it seems that they build longer platforms for their stations.