Old Posted Feb 9, 2017, 10:05 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,382
Quote:
Originally Posted by cllew View Post
And another section of floor halfway poured when I finished work for the day at 2:30



Quote:
Originally Posted by drew View Post
^ it's kinda cold outside. They may want to put a tarp over that...
Lol just commented on this in the dCondo thread. It was steamy out there when I seen the pour happening earlier.
Reply With Quote
     
     
  #2242  
Old Posted Feb 9, 2017, 11:30 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,847
I am guessing they will finish the pour tonight which leads me to the question of if PCL can place and finish concrete at night under lights in the winter, why can none of the road contractors do the same in the summer?
Reply With Quote
     
     
  #2243  
Old Posted Feb 10, 2017, 1:08 AM
kiwi4life kiwi4life is offline
Registered User
 
Join Date: Jun 2009
Location: saskatoon
Posts: 536
Quote:
Originally Posted by cllew View Post
I am guessing they will finish the pour tonight which leads me to the question of if PCL can place and finish concrete at night under lights in the winter, why can none of the road contractors do the same in the summer?
Yes they sure can... they do it all the time on one project I worked with PCL on in Saskatoon, they did in -25 temperatures in middle of winter. Definitely do able. It — but it works
Reply With Quote
     
     
  #2244  
Old Posted Feb 10, 2017, 2:59 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,943
Same as always - bump to keep the updating photo on the current page...

Reply With Quote
     
     
  #2245  
Old Posted Feb 10, 2017, 8:35 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,382
It's now 2:30 and it doesn't like look that concrete has seen a tarp at all since the pour yesterday.
Reply With Quote
     
     
  #2246  
Old Posted Feb 10, 2017, 8:51 PM
drew's Avatar
drew drew is online now
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,932
^ they might be running sacrificial heat lines thru the slabs to keep them above 5C (very common). Still though, you would think there would be at least an insulated tarp over top...
Reply With Quote
     
     
  #2247  
Old Posted Feb 10, 2017, 8:57 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,382
Interesting. Electrical heat I assume as opposed to a liquid within tubing?
Reply With Quote
     
     
  #2248  
Old Posted Feb 10, 2017, 10:05 PM
Riverman's Avatar
Riverman Riverman is offline
Fossil fuel & rubber
 
Join Date: Feb 2009
Location: Ontario's feel good town
Posts: 4,031
No it is tubing similar to automotive heater hose. Glycol is heated in gas heaters and pumped through the hose.
Reply With Quote
     
     
  #2249  
Old Posted Feb 10, 2017, 10:09 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,847
only flex I saw in the rebar before the pour was the flex (smurf tube) for the electric.

If it was for heating I would expect it to be in an pattern for even heat and the stuff I saw was not.

I know when they were doing the pour for the uncovered section I saw some sort of additive being poured in the mix truck before it discharged. I wonder if that has anything to do with the open surface.
Reply With Quote
     
     
  #2250  
Old Posted Feb 15, 2017, 5:18 PM
Bluenote Bluenote is offline
BANNED
 
Join Date: Jun 2012
Location: Winnipeg / St Vital
Posts: 1,101
Quote:
Originally Posted by cllew View Post
only flex I saw in the rebar before the pour was the flex (smurf tube) for the electric.

If it was for heating I would expect it to be in an pattern for even heat and the stuff I saw was not.

I know when they were doing the pour for the uncovered section I saw some sort of additive being poured in the mix truck before it discharged. I wonder if that has anything to do with the open surface.
They use a form of antifreeze in the concrete, contractors have been using it for decades.
Reply With Quote
     
     
  #2251  
Old Posted Feb 15, 2017, 5:32 PM
drew's Avatar
drew drew is online now
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,932
Quote:
Originally Posted by Bluenote View Post
They use a form of antifreeze in the concrete, contractors have been using it for decades.
Regardless of additives, the code is pretty clear. If the ambient temperature falls below 5C, the concrete must be provided supplementary protection to ensure it doesn't freeze as it cures.
Reply With Quote
     
     
  #2252  
Old Posted Feb 16, 2017, 9:34 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,382
Some interesting form work happening in the foreground. Must be structural plaza features and/or building shape starting coming through now.
Reply With Quote
     
     
  #2253  
Old Posted Feb 17, 2017, 3:15 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,943
Notice that most of the truss roof-like structures are gone from the SW corner of the site.
Reply With Quote
     
     
  #2254  
Old Posted Feb 17, 2017, 3:36 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,382
And finally some concrete being pumped into the elevator core.

I hope TN will have a time lapse available from the construction cam.
Reply With Quote
     
     
  #2255  
Old Posted Feb 17, 2017, 11:00 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,847
Took me a bit but I think the sunken parts are tree wells. Its sort of hard to see in the pics but there appears to be a drainage pipe on the side of each pit

[IMG][/IMG]
Reply With Quote
     
     
  #2256  
Old Posted Feb 18, 2017, 4:11 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,382
Saturday morning and they're pouring concrete. Must be enjoying the weather.
Reply With Quote
     
     
  #2257  
Old Posted Feb 18, 2017, 5:18 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,847
the nice weather helps and maybe making up for the few snow/cold days that PCL shut the site down and there was no work being done on the project. I am sure they want to stay on schedule as much as they can.
Reply With Quote
     
     
  #2258  
Old Posted Feb 18, 2017, 6:24 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,382
Wicked view of the site cllew. Thanks for the photos.
Reply With Quote
     
     
  #2259  
Old Posted Feb 21, 2017, 3:51 PM
DirtWednesday DirtWednesday is offline
Registered User
 
Join Date: Jun 2016
Posts: 181
Quote:
Originally Posted by cllew View Post
Took me a bit but I think the sunken parts are tree wells. Its sort of hard to see in the pics but there appears to be a drainage pipe on the side of each pit

Looks like, once concrete is poured and fills in those holes, they will form the top flair of the columns that will support the public square slab and northeast portion of tower 1. In today's photo there is a little more rebar going on inside those forms.
Reply With Quote
     
     
  #2260  
Old Posted Feb 22, 2017, 7:41 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,382
Second floor formwork going in between the church and the elevator core. She's starting to rise!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 3:01 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.