Quote:
Originally Posted by cganuelas1995
Yeah they should really start looking into making it less hub and spoke and to quit funnelling all routes into Downtown Vancouver. They can start with revamping the nightbus system and maybe have some more routes not connected to SkyTrain stations.
|
It's not that they haven't tried. They had implemented a few routes in Surrey just like what you described about 10 years ago - grid-like routes without funnel everything to SkyTrain and Surrey Central. According to the plan, all of them should be FTN and close to FTN by now. The problem? No one rides it, and they are a money drain for years (less drastic than some outer-suburb routes though). How long can we afford to a route with almost empty buses every 30min before pulling the plug?
375 is supposed to be the second north-south trunk route in Surrey as an alternative to the 321 and KGB. Service began in 2006, and never got enough ridership to warrant late night and any more than half-hourly service. I personally prefer this route when going down to WR as the bus is quite empty so a seat is guaranteed and the bus can fly through all the stops without anyone getting on/off (compared to the crowd on the KGB route...). After 10 years, it managed peak load of 20 and capacity utilization of 21%... and fell victim of service optimization a few years ago.
388 is supposed to be a frequent north cross-town route on 88th. The service never gain popularity to gain off-peak service. In fact, it was converted to a shuttle due to low ridership. The peak load for the peak-only route is only 14 and capacity utilization is only 27% (for a shuttle). However, a recent increase in ridership lowers the cost per rider from almost $4 to about $3.
364 is supposed to be a frequent south cross-town route on 64th. This route had done slightly better than the other two, so it was spared of being "optimized". But still, it is only managed to run every half-hour and no late night service. Peak load is 21 and capacity utilization is 23%.
There was supposed to be another cross-town route in between... but that won't happen until the city actually build a road east of 152nd I think....