HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #16141  
Old Posted Feb 9, 2017, 2:15 AM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,651
Quote:
Originally Posted by dothediu View Post
In regards to the bridge grade, it's needed to be steep because of clearance of ships going thru the Fraser River there. I am sure it meets the specifications as specified by Translink and Province, otherwise how do you quantify a "bad design"? Perhaps they could have started going on a slope sooner after Marine Drive Stn so it's not as steep? But it would mean taller guideway posts, which means more money...
I was thinking that they could've had the bridge perform go up a bit gradually with a gentle S-curve after the switches at Marine Drive to the north side of the river, then the bridge at regular height, then after it reaches the south side of the river, a sloped curve of a similar grade and then to the OMC and Bridgeport. I'll make a drawing later of what I mean if you find it difficult to visualize. If someone with an engineering background wants to comment on that idea, feel free.
     
     
  #16142  
Old Posted Feb 9, 2017, 4:40 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 766
Quote:
Originally Posted by dothediu View Post
I think they do have a deicing train that sprays the power rail at night. But not when snow/ice builds up in revenue service.
SkyTrain has a glycol train that they run when it's icy to spray an anti-icing solution on the power rails. I don't know if Canada Line has anything similar.
     
     
  #16143  
Old Posted Feb 9, 2017, 5:24 AM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,651
Quote:
Originally Posted by dpogue View Post
SkyTrain has a glycol train that they run when it's icy to spray an anti-icing solution on the power rails. I don't know if Canada Line has anything similar.
I don't know why they couldn't run all trains and single-track over the bridge to address the issue with ice on the power rail.
     
     
  #16144  
Old Posted Feb 9, 2017, 5:58 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,665
Quote:
Originally Posted by dpogue View Post
SkyTrain has a glycol train that they run when it's icy to spray an anti-icing solution on the power rails. I don't know if Canada Line has anything similar.
They said they were using sanding and deicing the tracks. In 2014 they said three cars were setup for this.
     
     
  #16145  
Old Posted Feb 9, 2017, 5:34 PM
whatnext whatnext is offline
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 27,753
Thursday morning and it is just raining, yet the Canada Line is still closed from Bridgeport to YVR. What's the excuse now?
     
     
  #16146  
Old Posted Feb 9, 2017, 6:48 PM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
Quote:
Originally Posted by dothediu View Post
In regards to the bridge grade, it's needed to be steep because of clearance of ships going thru the Fraser River there. I am sure it meets the specifications as specified by Translink and Province, otherwise how do you quantify a "bad design"? Perhaps they could have started going on a slope sooner after Marine Drive Stn so it's not as steep? But it would mean taller guideway posts, which means more money...

With a P3 contract, the contractor actually bares the risk of costs if there is overrun. It's a fixed cost contract. Anything over, the contractor pays. Just like the Evergreen tunnels issues that came up and being delayed, it was all extra cost to SNC. If you don't want P3, then they rack up the price like crazy, and guess who pays in the end? You, the taxpayer. You will just end up with more media saying Translink is bad at managing money and project, etc...
Indeed, I'm not really against P3, it was just that at the Canada Line, they only took short term factors in mind...

There are freight boats in the North Arm? I thought it was too narrow for large boats....


Quote:
Originally Posted by whatnext View Post
Thursday morning and it is just raining, yet the Canada Line is still closed from Bridgeport to YVR. What's the excuse now?
The snow became icy?
     
     
  #16147  
Old Posted Feb 9, 2017, 11:00 PM
TransitJack TransitJack is offline
Registered User
 
Join Date: Jul 2009
Posts: 443
Seems like they made it through the snow yesterday but then got slammed when the the freezing rain started up.

Once the rain and falls on the power rail, freezes up to a thick level pretty quick, so doesn't just wipe off like snow does.

Definitely an area that needs some improvement/investment.
     
     
  #16148  
Old Posted Feb 10, 2017, 1:11 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 766
Quote:
Originally Posted by TransitJack View Post
Seems like they made it through the snow yesterday but then got slammed when the the freezing rain started up.

Once the rain and falls on the power rail, freezes up to a thick level pretty quick, so doesn't just wipe off like snow does.

Definitely an area that needs some improvement/investment.
Even SkyTrain was having issues with ice buildup yesterday evening, despite running the glycol train through certain areas several times. You can try to stop the ice from building up, but once it does there isn't all that much you can do.
     
     
  #16149  
Old Posted Feb 10, 2017, 2:12 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,081
Global still did a pretty nice job singling out the Canada Line from the rest of the system and indicating none of the other lines (much) difficulty.
Here's hoping this is ammunition for later system expansions to opt for ICTS instead of considering something similar from Rotem again.
     
     
  #16150  
Old Posted Feb 10, 2017, 4:52 AM
TransitJack TransitJack is offline
Registered User
 
Join Date: Jul 2009
Posts: 443
Quote:
Originally Posted by MIPS View Post
Global still did a pretty nice job singling out the Canada Line from the rest of the system and indicating none of the other lines (much) difficulty.
Here's hoping this is ammunition for later system expansions to opt for ICTS instead of considering something similar from Rotem again.
I think it is already well understood that the next phases of automated rapid transit will be the Broadway ext and out to Langley, using the existing Skytrain tech.
     
     
  #16151  
Old Posted Feb 10, 2017, 7:24 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
After UBC and Langley extensions what's next?
     
     
  #16152  
Old Posted Feb 10, 2017, 8:20 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,128
Quote:
Originally Posted by Mac Write View Post
After UBC and Langley extensions what's next?
If SkyTrain, there's planned B-Lines along 41st, Willingdon and Hastings, and to Maple Ridge and West Van - probably one of those.

My money's on a Willingdon line (possible extensions to North Van and the River District), with an SFU Gondola on the side.
     
     
  #16153  
Old Posted Feb 10, 2017, 10:47 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
Quote:
Originally Posted by Migrant_Coconut View Post
If SkyTrain, there's planned B-Lines along 41st, Willingdon and Hastings, and to Maple Ridge and West Van - probably one of those.

My money's on a Willingdon line (possible extensions to North Van and the River District), with an SFU Gondola on the side.
41st would be a relief line
How would willington connect to the current line without single tracking to put in a a few switches (remember in summer 2000 when they put in the outbound switch just outside the Columbia tunnel before the bridge?).

I personally want to see the Port Coquitlam extension, as it would be like 3 stops but would help out allot in bringing in more traffic (and I live here).
     
     
  #16154  
Old Posted Feb 10, 2017, 11:14 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,950
Well, after phase 1 of the Broadway Line and the Surrey LRT L-Line will be the SKYTRAIN extension to Langley (not going to let them screw that up)

After that will be phase 2 of the Broadway Line to UBC.

I have a feeling that his will take us to somewhere between 2030 and 2035.

After that I have my money on the short extension out to Port Coquitlam (this could maybe even be done at the same time Broadway Phase 2).

After that, is anyone's guess. Don't think there are any official plans or solid visions beyond this point. My guess is either a skytrain / subway line along Hastings or the Arbutus LRT.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #16155  
Old Posted Feb 10, 2017, 4:39 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,615
Quote:
Originally Posted by Metro-One View Post
Well, after phase 1 of the Broadway Line and the Surrey LRT L-Line will be the SKYTRAIN extension to Langley (not going to let them screw that up)

After that will be phase 2 of the Broadway Line to UBC.

I have a feeling that his will take us to somewhere between 2030 and 2035.

After that I have my money on the short extension out to Port Coquitlam (this could maybe even be done at the same time Broadway Phase 2).

After that, is anyone's guess. Don't think there are any official plans or solid visions beyond this point. My guess is either a skytrain / subway line along Hastings or the Arbutus LRT.
All good plans, but I think those put us to 2050 rather than 2035. By that point we should have fully autonomous vehicles of all shapes and sizes, and who knows what transit needs will be appropriate.

At any rate, with 2 rail technologies in place today (plus WCE), let's not jump to a 3rd any time soon.
     
     
  #16156  
Old Posted Feb 10, 2017, 5:49 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Is there something unique about Vancouver that makes it not suitable for traction rail based train systems like what's used almost everywhere on this continent? With some places with considerably more severe winters.
     
     
  #16157  
Old Posted Feb 10, 2017, 7:30 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,645
Probably just depends on the gradient of the line as built.

It would be interesting to compare to the gradients of LRT systems in Seattle or Portland.
     
     
  #16158  
Old Posted Feb 10, 2017, 7:38 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,128
Quote:
Originally Posted by Mac Write View Post
How would willington connect to the current line without single tracking to put in a a few switches (remember in summer 2000 when they put in the outbound switch just outside the Columbia tunnel before the bridge?).
Nah, a completely new tunneled line (maybe some elevated segments). Like the Canada Line, but with Bombardier Mark IIIs. Though a PoCo extension needs to happen too.

Quote:
Originally Posted by WarrenC12 View Post
All good plans, but I think those put us to 2050 rather than 2035. By that point we should have fully autonomous vehicles of all shapes and sizes, and who knows what transit needs will be appropriate.

At any rate, with 2 rail technologies in place today (plus WCE), let's not jump to a 3rd any time soon.
Whatever happens, we need to keep connecting the city via SkyTrain lines and semi-rapid feeder lines.

Could be LRT, could be BRT, could be anything... so long as it's not PRT, everything should work out fine.
     
     
  #16159  
Old Posted Feb 10, 2017, 7:50 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,645
Seattle also had an issue back in January when heated pantographs melted adhesive on a carbon shoe:

http://www.seattletimes.com/seattle-news...ail-system-halted-jan-20-for-five-hours/
     
     
  #16160  
Old Posted Feb 10, 2017, 8:41 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Quote:
Originally Posted by WarrenC12 View Post
All good plans, but I think those put us to 2050 rather than 2035. By that point we should have fully autonomous vehicles of all shapes and sizes, and who knows what transit needs will be appropriate.

At any rate, with 2 rail technologies in place today (plus WCE), let's not jump to a 3rd any time soon.
And flying cars. We'll have flying cars, don't forget.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:12 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.