HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #16121  
Old Posted Feb 7, 2017, 3:33 PM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Quote:
Originally Posted by Kisai View Post
If anything, this is a validation that the Skytrain tech is superior, or the Canada Line is the weaker system. If Surrey goes with it's LRT boondoggle it will also be another thing that doesn't work well in the snow. Guarantee it.

In the Canada Line's defense, they clearly could have rectified the problem.
Calgary and Edmonton's LRTs work just fine in the snow, FYI. LIM should in theory be better still and have zero problems as it's not the wheels pulling the train but the induction rail, but it would seem the Canada line has additional problems that other LRTs don't.
     
     
  #16122  
Old Posted Feb 7, 2017, 4:29 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,618
Canada Line south of Marine and that area of the bridge has been a problem multiple times, in different types of weather. Maybe that switch sucks, or something else is poorly put together there. Just my observation over 4-5 years of taking the Canada Line.
     
     
  #16123  
Old Posted Feb 7, 2017, 4:31 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,716
Quote:
Originally Posted by cganuelas1995 View Post
Took 2.5 hours to get home today. How were your commutes?
The usual 45 minutes to get from Port Coquitlam (near Coquitlam Centre) to New Westminster by walking and SkyTrain. I haven't had any problems at all. It was really nice being on the SkyTrain going faster than all the cars on Highway 1 last night.
     
     
  #16124  
Old Posted Feb 7, 2017, 5:35 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,131
Quote:
Originally Posted by milomilo View Post
Calgary and Edmonton's LRTs work just fine in the snow, FYI. LIM should in theory be better still and have zero problems as it's not the wheels pulling the train but the induction rail, but it would seem the Canada line has additional problems that other LRTs don't.
Right, at least rail transit (RRT and LRT) can function after a snowfall. That's more than we can say for our buses at the moment.
     
     
  #16125  
Old Posted Feb 7, 2017, 6:40 PM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
VERY satisfied that Expo SkyTrain wasnt delayed yesterday evening. Tackled the snow without a problem. The 502 took 30 minutes to arrive (it was 6:20 when I arrived). The lineup went up to the city hall plaza area. Managed to get seats on my bus, on the bright side (although wsiting for 2 buses altogether)

Quote:
Originally Posted by Migrant_Coconut View Post
Right, at least rail transit (RRT and LRT) can function after a snowfall. That's more than we can say for our buses at the moment.
LRT, probably not so. Portland had a closure on the MAX during a recent snowfall. A train derailed due to ice at Rose Quarter. Not to mention the overheads are prone to ice and/or falling trees.

http://www.kgw.com/mb/news/local/max-derails-at-rose-quarter-expect-major-delays/385764465
     
     
  #16126  
Old Posted Feb 7, 2017, 6:48 PM
dothediu dothediu is offline
Registered User
 
Join Date: Sep 2015
Posts: 70
Quote:
Originally Posted by WarrenC12 View Post
Canada Line south of Marine and that area of the bridge has been a problem multiple times, in different types of weather. Maybe that switch sucks, or something else is poorly put together there. Just my observation over 4-5 years of taking the Canada Line.
Skytrain gets its power off the power rail from the side, has nothing to do with LIM. When there's snow, it's not likely to accumulate on the side of the power rails.

Canada Line, the power rail shoe gets the power from the top of the power rail. When there's snow, it accummulates on top of the power rail, and trains have a lot of trouble getting power, hence you have many more issues when it snows from Marine drive onwards.

Pic of Skytrain power rail shoe


Pic of canada line power rail shoe
     
     
  #16127  
Old Posted Feb 7, 2017, 7:43 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,652
Quote:
Originally Posted by WarrenC12 View Post
Canada Line south of Marine and that area of the bridge has been a problem multiple times, in different types of weather. Maybe that switch sucks, or something else is poorly put together there. Just my observation over 4-5 years of taking the Canada Line.
Could be the bridge. I've heard other posters say it's the grade. It was weird how trains were terminating and turning around at Bridgeport instead of continuing through to VYR/Brighouse and how it was single platform.
     
     
  #16128  
Old Posted Feb 7, 2017, 7:44 PM
whatnext whatnext is offline
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 27,785
Quote:
Originally Posted by cganuelas1995 View Post
Could be the bridge. I've heard other posters say it's the grade. It was weird how trains were terminating and turning around at Bridgeport instead of continuing through to VYR/Brighouse and how it was single platform.
So does the Provincial Gov't/Translink get compensation from their PPP partner when they can't deliver thanks to poor design?
     
     
  #16129  
Old Posted Feb 7, 2017, 7:58 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,618
Quote:
Originally Posted by whatnext View Post
So does the Provincial Gov't/Translink get compensation from their PPP partner when they can't deliver thanks to poor design?
It would be great to see the P3 contract. Schedule 3 I think usually covers operations.

You could check these documents, I don't see the actual Project Agreement here:

http://www.translink.ca/site-info/docume...B16E6D21B-BF1E-4B78-B31E-B7522CE29546%7D
     
     
  #16130  
Old Posted Feb 7, 2017, 11:22 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by WarrenC12 View Post
It would be great to see the P3 contract. Schedule 3 I think usually covers operations.

You could check these documents, I don't see the actual Project Agreement here:

http://www.translink.ca/site-info/docume...B16E6D21B-BF1E-4B78-B31E-B7522CE29546%7D
Even with a FOI, if the full P3 contract was released, I'd expect lotsa redacting to protect ProTrans' privacy and gov't secrecy.
     
     
  #16131  
Old Posted Feb 8, 2017, 12:56 AM
dothediu dothediu is offline
Registered User
 
Join Date: Sep 2015
Posts: 70
http://buzzer.translink.ca/2017/02/thankyouforyourpatience/

The unprecedented weather patterns and environmental conditions have presented us with many challenges, including in a particularly steep area over the Fraser River (the North Arm Bridge). Because of the steep grade, trains require full power when travelling through this section of the bridge, and Canada Line believes ice buildup on the power rail is the likely cause of the disruptions.
     
     
  #16132  
Old Posted Feb 8, 2017, 1:12 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,083
I've seen both the SkyTrain and the Canada line running on especially frosty mornings and evenings. There's a distinct spray of sparks from both as the collectors pass over ice and snow stuck to the power rails.
Neither technology is immune to this. Really the best they can do is put fiberglass covers over the power rails but we no longer use that outside of stations. The Expo Line lost all of its shrouds when the power rails were replaced.
     
     
  #16133  
Old Posted Feb 8, 2017, 1:36 AM
xsoccerplayer18x xsoccerplayer18x is offline
Registered User
 
Join Date: Jun 2012
Posts: 25
Alternatively, it may have been a better choice to have current collection from the underside of the third rail, as opposed to the top. That brings up the problem of maintaining constant adhesion of the shoe to the underside of the rail though.

I seem to recall that a few years back the thoughts were that the steepness of the North Arm Bridge approaches, when icy, caused the wheels to slip and the trains timed out.

Not sure if some sort of anti-freeze solution or sanding would alleviate a lot of these problems.
     
     
  #16134  
Old Posted Feb 8, 2017, 2:29 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,131
Hopefully, this is the last time we have a P3 contract.

“I guess the question I'm asked the most often is: "When you were sitting in that capsule listening to the count-down, how did you feel?" Well, the answer to that one is easy. I felt exactly how you would feel if you were getting ready to launch and knew you were sitting on top of two million parts -- all built by the lowest bidder on a government contract.” - John Glenn, 1962
     
     
  #16135  
Old Posted Feb 8, 2017, 9:22 AM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
Quote:
Originally Posted by Migrant_Coconut View Post
Hopefully, this is the last time we have a P3 contract.

“I guess the question I'm asked the most often is: "When you were sitting in that capsule listening to the count-down, how did you feel?" Well, the answer to that one is easy. I felt exactly how you would feel if you were getting ready to launch and knew you were sitting on top of two million parts -- all built by the lowest bidder on a government contract.” - John Glenn, 1962
Well, the Apollo program's parts were often price-gauged because they could and would get away with it (time was crucial).

It's really a redundancy vs cost thing. If we get PPP and Broadway and Surrey Skytrain, or non-PPP and just Broadway, I'm choosing the former.
     
     
  #16136  
Old Posted Feb 8, 2017, 9:28 AM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
Quote:
Originally Posted by MIPS View Post
The bridge has always been a weak spot. Every time it snows hard the trains can't make the grade.



The bridge grade was poorly thought out.
We need a cover over the sloped sections of the Canada Line. Can't be that expensive, and it can be used for 30+ years on a high use line.
     
     
  #16137  
Old Posted Feb 8, 2017, 5:16 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,652
Quote:
Originally Posted by fredinno View Post
We need a cover over the sloped sections of the Canada Line. Can't be that expensive, and it can be used for 30+ years on a high use line.
How about engineering the sections to have a deicing spraying system?
     
     
  #16138  
Old Posted Feb 8, 2017, 6:11 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,202
Quote:
Originally Posted by cganuelas1995 View Post
How about engineering the sections to have a deicing spraying system?
Even just a scraper system ahead of the power shoe would probably work. If it's ice on the rails, then add sand or a similar scraper.

Heat trace for a couple hundred metres is probably also an option, since the rails probably rarely get more than a couple degrees below freezing.

Some railways also use natural gas heaters at switches to keep them from freezing.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #16139  
Old Posted Feb 8, 2017, 6:20 PM
dothediu dothediu is offline
Registered User
 
Join Date: Sep 2015
Posts: 70
In regards to the bridge grade, it's needed to be steep because of clearance of ships going thru the Fraser River there. I am sure it meets the specifications as specified by Translink and Province, otherwise how do you quantify a "bad design"? Perhaps they could have started going on a slope sooner after Marine Drive Stn so it's not as steep? But it would mean taller guideway posts, which means more money...

With a P3 contract, the contractor actually bares the risk of costs if there is overrun. It's a fixed cost contract. Anything over, the contractor pays. Just like the Evergreen tunnels issues that came up and being delayed, it was all extra cost to SNC. If you don't want P3, then they rack up the price like crazy, and guess who pays in the end? You, the taxpayer. You will just end up with more media saying Translink is bad at managing money and project, etc...
     
     
  #16140  
Old Posted Feb 8, 2017, 6:43 PM
dothediu dothediu is offline
Registered User
 
Join Date: Sep 2015
Posts: 70
Quote:
Originally Posted by cganuelas1995 View Post
How about engineering the sections to have a deicing spraying system?
I think they do have a deicing train that sprays the power rail at night. But not when snow/ice builds up in revenue service.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:40 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.