New planning commission schedule. A light presentation this time, with two projects which are retreads.
1. Re-certification of the four permit parking zones in South Side Flats. I'm not sure the background of this, but I know many have concluded the permit zones have been a failure, insofar as they have choked off local business development in South Side.
2. Proposed signage for the new Hotel Indigo at the Pittsburgh Technology Center.
3. Exterior renovations of 301 Grant Street. The changes are pretty minor, and include a new soffit, removal of an existing fountain and sculpture, and the addition of more landscaping.
4. A revised presentation on the "Mill 19 Building" at the Almono site. The major change appears to be expanding Phase A (the building inside the old mill building fitout) from 313 feet to 450 feet.