  #2901  
Old Posted Jan 25, 2017, 1:55 AM
logicbomb logicbomb is offline
Joshua B.
 
Join Date: Sep 2010
Posts: 1,207
I recall seeing an internal PP presentation in 2014 which outlined planned frequencies.

-Every 9-10 min peak.
-Every 12-15 min off-peak
-Every 20 min after 10pm, with last trains around midnight.

The B-Line was only about 1.5 years old by then but it was plagued by reliability issues before the queue jumpers were built and the whole notion was that "frequencies can take a hit but it will be at the sake of increased reliability." They did exactly that by completing those queue jumpers.

Since that period, we've also seen significant crashes and incidents along KGB and 104th Ave. The 96 was simply rerouted in these events with minor delays. Daryl has brought this up but the city as it is...could be entirely crippled in the event of an accident or police incident in one town center. That's comical....
     
     
  #2902  
Old Posted Jan 25, 2017, 2:24 AM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
Quote:
Originally Posted by Migrant_Coconut View Post
Wait, what? The Downtown Historical Railway only ran for a few months back in 2010, and was permanently closed in 2011 because of limited political enthusiasm... and because scrap metal thieves made off with most of the overhead wire.
It ran from 1998 until 2011 before being shut down. The 2010 was an LRT demonstration.

https://en.wikipedia.org/wiki/Vancouver_Downtown_Historic_Railway#Heritage_service

We still have the trains from the historical service, just shut down. It would be cheaper than a skytrain or ripping up the rail line for a dedicated lane BRT.

Quote:
It is not a requirement for all the train to travel from end to end. In fact, during off-peak, only half of the capacity from Metrotown will go to Surrey while the other half goes to Production. They could reduce the frequency by half again after King George and would still have a service that matches the proposed LRT line.

A line that goes everywhere seems attractive on paper, but it is slower. If it is slower, it is less attractive to the people who want to get to somewhere in a hurry. Slower it also means more trains required. More trains mean more cost, both capital and operating. Longer line means the demand would be less evenly distributed. From TransLink's study, the Langley line would have almost twice as much demand as the Newton line even without the Guildford detour, and the segment north of Newton would also have much higher demand than the extension to White Rock. The line would end up having its own inefficient Metrotown vs. SoF Suburb sections. The difference is, LRT line would be more difficult to short-turn trains for the busier segment compared to the automated system, as it require space to park the terminating train for crew rest and recovery.

If the SkyTrain extension along Fraser is built, the projection for 2041 is 6,800 peak riders per hour. I don't think the train would be that empty. In comparison, this figure is higher than the current peak load for both Millennium and Canada Line.
But it doesn't make the "Metro Surrey" proponents happy. We need to keep them happy, you know.

And the extension to White Rock is admittedly fantasy. If we cut it out to terminate at Newton (like the L-Line), and use B-line for the rest, would it be workable? I mean, South Surrey and Langley needs to develop more, there's still plenty of empty land.

And that's projection to 2041... by then, Canada Line and Expo Line will be even higher in usage, so that's a null point.
     
     
  #2903  
Old Posted Jan 25, 2017, 2:52 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by fredinno View Post
Extending the high-capacity Expo Line into the lower capacity South of Fraser Suburbs is a bad idea for precisely that reason- It's inefficient to have Expo line cars hovering half-empty around Surrey as the trains in Metrotown are starting to resemble those in East Asia.

Keep the two systems separate. My ideal Skytrain line would go from White Rock along King George to Surrey Central (Transfer), then out from 108 to Guildford, down 152 to Fraser, and from Fraser to Langley Memorial. Only issue is missing out on Surrey Outpatient, but it otherwise fills all the lines from Phase 1, and 2 of Translink's Plan.

It's really the best compromise.



Eh, at this point, I'd see LRT. We already have some around False Creek, and so it would have lower long term maintenance costs. Besides, in most systems, the Translink baseline LRT and BRT systems both will need an entirely new lane built for them anyways.

Plus, it's more politically palatable.
It's been mentioned before that the excuse "oh there isn't enough demand for the Skytrain to justify it" or "LRT is cheaper" are looking at data from 10 years ago, not 30 years in the future.

In fact,
http://www.whiterockcity.ca/assets/Committees/Transportation/2006/Agenda082806.pdf
Quote:
CITY OF WHITE ROCK - TRANSPORTATION AND SAFETY COMMITTEE August 2006
SOUTH FRASER STRATEGIC AREA TRANSIT PLAN
SUMMARY OF COMMITTEE TRANSIT PRIORITIES FOR WHITE ROCK

LONGER TERM PRIORITIES
Install light rail beginning in Langley and following the existing BC Rail
right of way close to Highway 10 and then north at highway 99 over the
Fraser to connect with the RAV at Richmond;

Provide transportation links to Willowbrook/Downtown Langley (upgrade
and use existing routes: 16th Ave., 32ndAve., 200th Street); bus route along
152nd to #10 Hwy to Langley;

Designate the White Rock/Semiahmoo Peninsula/Grandview Heights
region a priority growth area for connection to light rail in Surrey or
Langley; potential LRT/Sky Train destination, connecting to existing
system;

Expand the development of a transit corridor from either Vancouver or
Richmond along Highway 99 with White Rock City Centre the end point;
Even back in 2006, "LRT" was being thrown around, but it was really a Dianne Watts objective. Deciding on the technology without even having a business case or community consultation first. Keep in mind that Dianne ran for Mayor and got 80% of the vote. Linda Hepner was not elected to the Mayor's seat, she assumed it after Dianne ran for the Federal Conservatives. So there is a possibility of her losing that seat and/or all of Surrey First being thrown out (look at the crime escalation in Surrey for a reason why.) That is why they're in a rush to get the LRT started, because if they lose in 2018, the next City council might scrap it and there will be no Surrey First legacy.

https://www.surrey.ca/bylawsandcouncillibrary/MIN-TC-2006-04-20-4371.pdf

Quote:
105 Avenue is needed for the following reasons:
o 2014 traffic modeling: 1,300 vph in the peak direction (less than 100 vph
more than existing);
o Significant future development in the area;
o BRT and possible future LRT on 104 Avenue;
o Congestion on 104 Avenue;
o No other continuous road between 104 Avenue and 108 Avenue; and
o Very difficult community access.
Also note here:
(Paul Hillsdon and Nathan Pachal, 2013)
http://paulhillsdon.com/leapahead.pdf


The LRT will be the most expensive thing to operate. We know this already, but nobody wants to listen.


One other thing I want to bring up because nobody has mentioned it. If all of you saw the snow storms and how they reduced most roads and streets by about a third, now imagine what happens the next time we get this kind of weather with a LRT and an unprepared Surrey.

In Toronto, Calgary and Edmonton, they get Snow, often. They are prepared. Seattle and Portland are not, their car drivers are as bad as ours. Seattle manages to weather being snowed on, while Portland grinds to a halt.
     
     
  #2904  
Old Posted Jan 25, 2017, 4:20 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,095
Quote:
Originally Posted by fredinno View Post
It ran from 1998 until 2011 before being shut down. The 2010 was an LRT demonstration.

https://en.wikipedia.org/wiki/Vancouver_Downtown_Historic_Railway#Heritage_service

We still have the trains from the historical service, just shut down. It would be cheaper than a skytrain or ripping up the rail line for a dedicated lane BRT.



But it doesn't make the "Metro Surrey" proponents happy. We need to keep them happy, you know.

And the extension to White Rock is admittedly fantasy. If we cut it out to terminate at Newton (like the L-Line), and use B-line for the rest, would it be workable? I mean, South Surrey and Langley needs to develop more, there's still plenty of empty land.

And that's projection to 2041... by then, Canada Line and Expo Line will be even higher in usage, so that's a null point.
Not sure what you mean... the vintage service was always meant to be an attraction rather than a reliable mass transport system - few trains, deteriorating tracks (until it was fixed for the Olympics), single-tracking, and the train was never built for high-speed operation. Back in the days, the Chilliwack - Vancouver line would take more than 4 hours one way. Imagine someone doing a daily commute with this

There are so much work need to be done, that making it a true LRT line would almost like a completely new system, just travelling on the same right-of-way.

And my point is, comparatively the Canada Line and Millennium Line all built with fully grade separated transit when the projection was similar or lower than the one to Langley. I bet, not many people nowadays (especially the riders) would say "there is just too little demand for SkyTrain on these route, the trains are too empty, this should've been built as at-grade LRT instead!"

But then, if the projection holds true, then extending only every third train during peak hour to Langley would not even provide enough capacity between Fleetwood and Surrey Central...
     
     
  #2905  
Old Posted Jan 25, 2017, 4:38 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by nname View Post

But then, if the projection holds true, then extending only every third train during peak hour to Langley would not even provide enough capacity between Fleetwood and Surrey Central...
You can always short-turn a train, and you can always add more trains until the headway is too short. eg, they can build a siding explicitly to short-turn the train at Surrey Central or Scott Road (there are switches before and after Scott Road, there is a switch on the south side of Gateway, No switches before or after Surrey Central, and switches on both sides of King George.) and then have only every third train go over the SkyBridge (the complication is really on the other side of the bridge, but there are no switches on the bridge.) It's just a question of expense and willingness to shut down part of the track to build it. (Note how the Millenium Line was tacked on to Columbia Station, and that's the station that has the most switching problems.)

If the "L" line was Skytrain, they would likely have the rails connected to the Expo mainline, but not run service through it except for repositioning trains from the OMC. The Fraser Highway would be the main extension of the Expo Line. But it would also give them the flexibility for events or evacuations to be able to move people without having a transfer. This is why more or less if the "L line" was built as a street-level LRT it's a bit less important than the Fraser Highway being built as Skytrain. If the Fraser Highway is built as a LRT, it would actually slow the "L line" down due to having to cross that track at King George. See http://www.surrey.ca/files/LRTMap.pdf . Do you really think they are going to built four platforms at King George? I don't think so.

Also I hope "L line" isn't the name they use, because "L" sounds like "El" as in "Elevated"
     
     
  #2906  
Old Posted Jan 25, 2017, 5:07 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,593
Quote:
Originally Posted by Kisai View Post
You can always short-turn a train, and you can always add more trains until the headway is too short.


Also I hope "L line" isn't the name they use, because "L" sounds like "El" as in "Elevated"
Also if they have any sense (which is always debatable) they won't build the entire extension to Langley all at once - they'll build it in phases and watch the ridership numbers.

L is just the shape of the route (admittedly upside down). I'm sure they'll come up with a proper (pretentious?) name for it if they get to build it.
     
     
  #2907  
Old Posted Jan 25, 2017, 5:10 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by nname View Post
The Evergreen Line even have switches and platform pre-built, and they were seriously considered demolish them for LRT.

I bet if the rapid transit is ever extended to Port Coquitlam, there will be the same LRT vs SkyTrain debate, even though the branch is already built with 100m of tracks laid.
have you not heard of the Evergreen Extension (aka the Evergreen line)?
running since Dec 2016.

Translink:
http://www.translink.ca/en/Plans-and-Projects/Rapid-Transit-Projects/Evergreen-Extension.aspx

and the skyscraperPage ...

http://forum.skyscraperpage.com/showthread.php?t=165814&page=478
     
     
  #2908  
Old Posted Jan 25, 2017, 5:11 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,159
Quote:
Originally Posted by Sheba View Post
L is just the shape of the route (admittedly upside down).
Personally, I just use "dogleg." Too many hours on SimGolf.

Quote:
Originally Posted by Sheba View Post
I'm sure they'll come up with a proper (pretentious?) name for it if they get to build it.
Well, they name SkyTrain lines after important events in Vancouver (Expo, Millennium) or after abstract Pacific Northwest concepts (Evergreen), so those are taken. Maybe LRT gets animals (Orca? Wolf? Kodiak?).
     
     
  #2909  
Old Posted Jan 25, 2017, 5:41 AM
Anorak Anorak is offline
Registered User
 
Join Date: Mar 2016
Posts: 115
Quote:
Originally Posted by Migrant_Coconut View Post
Personally, I just use "dogleg." Too many hours on SimGolf.



Well, they name SkyTrain lines after important events in Vancouver (Expo, Millennium) or after abstract Pacific Northwest concepts (Evergreen), so those are taken. Maybe LRT gets animals (Orca? Wolf? Kodiak?).
I think the evergreen line was named after the evergreen cultural centre located at the terminus, that's what I heard at least.
     
     
  #2910  
Old Posted Jan 25, 2017, 6:55 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
Quote:
Originally Posted by cornholio View Post
Evergreen Line = 10.9 km = 1.4 billion = about 120 mill per km (with a long tunnel and all grade seperated and driverless)

Surrey LRT L Line = 9.7km = over 1 billion = min 100 mill per km (all at grade with drivers mixed with traffic and removing some 20 km of traffic lanes etc) * costs will likely be significantly higher once planing starts.

I makes no sense on the routes to go LRT. Crazy stuff.
...

You should email Translink with that. Surrey is screwed. I live there.
     
     
  #2911  
Old Posted Jan 25, 2017, 7:07 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
[QUOTE=fredinno;7689125]Extending the high-capacity Expo Line into the lower capacity South of Fraser Suburbs is a bad idea for precisely that reason- It's inefficient to have Expo line cars hovering half-empty around Surrey as the trains in Metrotown are starting to resemble those in East Asia.

Keep the two systems separate. My ideal Skytrain line would go from White Rock along King George to Surrey Central (Transfer), then out from 108 to Guildford, down 152 to Fraser, and from Fraser to Langley Memorial. Only issue is missing out on Surrey Outpatient, but it otherwise fills all the lines from Phase 1, and 2 of Translink's Plan.

It's really the best compromise.


Dude have you ever taken the 502 bus that runs from Surrey Central, via King George Station, then ultimately all down Fraser Highway to Langley. That bus is slowly making its case for one of the busiest routes/corridors in metro Vancouver. I guarantee you if a Skytrain gets built along Fraser Highway it'll be an instant success.
     
     
  #2912  
Old Posted Jan 25, 2017, 8:20 AM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
remember when Canada Line was being criticized that no one will ride it?

Its ridership now continues to far exceed expectations. It's so packed during the rush hour that people at bridgeport had to wait for the train coming from yvr.

When you build a transit line you always build for the future and not just look at current demands. People will take transit if it's the faster and more convenient option, which Skytrain is. A glorified streetcar is neither of those things.
     
     
  #2913  
Old Posted Jan 25, 2017, 8:55 AM
Vonny Vonny is offline
Registered User
 
Join Date: Sep 2009
Posts: 155
Quote:
Originally Posted by Sheba View Post
Has there been debate on here of the location of the lines? The only debate I've seen has been on the technology (bus, LRT, Skytrain).
Yes, that is one of the main problem of this ill conceived LRT project.


and this comment is well taken too:
Quote:
Originally Posted by fredinno View Post
Extending the high-capacity Expo Line into the lower capacity South of Fraser Suburbs is a bad idea for precisely that reason- It's inefficient to have Expo line cars hovering half-empty around Surrey as the trains in Metrotown are starting to resemble those in East Asia.
all these, is echoed in this blog post :The ill conceived Surrey LRT and the missed regional transit opportunity

     
     
  #2914  
Old Posted Jan 25, 2017, 9:27 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,095
Quote:
Originally Posted by flipper316 View Post
You should email Translink with that. Surrey is screwed. I live there.
That would be useless, as from TransLink's own report, it clearly favored SkyTrain and LRT come up as the worst alternative among the ones studied. However, since most people believe the elected politicians should be the ones making decisions instead of unelected board, planners and expert, TransLink had no choice but to listen and choose what Surrey wants. In the end, you'll have to thank to the mayor and council for whatever that got built...
     
     
  #2915  
Old Posted Jan 25, 2017, 12:13 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,658
Quote:
Originally Posted by ilikeredheads View Post
remember when Canada Line was being criticized that no one will ride it?

Its ridership now continues to far exceed expectations. It's so packed during the rush hour that people at bridgeport had to wait for the train coming from yvr.
Can confirm. I ride the Canada Line more or less everyday because I live in Richmond. On the days I get off work during rush hour, I take either the 4 or 7 to City Centre, cross reference the boards and take a train to Waterfront if the next outbound train is for YVR. That way I have a seat, and sitting down is a luxury after being on your feet for ~8 hours. Couple of times, I sat on the floor.

I honestly think it was really dumb to go with Hyundai Rotem tech instead of the already in use Bombardier tech, not to mention the tiny-ass stations, which was a shock to me after returning from Sydney (all I could think was "fuck, these platforms are tiny").
     
     
  #2916  
Old Posted Jan 25, 2017, 1:05 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by cganuelas1995 View Post
Can confirm. I ride the Canada Line more or less everyday because I live in Richmond. On the days I get off work during rush hour, I take either the 4 or 7 to City Centre, cross reference the boards and take a train to Waterfront if the next outbound train is for YVR. That way I have a seat, and sitting down is a luxury after being on your feet for ~8 hours. Couple of times, I sat on the floor.

I honestly think it was really dumb to go with Hyundai Rotem tech instead of the already in use Bombardier tech, not to mention the tiny-ass stations, which was a shock to me after returning from Sydney (all I could think was "fuck, these platforms are tiny").
The only saving grace with going with that technology is that it's one straight grade-separated line and uses the same automated SelTrac technology as the Skytrain. Without being able to share the rolling stock of the Skytrain, that means that the Canada Line will be more expensive to operate than the Skytrain, and will require separate orders to get more trains. Meanwhile the UBC, Evergreen, Millenium and Expo segments can all use the same rolling stock, and any extensions to PoCo and Langley can also use the same rolling stock.

The more you invest in your own technology, the less it costs the transit system in maintenance and operational costs. The automated trains allow for saving money by dialing up or down frequency. You can't do that on driver-operated trains because union contracts require shifts of specific lengths. So you end up spending money running the trains at the same frequency all day unless a driver calls in sick.

It would have been ideal to use the same technology for everything. But the nature of PPP's is that you must accept the lowest bidder even if it's the least efficient option. PPP's only take into account the capital costs, not operational costs beyond the initial 30 years. Had the Canada Line not been rushed for the Olympics, it's likely the Evergreen line would have been built first as a LRT and then the RAV line being built as a LRT, and then all of south-of-fraser transit going to hell in a handbasket with gridlock. It's the lesson nobody learns from other cities, that multiple independent lines means redundant staffing, maintenance, ticketing and security. As technology improves you can always build a new line with newer backwards-compatible tech, and then refurbish an older parallel line.

That is what I fear is going to happen with both the Canada Line + Arbutus, and the "L line" LRT in Surrey. When the Canada Line is 30 years old, it will likely be beyond it's capacity, so they will build a newer parallel Arbutus line and then shutdown the Canada Line to expand it. With the "L Line" in Surrey they will never recover it's costs in 50 years (these are always 30 year financing things,) and the business case will recommend replacing the LRT (assuming it never gets expanded) with a underground Subway so that the road space can be freed back up, and drastically reduce the maintenance and staffing costs of the LRT.

Last edited by Kisai; Jan 25, 2017 at 1:22 PM.
     
     
  #2917  
Old Posted Jan 25, 2017, 4:46 PM
Bdawe Bdawe is offline
Registered User
 
Join Date: Aug 2015
Location: The West End
Posts: 535
Quote:
Originally Posted by Vonny View Post
Some how that proposal manages to miss every concentration of points of interest between Abbotsford and Bridgeport
     
     
  #2918  
Old Posted Jan 25, 2017, 7:02 PM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
Quote:
Originally Posted by Sheba View Post
Also if they have any sense (which is always debatable) they won't build the entire extension to Langley all at once - they'll build it in phases and watch the ridership numbers.

L is just the shape of the route (admittedly upside down). I'm sure they'll come up with a proper (pretentious?) name for it if they get to build it.
They won't. They have Phase 1 as the LRT, and Phase 2 as the Langley Line.


I guess they call it the 'Surrey Mayors are being a b-" route?

On a more realistic note, probably the King George's Line, or something- the line from guildford and down to Langley being converted to Skytrain in Phase 2.


Quote:
Originally Posted by Kisai View Post
The only saving grace with going with that technology is that it's one straight grade-separated line and uses the same automated SelTrac technology as the Skytrain. Without being able to share the rolling stock of the Skytrain, that means that the Canada Line will be more expensive to operate than the Skytrain, and will require separate orders to get more trains. Meanwhile the UBC, Evergreen, Millenium and Expo segments can all use the same rolling stock, and any extensions to PoCo and Langley can also use the same rolling stock.

The more you invest in your own technology, the less it costs the transit system in maintenance and operational costs. The automated trains allow for saving money by dialing up or down frequency. You can't do that on driver-operated trains because union contracts require shifts of specific lengths. So you end up spending money running the trains at the same frequency all day unless a driver calls in sick.

It would have been ideal to use the same technology for everything. But the nature of PPP's is that you must accept the lowest bidder even if it's the least efficient option. PPP's only take into account the capital costs, not operational costs beyond the initial 30 years. Had the Canada Line not been rushed for the Olympics, it's likely the Evergreen line would have been built first as a LRT and then the RAV line being built as a LRT, and then all of south-of-fraser transit going to hell in a handbasket with gridlock. It's the lesson nobody learns from other cities, that multiple independent lines means redundant staffing, maintenance, ticketing and security. As technology improves you can always build a new line with newer backwards-compatible tech, and then refurbish an older parallel line.

That is what I fear is going to happen with both the Canada Line + Arbutus, and the "L line" LRT in Surrey. When the Canada Line is 30 years old, it will likely be beyond it's capacity, so they will build a newer parallel Arbutus line and then shutdown the Canada Line to expand it. With the "L Line" in Surrey they will never recover it's costs in 50 years (these are always 30 year financing things,) and the business case will recommend replacing the LRT (assuming it never gets expanded) with a underground Subway so that the road space can be freed back up, and drastically reduce the maintenance and staffing costs of the LRT.
Why not elevated Skytrain on the L-Line? If there was space for 2 extra lanes, clearly there should be space for 1 in the middle of the road. And could the Canada Line be changed to use the same stock as the rest of the system when it is eventually upgraded (and Artubus converted to LRT or BRT for overflow traffic, depending on what is built in the downtown).

[QUOTE=flipper316;7689468]
Quote:
Originally Posted by fredinno View Post
Extending the high-capacity Expo Line into the lower capacity South of Fraser Suburbs is a bad idea for precisely that reason- It's inefficient to have Expo line cars hovering half-empty around Surrey as the trains in Metrotown are starting to resemble those in East Asia.

Keep the two systems separate. My ideal Skytrain line would go from White Rock along King George to Surrey Central (Transfer), then out from 108 to Guildford, down 152 to Fraser, and from Fraser to Langley Memorial. Only issue is missing out on Surrey Outpatient, but it otherwise fills all the lines from Phase 1, and 2 of Translink's Plan.

It's really the best compromise.

Dude have you ever taken the 502 bus that runs from Surrey Central, via King George Station, then ultimately all down Fraser Highway to Langley. That bus is slowly making its case for one of the busiest routes/corridors in metro Vancouver. I guarantee you if a Skytrain gets built along Fraser Highway it'll be an instant success.
It's less busy than the Expo Line. That's my point. I would expand Expo to Surrey Outpatient, and replace all two phases with a single Skytain line. You can't make them all expo anyways. And I reckon most people that would use it are going to Surrey Central, not Waterfront or Metrotown.

Also, connecting the 104 segment to Guildford would need a fairly sharp turn, while building through the Urban Forest would go through quite a bit of empty land.

Of course, "Phase 2" Fraser (and Guildford) would be the first priority.





And what about downtown? Do we build LRT in the West End Area or dedicated Lane BRT? There's been proposals for a high capacity network in that area for a while now, it's pretty dense.

Last edited by fredinno; Jan 25, 2017 at 7:17 PM.
     
     
  #2919  
Old Posted Jan 25, 2017, 8:45 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by fredinno View Post
Why not elevated Skytrain on the L-Line? If there was space for 2 extra lanes, clearly there should be space for 1 in the middle of the road. And could the Canada Line be changed to use the same stock as the rest of the system when it is eventually upgraded (and Artubus converted to LRT or BRT for overflow traffic, depending on what is built in the downtown).
My point was that one of Surrey's ridiculous claims was over the guideway "dividing" Surrey, when the LRT will do more than just divide Surrey, it will kill and injure countless people by running the LRT down what are essentially busy highways. So in 30 years there will likely be a demand for a full featured subway or "burying" the LRT to reclaim the road space. Same result.

As for the Canada Line or Arbutus Line, the Canada Line would require quite a bit more effort and expense to lengthen to support the same rolling stock the rest of the system uses. So it's more likely they would shut down the Canada Line to refurbish it when the Arbutus Line is operational if they plan to expand it and/or change the rolling stock type.
     
     
  #2920  
Old Posted Jan 26, 2017, 1:22 AM
logicbomb logicbomb is offline
Joshua B.
 
Join Date: Sep 2010
Posts: 1,207
Quote:
Originally Posted by fredinno View Post

It's less busy than the Expo Line. That's my point. I would expand Expo to Surrey Outpatient, and replace all two phases with a single Skytain line. You can't make them all expo anyways. And I reckon most people that would use it are going to Surrey Central, not Waterfront or Metrotown.

Also, connecting the 104 segment to Guildford would need a fairly sharp turn, while building through the Urban Forest would go through quite a bit of empty land.

Of course, "Phase 2" Fraser (and Guildford) would be the first priority.


And what about downtown? Do we build LRT in the West End Area or dedicated Lane BRT? There's been proposals for a high capacity network in that area for a while now, it's pretty dense.
Some here don't remember when the public was citing the Expo Line a failure after trains would arrive nearly empty at New Westminster circia 1990. No one would dare to get off at Royal Oak, Joyce, Edmonds because those were industrial wastelands. Heck, I even remember the media lambasting the government for going through with the Surrey extension.

The difference is that Fraser Highway is actually heavily populated and there is tons of potential to further develop and densify the corridor. This line needs to be built for a variety of reasons but the buses down Fraser Highway are running at crushload capacity even during off-peak hours.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:05 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.