Thanks.
Looks like they made a change since the DP stage.
There was that triangular "bench" deep in the underground levels, which is not shown on those plans.
Im still curious why they left that one corner and then go back and tie in. S few sites have old tunnels that have right away. example in burnaby site has a bench do to train tunnel